Available Flow-gate Capacity Stakeholder Kickoff Meeting - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Available Flow-gate Capacity Stakeholder Kickoff Meeting

Description:

Yes on Wednesdays except for the first meeting which will be scheduled 4 weeks from the kick-off meeting due to Mardi Gras. Duration of meetings One day, 9AM ... – PowerPoint PPT presentation

Number of Views:106
Avg rating:3.0/5.0
Slides: 9
Provided by: sow32
Category:

less

Transcript and Presenter's Notes

Title: Available Flow-gate Capacity Stakeholder Kickoff Meeting


1
Available Flow-gate CapacityStakeholder Kickoff
Meeting
  • January 19, 2005

2
Discussion Today
  • Introductions
  • Objectives of stakeholder process
  • Ground rules
  • Process for conducting stakeholder meetings
  • Define and prioritize AFC stakeholder issues
  • Status of Scenario Analyzer and stakeholder
    feedback
  • Meeting schedule, frequency and location(s)
  • Next Steps

3
Objectives
  • Improve the AFC process through stakeholder input
  • Draw from stakeholder experience in other regions
  • Ensure there is a consistent understanding of the
    AFC process by all participating stakeholders
  • Make changes to the AFC process to improve the
    overall quality and transmission customer
    satisfaction where possible

4
Ground Rules
  • Ongoing dockets at FERC will prevent the
    discussion of certain information and issues
  • Initially limited to those issues outlined in
    FERCs AFC Order
  • Issues discussed can be expanded if FERC agrees
    to Entergys proposal to conduct an audit of the
    AFC process as opposed to conducting a hearing
  • The overall set of recommendations will be
    synthesized to determine which changes can be
    implemented as well as the overall implementation
    costs, and the time required to make the changes.
  • The final set of recommendations chosen for
    implementation will be reviewed with stakeholders
    including the timeline for implementation and the
    projected cost to implement, as well as any
    required regulatory approvals

5
Stakeholder Meeting Process
  • Should each issue be discussed in an open forum
    with all stakeholders?, or
  • Should certain issues be identified for
    discussion by small breakout groups who will
    report back to the larger group?
  • Should specific time limits be placed on each
    issue discussion or speakers to ensure that a
    single issue or speaker does not monopolize the
    meeting schedule?
  • Others?

6
Define and Frame Issues
  • Mark and Uma

7
Meeting Schedule
  • Frequency every three weeks? Yes on Wednesdays
    except for the first meeting which will be
    scheduled 4 weeks from the kick-off meeting due
    to Mardi Gras.
  • Duration of meetings
  • One day, 9AM 3 PM
  • Location Houston
  • Develop Meeting Calendar
  • Issues to be discussed and time allotment
  • Meeting calendar will be finalized once Entergy
    receives prioritized list of issues from
    stakeholders.

8
Next Steps
  • Entergy will issue the draft stakeholder process
    and timeline based on the set of issues framed by
    stakeholders in kick-off meeting
  • Entergy will forward Stakeholder Kick-off
    presentation to stakeholders. Stakeholders agreed
    to provide comments via email on the proposed
    stakeholder meeting process, objectives and
    ground rules. We will review and finalize at the
    next scheduled stakeholder meeting.
  • Entergy will forward issues list to stakeholders
    for review and prioritization for discussion in
    the stakeholder meetings. Stakeholders will
    provide prioritized list via email one week from
    date of issuance of email from Entergy.
Write a Comment
User Comments (0)
About PowerShow.com