2Introduction
- The UK and China are both confronted with an
increasing rate of construction(????) and a
decreasing capacity of landfill (????)at present,
which calls for construction waste minimisation
urgently. - Considerable differences have been found in the
effort on waste minimisation (?????)as well as on
construction waste minimisation design
(?????????)between the UK and China. - A comparative study was made based on the
existing survey in the UK. The survey in China
includes - Acquaintance of the legislations (????????)
- Implementation of construction waste minimisation
design (???????????) - Causes of construction waste (????????)
- Barriers incentives for construction waste
minimisation design (?????????????????) - Architects attitudes to construction waste
(???????????)
Source http//photos.nphoto.net/photos/2007-09/06
/ff80808114c5908e0114d6acb3cd5432.shtml
3Introduction
UK China
Construction waste (????) 120 million t of construction, demolition and excavation waste is produced by construction industry per annum. More than 25 million t of construction waste is disposed by landfill in the UK every year. By 2020, China will increase 30 billion m2 of construction area, so the amount of potential construction waste will be an amazing number (1500-1800 million t).
Need for reclaimed and recycled materials (????????????) Minimisation of wastes during aggregates production Careful use of aggregates in the process of construction, Appropriate use of aggregates Increased substitution of secondary and recycled materials for primary aggregates. Green Construction Guideline (2007) (??????)encourages the development of new technology, new equipment and new materials in green construction, including the application technology of reclamation of the construction waste in envelop materials.
Information sources for construction waste minimisation design (??????????????) Legislations on waste disposal Handbooks on construction waste minimization Website, competition, training course for waste minimization design Legislations on waste disposal Information of material recycling little information supports online
Models for construction waste evaluation (????????) BREEAM, SPeAR, LCA In 2007, Green Building Assessment (??????) the first book in China systematically is published introducing the U.S. LEED, U.K. BREEAM, Japan CASBEE, GreenCalc, Taiwan Green Building, Australian NABERS.
Role of construction waste minimisation design (????????????) Design for Reuse and Recovery Design for Off Site Construction Design for Materials Optimisation Design for Waste Efficient Procurement and Design for Deconstruction and Flexibility. when it comes to construction waste minimisation, waste management and technology supports seem to be emphasized most frequently. The views on designing out waste are limited.
4Method
- Respondents
- The architects in Grade A Architecture Design
Institutes in provincial capitals (??????????) - The ranking of these institutions in China is
mainly based on the registered capital, the scale
of projects and - the number of registered architects.
- Questions
- The questionnaire totally includes 20 questions,
with seven same questions as those of the survey
in the UK. - Single-choice questions, multiple-choice
questions, rating scales and open questions in
the questionnaire. - Questionnaire distribution and return
- The use of questionnaire web page
- The address of the web page was sent to 80
architects, with the response rate of 76. - Data Analysis
- Statistical Package for Social Science (SPSS)
- Approaches of analyzing
- One Sampling t-Test (comparing means)
- Independent samples t- Test (compare variables
- between two group)
- Tabulated open-ended questions (collect and
- analyze individual suggestions)
5Method
- Working age
- (????)
- Education level
- (????)
- Workload
- (???)
6Questionnaire Sample
7RESULTS Chinese architects
Background Information
- Acquaintance with relevant legislations
(??????????) - The respondents do not know the legislations.
- lt PRC Law of Solid Waste Pollution
Prevention and Control gt ??????????????????
34.4 - lt Law of Urban Solid Waste Disposal
gt????????? 37.7 - ltGreen Construction Guidelinegt??????
39 - ltUrban Construction Waste Management
Regulationsgt?????????? 37.7 - Acquaintances of the concept of construction
waste minimisation design (?????????????????) - Over 60 of respondents reported that
they never heard the concept of construction
waste minimisation by design, therefore, most of
them have not had a clear and scientific idea on
what is construction waste minimisation by
design. - Courses and projects relevant to construction
waste minimisation design in college
(???????????????????) - More than 85 said that they never
attended any courses on designing out waste.
Meanwhile, nearly 80 acknowledged that they
never did the projects which were concerned with
construction waste minimisation design in college.
8Green Housing Rating Systems
RESULTS Chinese architects
The usage of Green Housing Rating Systems
(????????) can reflect the Chinese architects
concern with sustainable design and construction
waste minimisation.
Employ Green Housing Rating Systems in projects
Never over 60 A little
nearly 20 Often
6.6.
9Importance of construction waste minimisation
design
RESULTS Chinese architects
Most of the Chinese architects acknowledge the
importance of designing out waste.
