Title: PWO/APD/CSP Development at Hiroshima U.
1PWO/APD/CSP Developmentat Hiroshima U.
- Hiroshima ALICE-PHOS Group
- (T.Sugitate, K.Shigaki, et al.)
- 17 August, 2004, at CERN
2- Presentation Outline -
- Recent Activities on PWO/APD/CSP at Hiroshima
University - readout electronics status update
- CSP design version 3
- continuing property studies of key components
- better expertise on PWO/APD handling
- calorimeter prototype performance evaluation
- beam tests at KEK-PS and Hiroshima-REFER
- Summary and Outlook
- Official Business
3- Pre-amplifier Design Revised (Ver.3) -
- slightly modified layout (see next slide)
- no circuit change from version 2
- proposed and discussed in July, 2004
- version 3 status and plan
- 100 boards in production
- delivery expected in late-September, 2004
- 50 of them w/o capacitor C5 mounted
- to decouple test input pin from signal lines
- to be sent to Iouri at CERN for evaluation
- shipping planned in October, 2004
4- New Pre-amplifier Layout (Ver.3) -
- version 3 mask (black) overlaid on
version 2 photo (green) - components moved (from yellow to red) to make
space around APD soldering holes
5- Pre-amplifier Task and Schedule -
- early decision of CSP version required
- version 2 or 3 on 1st PHOS module ?
- need to complete mass production in JFY04 (ending
March, 2005) - CSP for 1st PHOS module coming soon
- to be ready for assembly by late-January, 2005
6- Past PWO Crystal Property Studies -
- Furukawa Co. Ltd. in Tokyo, Japan
density 8.28 g/cm3 radiation length 0.89
cm Moliere radius 2.2 cm peak emission
420-440 ns refractive index 2.3
Y-doped PbWO4
transmittance measured with Hitachi U3010
spectrophotometer
20 x 20 x 200 mm
ALICE-PHOS operation point
ALICE-PHOS operation point
light yield
mean decay time
7- Recent PWO Crystal Property Studies -
- RINC Co. in Minsk, Belarus
- adopted by CMS
- investigated similar properties as Furukawas
- ref. graduation thesis by K.Yokoyama
- (available only in Japanese)
- North Crystal Co. in Apatity, Russia
- adopted by ALICE-PHOS
- detailed investigation ongoing at Hiroshima
- further comparison of crystals in progress
8- Expertise on PWO/APD Handling -
- cooling with Peltier modules
- stable operation down to 0 ºC
- better ground handling to reduce noise
- successful operation of APD readout system
9- Prototype Performance Evaluation -
- prototype components
- PWO crystals Furukawa (Japan) / RINC (Belarus)
/ North Crystal (Russia) - PMT Hamamatsu R1450
- APD Hamamatsu S8664
- pre-amplifier Hiroshima ver.1/2
- cooling Peltier modules
- tests in Japan
- Tohoku-LNS (2002) photons at 0.8 1.2 GeV
- Hiroshima-REFER (2003/04) electrons at 150 MeV
- KEK-PS (2004) electrons at 0.5 2 GeV
10- Past Beam Tests at LNS/REFER -
- w/ PMT readout
- sE/E 2.5 /?E GeV ? 1.3
- sx 2.3 mm/?E GeV
- noise problem with APD at room temp.
counts a.u.
Etotal 141 MeV s/Etotal 7.3 2.8 /?E
total energy MeV
11- Recent Beam Test at KEK-PS -
- prototype w/ real ALICE-PHOS components
- NC PWO Hamamatsu APD
- electron enriched non-separated (IT) beam
- negatively charged
- electron/beam 1 before online enrichment
- beam momentum scan
- 0.5 GeV/c 2.0 GeV/c
- APD HV scan
- 380 430 V (400 V nominal)
12- KEK-PS T564 (16-23 June, 2004) -
- 31.3 M total (mixed) triggers
- including 664 K electron triggers
- successful operation of APD readout
13- PWO/APD/CSP/Readout Signals -
ADC distributions
pre-amplifier output
punch-through hadrons
electrons
shaping amplifier output
14- Hiroshimas Prototype Performance -
- sE/E 5.5 at 1 GeV/c, 3.1 at 2 GeV/c
- with quick and rough near-line calibrations
- including significant beam momentum spread
- analysis ongoing to subtract external
contributions
electrons in center cell selected
gas cherenkov hit required
15- cf. Kurchatovs Prototype Performance -
- Kurchatov 16?16 prototype
- sE/E at 25 ºC
- 1.3 /E GeV ? 3.6 /?E GeV ? 1.1
16- Summary and Outlook -
- charge-sensitive preamplifier (CSP) design
revised version 3 in test production - CSP for 1st PHOS module by January, 2005
- continuing basic property investigation of PHOS
key components (PWO/APD/readout) - several prototypes fabricated/tested
- better local expertise
- independent PHOS prototype performance evaluation
in progress
17- Official Business -
- applied for ALICE associate collaboration
- together with Tokyo and Tsukuba Universities
- approval requested at next ALICE meeting
- official PHOS participation expected soon
18- PHOS Collaboration at Hiroshima U. -
- 3 staffs, 10 graduate students
- H.Harada, K.Haruna, K.Hirashita, K.Homma,
K.Hosokawa, R.Kohara, Y.Nakamiya, M.Ouchida,
H.Sakata, K.Shigaki, T.Sugitate, D.Toyoda,
Y.Tsuchimoto, K.Yokoyama - Hiroshima PHOS web page
- http//www.hepl.hiroshima-u.ac.jp/quark/pwo/