PPP IN HIGHWAYS WORKSHOP - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

PPP IN HIGHWAYS WORKSHOP

Description:

Title: A1 Darrington to Dishforth DBFO Project Subject: Effect on NYCC Author: Chris Plumb Last modified by: Alec Briggs Created Date: 11/17/1999 11:32:44 AM – PowerPoint PPT presentation

Number of Views:75
Avg rating:3.0/5.0
Slides: 21
Provided by: ChrisP166
Category:
Tags: highways | ppp | workshop

less

Transcript and Presenter's Notes

Title: PPP IN HIGHWAYS WORKSHOP


1
  • PPP IN HIGHWAYS WORKSHOP
  • WASHINGTON 3 APRIL 2006
  • RECENT DEVELOPMENTS IN PRIVATELY- FINANCED
    HIGHWAY PROJECTS IN THE UK
  • by
  • ALEC BRIGGS
  • SENIOR PROJECT LEADER, HIGHWAYS AGENCY

2
THE ROLE OF THE HIGHWAYS AGENCYAn Executive
Agency of the Department for TransportResponsibl
e for operating, maintaining and improving the
strategic road network in EnglandIn conjunction
with the Highways Agencys Customer First
initiative, its primary aims are to provide
  • Safe Roads
  • Reliable Journeys
  • Real-Time Information for Travellers

3
Englands Strategic Road NetworkComprises
8,000 km / 5000 miles of motorways and trunk
roadsAsset valued at 72bnCarries a third of
all traffic and two-thirds of freight
trafficOver 170 bn vehicle-kilometres per annum
4
Categorisation of Major Improvement Projects in
TPI (October 2005)
Key MW Motorway Widening TRW Trunk Road
Widening J Junction Improvements B Bypasses
5
Speeding-up Delivery
6
DBFO PROJECTS AWARDED TO DATE
  • Tranche 1 Works Payment Contract
  • Cost Mechanism Award
  • A69 Newcastle to Carlisle 9.4m Shadow tolls Jan
    1996
  • A1(M) Alconbury to Peterborough 128m Shadow
    tolls Feb 1996
  • A417/A419 Swindon to Gloucester 49m Shadow
    tolls Feb 1996
  • M1-A1 Motorway Link, Leeds 214m Shadow
    tolls Mar 1996
  • Tranche 1A
  • A50/A564 Stoke to Derby Link 20.6m Shadow
    tolls May 1996
  • A30/A35 Exeter to Bere Regis 75.7m Shadow
    tolls July 1996
  • M40 junctions 1-15 37.1m Shadow tolls Oct 1996
  • A168/A19 Dishforth to Tyne Tunnel 29.4m Shadow
    tolls Oct 1996
  • Tranche 2
  • A13 Thames Gateway, London 146m Lane
    availability Apr 2000
  • (Transferred to T f L in July 2000)
  • A1 Darrington to Dishforth 245m Congestion Feb
    2003
  • A249 Stockbury to Sheerness 100m Congestion Feb
    2004

7
TYPICALCONTRACTUAL ARRANGEMENTS
Total No. of contracts 160
8
Development of Payment Mechanisms in DBFO Projects
CONGESTION MANAGEMENT PAYMENT MECHANISM
Future M25 London Orbital likely to be
availability-based mechanism
9
A1 Darrington to Dishforth DBFO Project
  • Project includes
  • 2 TPI Schemes
  • A1(M) Ferrybridge to Hook Moor
  • A1(M) Wetherby to Walshford

and new or upgraded Motorway Communications
Facilities throughout
Works cost 245m Concession period 33 years
10
Congestion Management Payment Mechanism D2D
ContractComprises 2 separate key elements based
on
(a) Active management of traffic
congestion (i.e. minimising congestion)(b) Act
ive management of traffic safety (i.e.
minimising Personal Injury Accidents (PIAs))
11
(a) Active Congestion Management
  • Allocation of payment amounts and measurement of
    traffic
  • Whole Project Road divided into 50 NO 2 KM LONG
    CARRIAGEWAY SECTIONS (25 NB and 25 SB)
  • GROSS ANNUAL PAYMENT (as tendered) allocated to
    whole project road to give amounts for EACH HOUR
    on EACH CARRIAGEWAY SECTION pro-rata previous
    hourly traffic flows
  • VEHICLE SPEEDS and VOLUMES measured AUTOMATICALLY
    using a MONITORING SYSTEM based on inductive loop
    detectors (in carriageway surfacing)

12
Monitoring System Out-station Equipment
  • Inductive loops GR Marksman 660 counters
  • CCTV cameras for verification
  • Dedicated fibre optic cables for signal
    transmission

13
Congestion Management Payments
Minimum Condition Criteria must be met before any
payment made
14
  • (b) Active Safety Adjustment
  • Criteria for Safety Payments or Deductions

Zone A no adjustments Zone B enhanced
adjustments Zone C standard enhancements
-8
-2
2
8
15
Stepped-Up Construction Period Payments
of Full Payments
Note During construction period, lane closure
charges also apply
Time
16
  • CURRENT STANDARDS FOR OPERATION AND MAINTENANCE
  • DBFO Co obliged to automatically adopt revised or
    new standards
  • Only exception Step Change (remote
    unforeseeable change affecting whole motorway and
    trunk road network)
  • Not applicable to design and construction
    (standards fixed)

17
SOME LESSONS LEARNT FROM DBFO PROCUREMENT
  • Schemes with large new-build elements more viable
    (more risk)
  • Need to reduce tendering costs
  • Need to reduce tendering / negotiation period
  • Need for well-resourced DBFO companies
  • Need to streamline contractual procedures

18
FUTURE PRIVATELY-FINANCED / DBFO PROJECTS
  • Motorway Widening Schemes
  • M25 London Orbital circa 1.5bn
  • M1 J21 - J30 circa 2bn
  • M6 J11A - J19 circa 2bn (possible toll road)

19
M25 London Orbital
20
Thank You