- Very important
over 35 - Extremely important about
22 - Not important at all
0
10Views on the importance of construction waste
minimisation design
RESULTS Chinese architects
???????????,???????????????????,????????????,????
???,????????????????
- extremely important and very important
- (1) Beneficial to saving sources (??)and energy
(??) - (2) Reducing waste (??)and pollution (??)and
protecting environment. - (3) Considered as a challenge (??)as well as a
responsibility (??) - (4) The problem of waste would be more serious in
the foreseeable future - moderately important
- (1) The current economic and management level
(???????)could not support it. - (2) No requirement from clients (??)and
legislation(??), - (3) Little knowledge (??)of it
- (4) A lack of design time (????).
- slightly important
- (1) Mainly produced during the process of
construction(????), and not related to design
strategies(????) - (2) Inevitable due to big design changes
- (3) Considered as a stunt (??)
- (4) Complicated and difficult to put into
practice, while less benefit - (5)The public have not pay attention to it.
(?????) -
????????,???????,????????????,????????,?????,????
??????
???,????????,???????????,?????
11Information sources for waste minimisation
RESULTS comparison between the UK and China
what is the problem?
UK (Source Osmani Glass, 2007)
China
- More than 50 of information of waste
minimisation came from media and articles
(??/??), but the information support from
training courses (????) and professional bodies
was very limited, each occupying 3.3. - The architects in the UK had more information
channels, including professional bodies (????),
personal research (????). - The fact that the information sources are
relatively inadequate (???)can reflect the
current situation that the consciousness of the
importance of information for designing out
waste(?????????????) is still not enough in the
whole society of China.
12Waste minimisation design barriers
RESULTS comparison between the UK and China
what is the problem?
(b) China
(a) UK (Source Osmani Glass, 2007)
Barriers (China) Responses Responses
Barriers (China) Mean rating Ranking
Lack of interest from clients 4.12 1
Poorly defined individual responsibilities 3.76 2
Lack of training 3.75 3
Waste accepted as inevitable 3.59 4
1. Not a barrier 2. Insignificant barrier 3. Minor barrier 4. Significant barrier 5. Major barrier. 1. Not a barrier 2. Insignificant barrier 3. Minor barrier 4. Significant barrier 5. Major barrier. 1. Not a barrier 2. Insignificant barrier 3. Minor barrier 4. Significant barrier 5. Major barrier.
Barriers (UK) Responses Responses
Barriers (UK) Mean rating Ranking
Lack of interest from clients 3.88 1
Waste accepted as inevitable 3.83 2
Poorly defined individual responsibilities 3.80 3
Lack of training 3.70 4
- Lack of interest from clients (??????)is also
the top significant waste minimisation barrier in
China, followed by poorly defined individual
responsibility (????????)and lack of
training(????).
Nearly 70 said that clients never called for
waste minimisation design, while only 3.3
declared clients often asked for it.
13Causes of construction waste
RESULTS comparison between the UK and China
what is the problem?
Design stages
Last minute change due to the clients
requirement (????????????) 4.15 Design changes
(????) 3.93 Detailing errors
(????) 3.66 The difference
between these mean ratings of the listed causes
is slight. The mean ratings are relatively high.
Site operations
Off-cut from cutting materials (??????????)
4.31 Unused materials and products (?????????)
4.28 waste from application processes
(??????????) 4.10 The mean ratings of
each cause of waste during site operations are
relatively higher than that during design stages,
the same as the results from the architects in
the UK.
14Waste minimisation design incentives
RESULTS comparison between the UK and China
what can we do?
China
UK (Source Osmani Glass, 2007)
Incentives (China) Responses Responses
Incentives (China) Mean rating Ranking
Legislation 4.40 1
Financial rewards 4.30 2
Waste management policy in place 3.74 3
Training 3.35 4
1. Not an incentive 2. Insignificant incentive 3. Minor incentive 4. Significant incentive 5. Major incentive. 1. Not an incentive 2. Insignificant incentive 3. Minor incentive 4. Significant incentive 5. Major incentive. 1. Not an incentive 2. Insignificant incentive 3. Minor incentive 4. Significant incentive 5. Major incentive.
