HARMONISATION OF ATM SAFETY REGULATION IN ECAC - PowerPoint PPT Presentation

1 / 35
About This Presentation
Title:

HARMONISATION OF ATM SAFETY REGULATION IN ECAC

Description:

... and sharing of safety information ISSUES FOR THE FUTURE Continuing institutional change Single European Sky EASA ... One minor point, to ... will not form a ... – PowerPoint PPT presentation

Number of Views:134
Avg rating:3.0/5.0
Slides: 36
Provided by: Valued426
Category:

less

Transcript and Presenter's Notes

Title: HARMONISATION OF ATM SAFETY REGULATION IN ECAC


1
  • HARMONISATION OF ATM SAFETY REGULATION IN ECAC
  • Peter Stastny
  • Head of Safety Regulation Unit
  • EUROCONTROL
  • FAA/JAA Annual Conference 5th June 2002
  • Phoenix, Arizona

2
Presentation Overview
  • Developments in ATM safety regulation
  • European Programmes - safety regulatory
    aspects
  • Safety oversight
  • Just Culture
  • GAIN
  • Issues for the future

3
EUROCONTROL Institutional structure


Civil/Military InterfaceCommittee
(Ministers level)
Audit Board
General Assembly
(DGCAs Level)
Performance ReviewCommission
Safety Regulation Commission
Council
Functional
Functional
(Director General) Agency
PerformanceReview Unit
SafetyRegulation Unit
Administrative
Administrative
4
SRC MEMBERSHIP
  • One Commissioner per EUROCONTROL Member State
    Advisers and Observers
  • Non-member ECAC States
  • ATM service providers, airspace users
  • Aviation organisations
  • Professional organisations
  • JAA, ICAO, FAA, TC, EC
  • Military representation

5
KEY SRC FUNCTIONS
  • Within ECAC
  • Co-ordinate ATM safety regulation
  • Develop safety regulatory requirements and
    associated safety standards
  • Define and assess target levels of safety, and
    standards of safety performance
  • Monitor national application of EUROCONTROL
    safety regulatory requirements
  • Co-ordinate with national / regional / global
    safety regulatory bodies
  • A similar role to that undertaken by JAA in
    other aviation sectors

6
NATIONAL NEEDS FOR ATM SAFETY DEVELOPMENT
SAFETY REGULATORS
SERVICE PROVIDERS
Safety Management (through ATM Service Providers)
Safety Regulation (through ATM Safety Regulators)
CO-ORDINATION SUPPORT HARMONISATION
CO-ORDINATION SUPPORT HARMONISATION
INPUTS NEEDS
INPUTS NEEDS
EUROCONTROL WORK
EATMP Safety Domain (Safety Group/SQS)
  • COMMON SAFETY TASKS


SRC (supported by SRU)
SAFETY MANAGEMENT DELIVERABLES
  • SAFETY
  • REGULATION
  • DELIVERABLES

COMPLIANCE WITH REGULATORY PROVISIONS
7
SRCs INTERFACE with JAA
  • JSSI
  • JSSI Steering Group
  • Action Plan Team
  • Outputs in SRC Doc 10
  • CNS/ATM Steering Group
  • Regulation Sectorial Team
  • In SRC

8
SRC WORK PROGRAMME OBJECTIVES
TO PRODUCE SAFETY REGULATORY FRAMEWORK FOR
ATM ACROSS THE ECAC REGION
TO CO-ORDINATE FRAMEWORK IMPLEMENTATION ACROSS
THE ECAC REGION
TO ESTABLISH A PROCESS TO MEASURE SAFETY
PERFORMANCE AND IDENTIFY ATM KEY RISK AREAS
9
NATIONAL ATM SAFETY REGULATORY FRAMEWORK (SRC
Policy Doc 3)
  • Contents include-
  • NATIONAL SAFETY REGULATORY RESPONSIBILITIES
  • SETTING MINIMUM ACCEPTABLE LEVELS OF SAFETY
  • RULE-MAKING
  • DEFINING REQUIREMENTS, STANDARDS AND
    PRACTICES
  • SAFETY REGULATORY APPROVALS
  • ROLE and REGULATION OF SAFETY MANAGEMENT
    SYSTEMS
  • SAFETY OVERSIGHT

