Brian Grist - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Brian Grist

Description:

www-glast.slac.stanford.edu – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 12
Provided by: Pet1164
Category:
Tags: brian | grist | msproject

less

Transcript and Presenter's Notes

Title: Brian Grist


1
Integration, Test, and Calibration
  • Brian Grist
  • Integration and Test Engineer
  • bgrist_at_slac.stanford.edu

2
IT Milestones
  • TKR CAL Modules A B Ready for
    Integration into Calibration Unit 08/15/03
  • TKR CAL Modules 1 2 Ready for
    Integration into Calibration Unit 11/03/03
  • Calibration Unit Beam Test Complete 04/17/04
  • Flight Grid Ready for Integration 01/02/04
  • Flight TKR CAL Modules 3 4 Ready for
    Integration 01/02/04
  • Flight TKR CAL Modules 15 16 Ready for
    Integration 03/24/04
  • Flight TKR CAL Modules 1 2 Ready for
    Integration 04/26/04
  • Flight ACD Ready for Integration 04/26/04
  • LAT Instrument Ready for Environmental
    Testing 07/09/04
  • LAT Instrument Pre- ship Review 01/07/05
  • LAT Instrument Ready to Ship 03/01/05
  • GLAST Launch
    03/06

3
IT Schedule
4
Draft IT Cost Estimate (FY99)
5
Integration Test Cost Estimates
  • P3 Cost Loading Report

6
Mapping of WBS items to Manager Responsibility
ITC Manager E. Bloom WBS 4.1.9
IT Engineer B. Grist WBS 4.1.9.1
Reliability QA D. Marsh WBS 4.1.9.2
Instrument Operations Coordinator S. Williams
Online Manager R. Claus
Ground Support Equipment TBD
Environmental Test Manager M. Lovellette
Calibration, Analysis and Science
Verification E. do Couto e Silva
Particle Test Manager G.Godfrey
Integration, Facilities, Configuration, and
Test O.Millican (Acting)
IT Preparation 4.1.9.3 EM Model
IT Calibration Unit IT 4.1.9.4 Flight LAT IT
4.1.9.6 Mission IT Support 4.1.9.7
7
On-Project vs. Off-Project Manpower
  • IT Organization must rely heavily on Off-Project
    manpower
  • Off-Project Manpower
  • Elliott Bloom
  • Eduardo do Couto e Silva
  • Gary Godfrey
  • Paul Kuntz
  • Hiro Tajima
  • Post Doc (currently 1.5)
  • Stanford Graduate Students (currently 4)
  • other contributed collaboration labor for tasks
    like Calibration under Eduardo and staffing of
    shifts during tests under Ossie
  • Current On-Project Manpower
  • Brian Grist
  • Ric Claus
  • Ossie Millican
  • John Broeder
  • NRL Team (Environmental Testing)
  • TBD Programmer (for Eduardo)
  • TBD GSE (Mechanical Engineer)
  • other resources that are being identified

8
DRAFT - Fiscal Year vs. FTE
9
DRAFT - On and Off Budget FTE
10
Choices that Impact Schedule and Budget
  • NRL as Environmental Test Site Choice
  • Schedule
  • Environmental tests at NRL all in one trip will
    reduce schedule impact due to shipping and
    verification testing.
  • Budget
  • Environmental tests at NRL will fit within the
    budget allocated for Acoustic/Vib and Thermal
    Vacuum
  • 600k (escalated) for tests at NRL
  • Fits within (escalated) currently allocated
    budget
  • One beam test at SLAC only (drop CERN test)
  • Schedule
  • Saves about one month in the IT timeline
  • Budget
  • Reduction in the shipping and cost due to two
    functional checkouts

11
IT schedule and budget work
  • IT managers are addressing their schedule and
    budget requirements and these will need to be
    folded into the official schedule and budget
  • IT plan needs to be agreed upon before loading
    into P3
  • Updated Schedule and resources needs to be loaded
    into P3
  • Rectify differences in the Resource Loaded P3
    schedule and the budget restrictions
Write a Comment
User Comments (0)
About PowerShow.com