Incentives (UK) Responses Responses
Incentives (UK) Mean rating Ranking
Legislation 4.55 1
Financial rewards 4.55 1
Waste management policy in place 3.93 2
Training 3.90 3
- Chinese architects also believed legislation
(????) was the key waste minimisation incentive,
followed by financial rewards, while training
(??) was the least significant measure. - An allowance (??) for recycled construction
products (??????), - Tax credit (?????) for the construction
companies use recycled products (??????), - a higher tax (????) on the construction
companies use original products (??????) to
encourage reducing(??), reusing (???) and
recycling (????) of waste materials. -
-
15Waste minimisation design strategies
RESULTS comparison between the UK and Chinawhat
can we do?
China
Waste minimisation design strategies (China) Architects responses Architects responses Architects responses Architects responses Architects responses Architects responses Architects responses
Waste minimisation design strategies (China) Percentage Percentage Percentage Percentage Percentage Mean rating Ranking
Waste minimisation design strategies (China) 1 2 3 4 5
Feasibility study of waste estimation 50.8 27.9 11.5 9.8 0 1.80 8
Designing for deconstruction 36.1 27.9 27.9 8.2 0 2.08 7
Use of standard dimensions and units 14.8 13.1 36.1 26.2 9.8 3.03 1
Use of prefabricated units 16.4 19.7 39.3 19.7 4.9 2.77 4
Specifying reclaimed/recycled materials 16.4 42.6 26.2 11.5 3.3 2.43 5
Use of standard materials to avoid Cutting 14.8 16.4 39.3 21.3 8.2 2.92 2
Avoidance of late variations in design 19.7 19.7 31.2 23.0 6.6 2.78 3
Guidance for hazardous waste Management 32.8 32.8 18.0 11.5 4.9 2.23 6
1. Never been used 2. Rarely used 3. Used in some projects 4. Used in most projects 5. Used in all project. 1. Never been used 2. Rarely used 3. Used in some projects 4. Used in most projects 5. Used in all project. 1. Never been used 2. Rarely used 3. Used in some projects 4. Used in most projects 5. Used in all project. 1. Never been used 2. Rarely used 3. Used in some projects 4. Used in most projects 5. Used in all project. 1. Never been used 2. Rarely used 3. Used in some projects 4. Used in most projects 5. Used in all project. 1. Never been used 2. Rarely used 3. Used in some projects 4. Used in most projects 5. Used in all project. 1. Never been used 2. Rarely used 3. Used in some projects 4. Used in most projects 5. Used in all project. 1. Never been used 2. Rarely used 3. Used in some projects 4. Used in most projects 5. Used in all project.
- Generally the waste minimisation design
strategies are not very often used in projects in
China. The difference between two countries are
not significant. - F D (?????????)(?????)strategies are
the least popular in projects in China, which is
the same as in the UK. -
16Waste minimisation design
RESULTS comparison between the UK and Chinawhat
can we do?
Implementation of construction waste minimisation
design
- Old building
reconstruction (?????)is the most usual in
practical projects, and it is considered as the
most effective construction cost-saving method. -
- The use of recycled materials(??????) is
rarely put in practice, - but it is considered as the second effective
method.
design types(China) Responses Responses
design types(China) Mean rating Ranking
Old building reconstruction 2.50 1
Flexible design 2.10 2
Reclamation of construction materials 2.07 3
Use of recycled materials (e.g. recycled concrete recycled bricks) 2.02 4
1. Never been used 2.Rarely used 3.Used in some projects 4.Used in most projects 5.Used in all projects . 1. Never been used 2.Rarely used 3.Used in some projects 4.Used in most projects 5.Used in all projects . 1. Never been used 2.Rarely used 3.Used in some projects 4.Used in most projects 5.Used in all projects .
Cost-saving of construction waste minimisation
design
Design types(China) Responses Responses
Design types(China) Mean rating Ranking
Old building reconstruction 3.37 1
Use of recycled materials (e.g. recycled concrete recycled bricks) 3.29 2
Flexible design 3.20 3
Reclamation of construction materials 2.67 4
1. Not at all 2.Slightly 3.Moderately 4.Very 5.Extremely. 1. Not at all 2.Slightly 3.Moderately 4.Very 5.Extremely. 1. Not at all 2.Slightly 3.Moderately 4.Very 5.Extremely.
17Waste minimisation management means
RESULTS comparison between the UK and Chinawhat
can we do?
- In China, more than 60 of respondents
acknowledged that they never did anything in
waste minimisation management means. The
respondents who never did anything for these
responsibilities in China were twice (??)that in
the UK. - The architects in the UK have more means in
construction waste minimisation.
18Conclusion
- ??????????????????
- ?????????,????????????????
- ???,???,????????,???????????????????
- ????????????????????????
- ????????????,?????????,?????????????