Title: Mission Directorate Exploration Systems
1DART Mission Assurance Process Map
Chief SMA Officer
Mission Directorate Exploration Systems
Mission Directorate Space Operations
Explorers Program Office
KSC CD
MSFC CD
KSC SMA
1
KSC LSPO
MSFC SMA
DART Project Office (J. Snoddy)
LS SMA MAM (J. Roddy)
2
SFIA (D. Elliott)
DART Contract (CPIF)
SELVES Contract (FFP)
LSP Eng Teams (J. Wood, B. Henry)
VAFB - Range Safety - Ground Safety - Range LRR
4
Orbital Sciences Corp. LSG-Pegasus
Orbital Sciences Corp. LSG-DART
DART SMA Mgr (M. Kennedy)
3
5
S/W IVV (P. Medley)
Pegasus
L10-11
VAFB INT OPS
DART
10
7
8
9
6
FAA -- L1011
Airworthiness -- Public Safety
KSC LS SMA 1 SMA (T.
Arrigo)
KSC LS SMA Quality Mgr (K. Monette)
Safety Mgr (H. Schultz)
KSC LSP Mission Int. (Bellinger) Res. Office
(Westoff)
OSC LSG Qual,SafetyRel Assurance
OSC TSD Quality Assurance
MSFC SMA Test Engr (Kalia)
OSC S/W Assur.
11
15
12
13
14
Vehicle
ARPO
AVGS
Matrix-ed relationship Direct report
relationship Information flow Independent MA
activity In-line MA activity
18
21
16
20
17
19
MSFC SMA DART S/W Assurance (Mitchell)
DART SMA Qual Eng (Pierce)
MSFC SMA DART S/W Assurance (Mitchell)
MSFC DART SMA Qual Insp (Blair)
MSFC DART SMA Qual Assur (Rains)
2Ref Mission Phase DART Mission Assurance Activities Location Point of Contact Organization
1 1,2,5-10 KSC SMA/Launch Services Division SMA (KSC LS SMA) Mission Assurance Mgr. Pegasus Flt. Readiness assessment and SMA support to KSC Launch Services Program (LSP) (L3) KSC Jordan Roddy KSC LS SMA
2 2 KSC SMA Space Flight Independent Assessment (SFIA) Focused IA to KSC LSP (L3) KSC Dawn Elliott KSC LS SMA
3 2,5-10 LSP Vehicle Engineering Specialty Teams Chief Engr and Vehicle Systems Lead. Mission Analysis, ERBs, TIMs, Design Reviews, Readiness Reviews, Project Decision Meetings, Mission-Unique Design Validation and Verification to Orbital Sciences Corp. (OSC) Launch Services Group (LSG) Pegasus (L4-5) KSC James Wood Bob Henry KSC LSP
4 3,4,5 DART SMA Manager to OSC LSG-DART Reliability prediction/FEMA, Safety Training (L5) Hazard analyses, Monitoring of mishap reporting, GIDEP alerts, Review of discrepancy reports, Limited Life Item Status, Mission Risks Review, Waivers/Deviations Review (L3) Dulles Marcie Kennedy MSFC SMA
5 2-7 Software IVV to DART operational elements (L3) GSFC Peter Medley NASA HQ
6 9 FAA oversight of L10-11 (Airworthiness and Public Safety) Moave FAA
7 5-10 KSC LS SMA Quality Management to Pegasus Integration Test (L3) VAFB Kevin Monette KSC LS SMA
7 5-10 KSC LS SMA Safety Management to Pegasus Integration Test (L3) VAFB Heidi Schultz KSC LS SMA
8 2,5-10 KSC LSP Mission Integration Engineering (Spacecraft integration to LV). Approval of integration reqmts. (L4-5) Dulles Frank Bellinger KSC LS SMA
9 2,5-10 KSC LSP Resident Office Engineering support to VAFB Payload Integration and Launch Operations (L4) Chandler Wendy Westoff KSC LSP
10 2,5-10 KSC LS SMA support to VAFB Payload Integration and Launch Operations (L4) KSC Tony Arrigo KSC LS SMA
11 1-10 OSC LSG Quality, Safety Reliability Assurance to Vehicle Hardware Development and Test (direct in-line contractor participation) (L5) Dulles OSC LSG
12 3,4 Systems Test Engineering and Reliability Consultation to Vehicle Hardware Development and Test (L3) Dulles Prince Kalia MSFC SMA
13 3,4 Systems Test Engineering and Reliability Consultation to AVGS Hardware Development and Test (L3) Dulles Prince Kalia MSFC SMA
14 1-7 OSC Technical Services Division (TSD) Quality Assurance to AVGS Hardware Development and Test (direct in-line contractor participation) (L5) Dulles OSC TSD
15 2-7 OSC S/W Quality Assurance to Autonomous Rendezvous Proximity Operations (ARPO) S/W Development (L5) Dulles OSC
16 2-7 Software Assurance to DART on-board computer software development (L3) MSFC George Mitchell MSFC DART SMA
17 3,4 Quality Engineering surveillance of Vehicle Hardware Development, Assembly, and Test (L5) Dulles Jim Pierce MSFC SMA
18 3,4 Quality Engineering surveillance of AVGS Hardware Development and Test, and vehicle systems integration test (L5) Dulles Jim Pierce MSFC SMA
19 1,2,3 Quality Assurance SMA surveillance to AVGS Hardware Development and Test (L5) Dulles Rains MSFC DART SMA
20 1 Quality Assurance (Receiving Inspection) to AVGS Hardware Development (L5) MSFC Blair MSFC DART SMA
21 2-7 Software Assurance to AVGS Software Development (L5) MSFC George Mitchell MSFC DART SMA
- Mission Phases
- 1. Procurement, 2. Design (HW SW), 3. Payload
Manufacture, 4. Payload Systems test, 5. S/C
integration to LV, 6. LV integration, 7. System
test and Simulated flight, 8. Pre-launch Ops,
9. Launch ops, 10. Post-launch ops.