AP30/30A Plans Lists WorkshopExamination of a
Satellite Network submitted under Article 4
2
Examination of Part A submissions under
4.1.3/4.2.6 of Article 4 of Appendices 30 and 30A
(1)
Each downlink submission shall be in compliance
with the limits of Annex 7 of Appendix 30. The
technical examinations required for the
publication of the Part A Special Section under
4.1.5/4.2.8 of Article 4 of Appendices 30 and 30A
are listed on the next slides. For each network
published under the above-mentioned provisions,
the results of MSPACE calculations are included
in a zip file in the corresponding BR IFIC at the
following location D\Data\SpacePlans\MSPACEg_res
ults\MSPACEg_results_IFIC9999.zip The latest
SPS_ALL1 database containing the processed
Article 4 networks is also included in that BR
IFIC at the following location D\Data\SpacePlans
\SPS\SPS_ALL_IFIC9999.zip Where 9999 represents
the corresponding BR IFIC no. 1 Space Plans
Systems database (SPS_ALL), the database
containing AP30/30A Plans, Lists, Article 4 and
Article 2A assignments.
3
Examination of Part A submissions (2)AP30
Technical Examinations
4
Examination of Part A submissions (3)AP30
Technical Examinations
5
Examination of Part A submissions (4)AP30
Technical Examinations
6
Examination of Part A submissions (5)AP30
Technical Examinations
7
Examination of Part A submissions (6)AP30A
Technical Examinations
8
Examination of Part A submissions (7)AP30
Technical Examinations
9
Examination of Part A submissions (8)Exercise on
the sample SPS_ALL database
a) Extract the SPS_ALL_IFIC9999.mdb sample
database from the following zip file
D\Data\SpacePlans\SPS\SPS_ALL_IFIC9999.zip to
the folder C\Br_soft\SPS\   In this sample
database, in addition to some Plan/List and
Article 4 assignments, the following three
Article 4 networks that are ficticiously
published in BR IFIC 9999 are included  
97552999 / R13DN-LINK A sample Regions 1 and 3
Article 4 downlink network 97554999 /
R13FD-LINK A sample Regions 1 and 3 Article 4
feeder-link network 102555999 / R2-NETWORK A
sample Region 2 Article 4 network   b) Extract
the three MSPACE results database from the
following zip file D\Data\SpacePlans\MSPACEg_re
sults\MSPACEg_results_IFIC9999.zip to the folder
C\Br_soft\SPS   c) Run SPS_REPORTs, select
AP30_R13DN-LINK_mspace_results.mdb, press
Compressed report, select the option PFD and
EPM, press Create Draft of Special Section,
rename the created file SS_AP_30C.rtf at
C\Br_soft\SPS to R13DN-LINK_PartA.rtf   d) Run
SPS_REPORTs, open SPS_ALL_IFIC9999.mdb, select
downlink Plan, select 97552999/R13DN-LINK network
and prepare the data report or the Special
Section. A document named as Temp.rtf will be
opened in MS Word   e) Compare the list of
affected networks under 4.1.1 a) b) in
Temp.rtf with the list of affected assignments in
R13DN-LINK_PartA.rtf. Note the differences f)
Repeat steps a) to e) above for 97554999 /
R13FD-LINK and 102555999 / R2-NETWORK.
10
Examination of Part B submissions under
4.1.12/4.2.16 of Article 4 of Appendices 30 and
30A (1)Technical Examinations
According to 4.1.11/4.2.15 of Article 4 of
Appendices 30 and 30A, in requesting the
publication of a Part B Special Section,
administrations may modify certain parameters of
a network previously published in a Part A
Special Section in order to overcome unresolved
disagreements. This requires that a new series of
technical examinations be carried out by the
Bureau in order to investigate whether or not an
objecting administrations networks/territories
are still identified as affected by the modified
parameters. Moreover, checks are made to
ascertain that no additional interference is
imposed on an administration that has not
objected or has previously agreed after an
objection. The technical examinations required
for the Part B submission is same as for Part A
as listed the previous slides. However, the
results of the examinations are compared with
those of the relevant Part A examinations.
Accordingly, for examination under 4.1.1a) b)
/ 4.2.3c) of Appendix 30 and 4.1.1a) b) /
4.2.2c) of Appendix 30A, the SPS_ALL database
included in the BR IFIC of the networks Part A
publication is used.
11
Examination of Part B submissions
(2)Coordination requirement examination
  • An indication of the agreements required or not
    based on different configurations of a
    network/Plan beam/Country identified as affected
    in the Part A / Part B technical examination are
    listed the following slide. In order to establish
    coordination requirements for an affected
    network/Plan beam/Country identified in the
    technical examination results, the following
    scenarios are taken into account
  • whether the same network/Plan beam/Country was
    identified as affected in the relevant Part A
    Special Section
  • whether the administration whose network/Plan
    beam/Country is identified as affected has
    objected to the corresponding Part A Special
    Section
  • - whether the level of the interference resulting
    from the Part B network characteristics is more
    than that resulting from the relevant Part A
    network characteristics.
  •  
  • A separate coordination requirement is
    established for each affected administration
    under each paragraph of 4.1.1 / 4.2.3 of
    Appendix 30 and 4.1.1 / 4.2.2 of Appendix 30A.