10
EUROCONTROL SAFETY REGULATORY REQUIREMENTS
(ESARRs)
  • EUROCONTROL Member States obliged to implement -
    remaining ECAC States encouraged
  • Complement ICAO SARPs
  • SRC initial rulemaking
  • formal 3-stage consultative, traceable process
  • consistent with JAR 11
  • All documents approved or in final consultation
    are on the website (www.eurocontrol.int/src)
  • Full alignment with ENPRM to now commence
  • Prioritisation based on safety benefits

11
ESARR ADVISORY MATERIAL(EAM)
  • Acceptable Means of Compliance - AMC
  • Companion Documents - COD
  • Guidance Material - GUI
  • Reference Material - REF
  • ICAO Consistency - ICAO

12
ESARR 2OCCURRENCE REPORTING AND ASSESSMENT IN ATM
  • Phased Introduction since 1-1-2000
  • AMC - National reporting schemes -
    TOKAI - Annual Summary Template
  • COD - Severity Classification scheme -
    Publication and Confidentiality Policy
  • GUI - In place
  • REF - HEIDI Taxonomy

13
ESARR 3USE OF SAFETY MANAGEMENT SYSTEMS
  • Effective July 2003
  • AMC - Nationally approved SMS - EUROCONTROL
    EATMP Safety Policy
  • GUI - 4 documents in place incl. Safety
    Oversight Small Organisations
  • Exceeds ICAO Annex 11 requirements

14
ESARR 5ATM SERVICES PERSONNEL
  • General and ATCO Requirements effective Nov.
    2003
  • AMC - National licensing schemes - EUROCONTR
    OL Licensing Manual
  • GUI - Supplementary material incl. Common
    Core Training Medical Requirements
  • Complements ICAO Annex 1 except for Rating
    Classifications

15
ESARR 4RISK ASSESSMENT AND MITIGATION
  • Effective April 2004
  • AMC - National arrangements - EUROCONTROL
    Safety Assessment Methodology - ED 78A /
    DO 264
  • GUI - In progress
  • Anticipates ICAO Annex 11 requirements

16
ESARR 1 ATM SAFETY REGULATORY FRAMEWORK
ESARR 2 ATM SAFETY OCCURRENCES
ESARR 3 SAFETY MANAGEMENT SYSTEMS
ESARR 4 RISK ASSESSMENT AND MITIGATION
ESARR 5 ATM PERSONNEL
ESARR 6 SYSTEMS SW HW
ESARR 7 ATM PROCEDURES
ATM
17
ACCEPTABLE MEANS OF COMPLIANCE
ESARR 1 ATM SAFETY REGULATORY FRAMEWORK
GUIDANCE MATERIAL FOR REGULATORS
FOR EACH ESARR
AMC
AMC
AMC
ESARR 2 SAF. OCCURRENCES
AMC
FOR ESARR 3
FOR ESARR 3
GUIDANCE MATERIAL FOR REGULATORS
ESARR 3 SAFETY MANAGEMENT SYSTEMS
AMC
AMC
AMC
FOR ESARR 4
AMC
FOR ESARR 4
ESARR 4 RISK ASSESSMENT AND MITIGATION
AMC
AMC
FOR ESARR 5, 6, ...
AMC
ESARR 5 ATM PERSONNEL
ESARR 6 SYSTEMS SW HW
ESARR 7 ATM PROCEDURES
AMC
FOR ESARR 5, 6, ...
18
Acceptable means of compliance
ACCEPTABLE MEANS OF COMPLIANCE
FOR EACH ESARR
ESARR 1 ATM SAFETY REGULATORY FRAMEWORK
GUIDANCE MATERIAL FOR REGULATORS
AMC
AMC
ESARR 2 SAF. OCCURRENCES
AMC
GUIDANCE MATERIAL FOR REGULATORS
AMC
FOR ESARR 2
FOR ESARR 3
AMC
AMC
ESARR 3 SAFETY MANAGEMENT SYSTEMS
FOR ESARR 3
AMC
AMC
FOR ESARR 4
AMC
ESARR 4 RISK ASSESSMENT AND MITIGATION
AMC
FOR ESARR 4
AMC
AMC
FOR ESARR 5, 6, ...
AMC
ESARR 5 ATM PERSONNEL
ESARR 6 SYSTEMS SW HW
ESARR 7 ATM PROCEDURES
AMC
FOR ESARR 5, 6, 7.
EATMP Programme Safety Deliverables
19
ESARR IMPLEMENTATION PROGRAMME
Promotional Literature CD Video Web-site
Helpdesk
Guidance Material Means of Compliance
Active support programme for national stakeholders
20
ECIP Objective for ESARR 3
21
SRC 03 Status report in 2002
22
EUROCONTROL PROGRAMMES
  • GNSS ? ACAS
  • 8.33 ? RVSM
  • LINK 2000 ? Free-Route Airspace
  • A-SMGCS ? ADS (inc. NEAN Update)
  • RNAV ? EAD
  • Mode S ? FUA
  • Airport Operations ..etc.

