Title: Tom Markiewicz
1Beam DeliveryMS
- Tom Markiewicz
- Lehman Review, SLAC
- 26 May 1999
2Vibration IR Prototype RD Milestones
Accelerator Physics Group
Updated Vibration Tolerances
Document Performance/Capabilities
Piezo Movers
Interferometer Sensor
10 m interferometer quad simulator results
10 m prototype results
Complete
Build and Instrument Prototype
Choose Sensor
Test Prototype
CDR
Document, Final Design, Cost
Final IR Layout Design Review
Iterate
IR Magnet Choice and Layout
Test Prototype
LCD Detector Groups
Preliminary Detector Specifications
3Collimator RD Milestones
4Beam Delivery Staffing Plan
5Beam Delivery RD Plan
6MS Sub-totals by Project
7Collimator Wakefield Tests 26K
Design and Fab a second insert with 6 profiles
for study 26K
8Laser Materials Study 200k
9Rotating Metal Collimator 72K
10Optical Interferometer Sensor 20K
MDC Corp. Mechanical Design and fab Vacuum can
redesign 5k Laser transport line
upgrade 10k Optics Parts 5k Mirrors Wind
ows Mounts
11Vib System DAQ 30K
PC with software 5k MATLAB LABVIEW ELECTRONI
CS readout channels 5k DAQ INTERFACE
card Photodiode arrays associated
electronics PIEZO movers and electronics 20K
5-micron stroke piezos( 1K/each) Piezo
Drivers( Function/Noise Generator ) HV
Amplifiers
12IP Prototype Interface 40K
Optical Anchor interface Optics 20k Monit
oring optics Second optical beamline beamspli
tter, windows, mirrors, mounts Mechanical 20
k MDC vacuum products transport line
modifications vacuum can modifications accom
modation for second optical beamline
13IP Layout Prototype 120KBest Engineering
Estimate
Common Q1 - Q1-SC Support Tube Design, Fab,
Install Simulated Q1 (Fe cylinders of appropriate
dimensions) Simulated Q1-SC (SLAC Fe H2O cooled
magnet ?) Tungsten Masks Endcap Door (Concrete
blocks appropriately mounted) Conventional
Facilities interface for simulated
Q1-SC Rigging Conventional services Power,
Cables, Water, Controls, Ventilation
14Tunnel Quad Prototype 60K
Fab and instrument a tunnel quad support (Q2)
Best Engineering Estimate NLC support 45k NL
C mover (exists) Q2 (SLAC magnet) rigging Conv
entional services Power Cables Water Cont
rols Ventilation Instrumentation 15k Senso
rs DAQ
15Very Fast Feedback 50K
Cost of 1 ASIC chip foundry run 50k
16REC testing 90K
Test magnetic properties of 15
material Outsider vendor informal
estimate 30k Build Q1 prototype segment
(Based on PEP-II exp.) 60k Material Assembly
Measure properties