12
Examination of Part B submissions
(3)Coordination requirement examination
 
 
 
 
  NO X YES NA Not Applicable Objecting
administration An administration identified as
affected who has communicated an objection within
the regulatory time limit and has not
subsequently has given its agreed.
13
Examination of Part B submissions (4) Exercise
on the sample SPS_ALL database - MSPACE
a) Export the R13DN-LINK network from
SPS_ALL_IFIC9999.mdb to a new database to the
C\Br_soft\SPS\R13DN-LINK_PartB.mdb database with
the options Keep Findings and Ref. Situations
unchecked and Keep group Ids of the source
checked b) Open the above created database in
SpaceCap and delete beams 5 and 6 and odd
channels of beam 3 (group id 384) c) Export back
the R13DN-LINK network with the modified
characteristics from the   C\Br_soft\SPS\R13DN-LI
NK_PartB.mdb database into the SPS_ALL_IFIC9999.md
b database with the options Replace Notice in
Target and Keep group Ids of the source
checked d) Rename the SPS_ALL_IFIC9999.mdb
database as SPS_ALL_R13DN-LINK_PartB.mdb e)
Copy the GIMS database  D\Exercise\SPS_GIMS_Sampl
e.mdb to C\Br_soft\Data f) Run MSPACE on
SPS_ALL_R13DN-LINK_PartB.mdb selecting downlink
Plan/List and include the above mentioned GIMS
database. Once the program finishes, select the
Compressed report tab, select the option PFD
and EPM, press Create Draft of Special
Section, to create the report file
SS_AP_30C.rtf g) Compare the above-mentioned
report with R13DN-LINK_PartA.rtf created on the
Part A slide 8.

14
Examination of Part B submissions (5) Exercise
on the sample SPS_ALL database GIBC(PFD/PXT)
a) Move the SPS_ALL_R13DN-LINK_PartB.mdb
database to C\Br_soft\Data b) Copy the extract
files bss_sstn.dat and the SRS_ALL_Sample.mdb
database from D\Exercise to C\Br_soft\Data. The
extract file that contains the assignments in the
downlink Plans and List is used by the GIBC-PFD
program c) Run GIBC and select
SPS_ALL_R13DN-LINK_PartB.mdb, SRS_ALL_Sample.mdb
and SPS_GIMS_Sample.mdb on the Tools Options
tab d) Enter the notice id of the R13DN-LINK
network (97552999) on the PFD tab with the option
Triggers selected and run the program. The
results are at the following location
C\PFDRESULTS\uuuuuu\097552999\tttttt where
uuuuuu and tttttt correspond to the user name and
time of the PFD run session e) Enter the notice
id of the R13DN-LINK network (97552999) on the
PXT tab with options Output Level 1 and
Finding Level Group selected and run the
program. The results are at the following
location C\PXTRESULTS\uuuuuu\097552999\tttttt
where uuuuuu and tttttt correspond to the user
name and time of the PFD run session f) Compare
the new results with those of the Part A
examination at the following location
D\Exercise.