23
EATMP PROGRAMMES
APPROVAL PROCESSES
National ATS providers
Inputs/co-ordination
EATMP programmes (GNSS, RVSM, ACAS..)
Submission of safety policy and arguments, with
related operational assumptions
Request for approval in national context of
operations
Final approval
Co-ordinated views on acceptability of safety
policy and arguments
National Regulator
SRC Co-ordination
24
ATM SAFETY OVERSIGHTSafety Regulatory Framework
  • Definition of national safety objectives,
    consistent with internationally agreed
    equivalents
  • Safety regulatory policies and principles
  • Regulations (to apply to Operations,
    Organisations, Systems and People)
  • Safety measurement and feedback
    mechanisms, to support safety
    decision-making

25
ATM SAFETY OVERSIGHTFramework Implementation
  • Definition, implementation and demonstration
    of means of compliance with regulations
  • Effective national safety oversight of ATM
    operations
  • Ability of ATM safety roles and functions to
    be undertaken
  • effectively
  • in conjunction with one another
  • consistently with other aviation domains
  • ICAO 33rd Assembly resolution

26
ENGINEERING A JUST CULTURE
  • ECAC Ministerial requirement for
    penalty-free reporting
  • Conditions the effectiveness of the entire
    safety feedback process
  • No magic implementation solution, but...
  • We are working on the necessary
    prerequisites.

27
ENGINEERING A JUST CULTURE
28
DEFINING THE BORDERS OF BAD BEHAVIOUR
unintentional
deliberate
deliberate
29
ENGINEERING A JUST CULTURE
  • Concerns over -
  • Information Misuse
  • Punishment/Enforcement
  • Criminal Sanctions
  • Civil Litigation
  • Public Access
  • ICAO Position - Annex 13
  • The case continues..

30
GAIN W G E
  • Start-up activities under way
  • 3 telecons
  • Initial meeting 25th April
  • Action plan and detailed task plans set
  • Timescales till June 03 (6th Conf.)
  • Next meeting Sept / Oct 02 (Brussels)
  • Those involved..

31
GAIN WG E
  • Those involved..
  • FAA HQ operational units
  • US Military
  • US Representative bodies - NATCA, ALPA
  • European/Global Representative bodies -
    EUROCONTROL, IATA IFATCA, IFALPA, CANSO
  • ..more welcome

32
GAIN WG E ACTION PLAN
  • In relation to the interface between the Flt Ops
    and ATC Ops communities-
  • Promote confidential, non-punitive reporting
    and exchange of safety information
  • Identify initiatives that promote and facilitate
    communication and information exchange
  • Facilitate the establishment / enhancement of
    information collection /exchange programs
  • Promote increased collection and sharing of
    safety information

33
ISSUES FOR THE FUTURE
  • Continuing institutional change
  • Single European Sky
  • EASA
  • Global regulatory issues in ATM, incl.
  • Provisions in SARPs
  • IUSOAP

34
CONCLUSIONS
  • Institutional change continues as a major
    feature in European ATM
  • ATM Safety Regulation is increasingly necessary,
    mature and better established
  • A harmonised ATM safety regulatory framework is
    the answer - implementation well under way
  • Further gains in effectiveness through the
    Single European Sky
  • A total aviation system approach is vital, with
    strong links to major aviation bodies

35
  • HARMONISATION OF ATM SAFETY REGULATION IN ECAC
  • Peter Stastny
  • Head of Safety Regulation Unit
  • EUROCONTROL
  • FAA/JAA Annual Conference 5th June 2002
  • Phoenix, Arizona
Write a Comment
User Comments (0)
About PowerShow.com