Title: MICE Absorber Test Cryostat
1MICE Absorber and Test Cryostat
MICE Meeting at CERN March-29, 2004
Shigeru Ishimoto (KEK) Shoji Suzuki (KEK) Edgar
Black (IIT) Mary Anne Cummings (NIU)
Photo KEK March-28, 2002
(1) MICE Absorber Present Status (2) MICE
Absorber Test Process and Test Cryostat (3) LH2
Level Sensor and Thermometers
2MICE Absorber Present Status
3MICE Absorber
4MICE Absorber
5MICE Absorber
6Stay Off Lines
L-H2 Level Sensors
New
H2 Monitor Flanges
7MICE Absorber
March-24, 2004
8MICE Absorber Test Flange
March-24, 2004
9MICE Absorber Test Process and Test Cryostat
10MICE Absorber Test Process
3-5 Bodies by (KEK) 6-10 Windows by
(USA)
20K Gas-He Test at (KEK)
Test check absorbers assemble in MICE at RAL
L-H2 Test at MTA with a Spare Body and Windows
11Detail Test Process
- KEK
- (1) Pressure Test at room temperature with Dummy
Windows - (2) Pressure Test with Dummy Windows 20 K
gas-He
(3) At US/FNAL Pressure Test at room temperature
(4) Pressure Test at rum temperature with
Windows (5) Pressure Test W/gas He at 20K
temperature with Windows At KEK (or FNAL)
RAL (6) Pressure Test at room temperature (7)
Cooling Test W/gas-He (8) Cooling Test W/L-H2
(2)(5) Needs Test Cryostat (A) Test Cryostat
at MTA ? L-H2 Test (B)
New Horizontal Test Cryostat
? Cold gas-He Test
12MICE Absorber Test Cryostat (Plan)
13MICE Absorber Test Cryostat (Plan)
14MICE Absorber Test Cryostat (Plan)
15LH2 Level Sensor and Thermometers
16LH2 Level Sensor and Thermometers
CX-1050SD
17LH2 Level Sensor
Needs LH2 Level Monitor - Cooling Experiment
- Operation Requirement - Safety Requirement
No Space for Capacitance Level Sensor (AMI)
D 1/2, L gt 5
Resistance Thermometer
T TB dT, R RB dR
Level Monitor by Resistance Thermometer with high
current I 10 x INORMAL
Liquid Level
T TB , R RB
18Calibration of LH2 Level Sensor
x5
Down parts are for the Solid H2 Target
19Wiring and Connecters
Thermometers and Level Sensor in LH2
32 pin Connecter on KF40
Thermometers in Vacuum
32 pin Connecter (1 of 2) on KF40
20 Wiring and Connecters ( I )
Thermometers and Level Sensor in LH2
LH2
21Wiring and Connecters ( II )
vacuum (CX-1050SD except LH2 TOP)
Thermometers in Vacuum
22- Summary
- MICE absorber(No.1) will arrive soon.
- Horizontal test cryostat will be designed and
fabricated at KEK. - (3) MICE absorbers will be tested at KEK W/ cold
gas-He at 10-20K. - (4) MICE absorbers will be shipped to RAL with
sensors and real windows (ready to use). ?
PROPOSE - (5) L-H2 test at FNAL/MTA with a spear MICE
absorber. - ? PROPOSE
- (6) Thermometers/LH2 level sensors and
wiring/connecters are existing.
23Wiring and Connecters
Thermometers and Level Sensor in LH2
LH2
Thermometers in Vacuum