Document and Record Keeping ... file is important for court Daily Job Diary Also called daily journal or report One of the most important PM tools and job site ... – PowerPoint PPT presentation

Number of Views:82
Avg rating:3.0/5.0
Slides: 9
Provided by: peopleSu
Category:

less

Transcript and Presenter's Notes

Title: Document and Record Keeping


1
Document and Record Keeping
  • CTC-470

2
Project Files
  • Important tools
  • Indispensable for managing project
  • Must have a logical organization
  • Must have documents filed properly
  • Chronological order in each file
  • Each file is on a specific subject or
    subcontractor
  • Keep contract or PO info on left side and
    everything else on right side of folder

3
Project Files
  • File system designed by PM
  • Project clerk maintains files
  • Use alphanumeric or numeric codes
  • Use same system in entire construction co.
  • Use CSI or WBS numbers for filing
  • Keeps estimate items and subcontract in same
    place
  • F 11-2
  • Files should be on site for easy access by PM

4
Routing Stamp
  • F11-3
  • Used to make sure that all parties see document
  • Do not want to use original
  • Make copy and route it in reading file
  • Archive file when done
  • Provides backup to files
  • A complete file is important for court

5
Daily Job Diary
  • Also called daily journal or report
  • One of the most important PM tools and job site
    records
  • Contemporary record of each days events
  • Legal record of daily job site activity
  • Change order backup documentation
  • Back charge and claim documentation
  • Historical record of schedule process
  • Figure 11-4

6
Daily Job Diary
  • Should be done by Proj Super
  • Should be done on a daily basis
  • Historical document
  • Legal document
  • Done in ink
  • All subs should do daily diary

7
Control Logs
  • Provide summary reports of communications
    processes during project
  • Logs for POs, Field questions, submittals,
    Contract Change Directive, Sketches, drawings, CO
    proposal, transmittal, letter, telephone,
    subcontract modification, close-out

8
Record Drawings
  • Original drawings from contract
  • Current set of drawings for project with mark-ups
  • Permit set stamped by municipality
  • As-built
  • Submittal drawings