EMAP: Chamber Project - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

EMAP: Chamber Project

Description:

EMAP: Chamber Project Industrial Engineering Section Presenters: Khalfani Hardwick, Megan Missildine, Jacob Brunk Lab Focus The focus of this lab was to introduce ... – PowerPoint PPT presentation

Number of Views:30
Avg rating:3.0/5.0
Slides: 12
Provided by: kh8432
Learn more at: https://map.ua.edu
Category:
Tags: emap | chamber | project

less

Transcript and Presenter's Notes

Title: EMAP: Chamber Project


1
EMAP Chamber Project
  • Industrial Engineering Section
  • Presenters
  • Khalfani Hardwick, Megan Missildine, Jacob Brunk

2
Lab Focus
  • The focus of this lab was to introduce
    engineering economic design principles to
    incoming UA freshman engineering students
  • The principles were applied to the evaluation of
    the feasibility of a theme park at Lake Nichol

3
Experimental Procedure
  1. Problem recognition, formulation, and evaluation
  2. Development of the feasible alternatives
  3. Development of the outcomes and cash flows for
    each alternative
  4. Selection of criterion or criteria for evaluation
  5. Analysis and comparison of alternatives
  6. Selection of the preferred alternative

4
Problem
  • Interested in building a water park in the
    vicinity of Lake Nichol
  • Assumptions
  • roughly 10 acres, water park, roller coaster
  • Open Memorial Day to Labor Day
  • Similarly sized parks did not have roller
    coasters

5
Problem contd
  • Costs (based on assumptions)
  • 5 million to construct
  • 400K to operate and maintain
  • 500K revenue
  • 20 year study period
  • 7 interest rate
  • Evaluated using Present Worth Method

6
Alternatives/Criteria for Success
  • Alternatives
  • Construct park
  • Save money for future projects
  • Criteria for Success
  • Present Worth 0
  • Other Factors Location, Park Structure

7
Outcomes
  • Park
  • Present worth -3,940,598.58
  • Park is not economically feasible

8
Outcomes Other Factors
  • Comparably sized parks did not have roller
    coasters
  • Could result in increased attendance
  • Park is not open while population is at its peak
  • Park is not easily accessible from highways
  • Low visibility

9
Suggestions
  • Move park closer to the city
  • Tie into another project
  • Include in plans for renovation of Downtown
    Tuscaloosa
  • Eliminate water park concept
  • Utilize traveling carnivals

10
Lessons Learned
  • Location is critical for new business
  • Money management
  • Networking w/ other groups
  • Present worth

11
Questions
Write a Comment
User Comments (0)
About PowerShow.com