Title: WORKPLACE HAZARD MANAGEMENT
1WORKPLACE HAZARD MANAGEMENT
2KEY ELEMENTS
- IDENTIFY
- PLAN AND DOCUMENT
- COMMUNICATE
- MANAGE
- MONITOR
3KEY ELEMENTS
- Identify HSSE Critical Work Activities
- Plan and Document Activities
- Communicate Work Requirements/Practices
- Management of the Work System
- Monitor Performance
4SCOPE (Work Parameters)
- The Construction Work Plan
- Installation HSSE Management Plan
- Work Packages
- Job Tasks Work Process
5OBJECTIVES
- Early Identification of Hazards
- Assessment of Risk
- Job Safety Assessment
- Prevention Control of Work Hazards
- Total Hazards Management
6HSSE TOOLS
- Hazard Analysis (HAZOP HAZID)
- Task Risk Assessment
- Job Safety Analysis
- Permit To Work System
- Safety Meeting Toolbox Talks
7WORKPLACE HSSE MGMT PROCESS
ASSET HSSE INITIATIVES
CONTRACTOR LEAD ASPECTS
WORKPLACE HSSE MGMT
8HAZARD ANALYSIS
- Hazard Analysis Reviews
- Detailed safety reviews of design by HAZOP
- Hands on review of Work Plan by HAZID
- Constructability review of major activities
- Work Plan Hazard Identification (HAZID)
- Review at each work element (Work Packages)
- Review major activities versus resources
- Identification of hazard control or mitigation
- Review of need further assessments
9ENVIRONMENTAL IMPACT HAZID
- EMS ISO 14001 Compliance
- Review of Environmental Aspects
- Waste Management Plan
- Environmental Compliance Register
- Construction Waste Management
- HAZID review of all opened Process Systems
- Constr. Waste Classification Records
- Waste Accumulation Disposal
10TASK RISK ASSESSMENT
- Define the Task
- Identify the Hazards
- Assess Consequence
- Assess Likelihood
- Determine Control Mitigation
- Determine the Residual Risk
- All tasks subject to JSA, PTW, Toolbox / Low
Risk may be exempt from PTW.
11JOB SAFETY ANALYSIS
- Contractor Safety Management Program
- Review of each Task Scope of Work
- Site specific review of job steps
- Uncover hazards previously overlooked
- Eliminate or Reduce Hazards
- Operating Procedures (SOP)
- Operating Guidelines (Industry Experience)
- Safe Work Practices (Good Practice)
12PERMIT TO WORK SYSTEM
- PTW System (HSE-PRO-016) Requirements
- DD installation work subject to PTW System
- PTW issued only by authorized personnel
- Provides for control of hazardous work activities
- OPS to hold daily meetings to plan PTW issues
- PTW System SCOPE
- Hot Work/Radiography (RED)
- Specialist Work (GREEN)
- Confined Space (YELLOW)
13SAFETY MEETING TOOLBOX TALKS
- Daily Safety Meetings
- Review of current completed activities
- Discussion of upcoming activities
- Review TRA Risk Factors
- Plan of next days PTW issues
- Management of Change
- ToolBox Talks
- Review JSA for task at hand
- Safety checklist of safety support elements
- Ensure awareness of duties and responsibilities
14WORKPLACE HSSE MGMT REVIEW
ASSET HSSE INITIATIVES
CONTRACTOR LEAD ASPECTS
HAZID review of Contractors Work Plan
Review of JSA, safety checklist and assignments
for task at hand.
Environmental review of Contractors Work Plan
Contractor review of TRA and PTW to plan next day.
WORKPLACE HSSE MGMT
Operations review of each Work Package Job Step
Risk review of Contractors Work Plan Job Tasks
Safety review of each Work Package Job Step