Renton Fire Dept. - PowerPoint PPT Presentation

1 / 39
About This Presentation
Title:

Renton Fire Dept.

Description:

Title: PowerPoint Presentation Author: Wendy Curtis Last modified by: user10064 Created Date: 12/18/2001 7:46:56 PM Document presentation format: On-screen Show – PowerPoint PPT presentation

Number of Views:65
Avg rating:3.0/5.0
Slides: 40
Provided by: WendyC67
Category:

less

Transcript and Presenter's Notes

Title: Renton Fire Dept.


1
Renton Fire Dept.
2
Compressed Air Fill Station Operation
  • By
  • Tom Curtis

3
Objectives
  • Demonstrate external visual inspection
  • Identify safe filling techniques
  • Identify safe transportation guidelines

4
  • SCUBA cylinder rupture
  • Riviera beach Florida
  • February 1, 1998

5
(No Transcript)
6
(No Transcript)
7
SCBA Cylinder RuptureAllegan Fire
DepartmentSeptember 4, 1997
8
(No Transcript)
9
Cylinder Inspection
  • Cylinder type

10
Composite Cylinder
  • Aluminum liner that is rapped by carbon fiber or
    fiberglass.
  • 4500 or 2216 psi.

11
Solid Wall Cylinder
  • Low pressure
  • 2216 psi

12
Cylinder Inspection
  • Cylinder type
  • Service pressure

13
Look Here for Service Pressure!
14
Oxygen Cylinder
  • Stamped information on the dome.
  • Includes service pressure, serial number,
    manufacture and permit number.

15
Low Pressure Cylinder Gauge.
16
High Pressure Cylinder Gauge
17
Cylinder Inspection
  • Cylinder type
  • Service pressure
  • Hydro test date

18
Stamped Hydro Test Date
  • Stamped on dome of solid wall cylinders

19
Cylinder Inspection
  • Cylinder type
  • Service pressure
  • Hydro test date
  • Manufacturer

20
SCI Cylinder
  • Three year hydro

21
(No Transcript)
22
Luxfer Cylinder
  • Five year hydro

23
They May Look the Same!
  • Take the time to look for the manufacturer and
    hydro date.

24
Aluminum Cylinders
  • 5 year hydro

25
Cylinder Inspection
  • Cylinder type
  • Service pressure
  • Hydro test date
  • Manufacturer
  • Cuts and gouges

26
Cuts, Gouges and Scrapes.
  • .005 inches.
  • Sent to the shop for gel coat repair.

27
BreakJust 10 Min.Be Back At
28
Fill Station Operation
  • Safety rules
  • Hearing protection
  • Respect the whip
  • Keep area clean

29
SCBA Connection
  • Rated at 4500 psi

30
SCUBA Yoke
  • Most rated at 3000 psi

31
Low Pressure SCBA Adapter
  • Pop off regulator is set for 2216 psi.

32
Low Pressure SCBA Adapter
  • The adapter has the same 4500 psi rated
    connection as the high pressure whips.

33
Station 14 SCBA Fill Station
  • Open donor cylinder bank first.
  • Crack fill gauge to proper rate.

34
Oxygen Fill Station
  • Regulated fill rate of 300-600 psi/min.
  • Will have vacuum system installed.

35
300 to 600 psi Per Min
  • One unit on this gauge is 100 psi
  • It should take 10 to 20 seconds for each 100 psi
    unit
  • To fill a high pressure SCBA cylinder from 0 psi
    it will take _at_ 10 min.

36
Filling a Cylinder
  1. Cylinder inspection
  2. Cylinder connection
  3. Open cylinder valve
  4. Open lowest donor cylinder bank first
  5. Open the fill valve at 300 600 psi/min

37
Handle With Care.
  • Would you use an artillery shell as a wheel
    chock.
  • Kinetic energy stored in a full 80 cubic foot
    cylinder exceeds one million foot pounds.

38
Transportation of Cylinders
  • Regulations for commercial transporters
  • Practical application in the fire department
    would be
  • Vertical
  • Protected contact with other cylinders

39
The End
Write a Comment
User Comments (0)
About PowerShow.com