From UCAC to URAT - PowerPoint PPT Presentation

About This Presentation
Title:

From UCAC to URAT

Description:

From UCAC to URAT Norbert Zacharias U.S. Naval Observatory Astrometry Department Cataloging Division nz_at_usno.navy.mil – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 39
Provided by: astroYale6
Category:
Tags: ucac | urat | about | robotic | work | world

less

Transcript and Presenter's Notes

Title: From UCAC to URAT


1
From UCAC to URAT
  • Norbert Zacharias
  • U.S. Naval Observatory
  • Astrometry Department
  • Cataloging Division
  • nz_at_usno.navy.mil

2
acknowledgement
  • UCAC (CCD setup, survey)
  • T.Rafferty, M. Germain, J.Pohlman, ...
  • all observers site support (O.Saa, D.Castillo
    ... T.Tilleman)
  • M.Zacharias, C.Finch, G.Wycoff, ....
  • UCAC (proper motions)
  • S.Urban, W. van Altena, T.Girard, A.Klemola,
    D.Monet, ...
  • U-mouse (detector)
  • STA (R.Bredthauer, ...), G.Luppino ...
  • U-mouse (astrograph)
  • USNO instrument shop (G.Wieder, ...)
  • USNO management (R.Gaume, K.Johnston ...)

3
U S N OC C DA s t r o g r a p hC a t a l o
g
  • red lens astrograph 4k CCD
  • combined with
  • early epoch photographic data

4
UCAC observing
  • 1997 2004 (all-sky completed)
  • 579 642 nm bandpass
  • R 8 to 16 mag
  • positions accurate to 20 mas (10 14 mag)
  • incl. proper motions (various early catalogs)
  • thanks Bill ! SPM major contributor
  • most accurate astrometry for fainter than Hip.

5
modify dome at CTIO
6
observing at CTIO
7
backend of astrograph
x-y slide
4k camera
8
UCAC products
  • UCAC1 (2000) part of Southern Hemisphere
  • UCAC2 (2003) -90 to 50 deg decl.
  • UCAC3 (2009)
  • all-sky coverage re-processing all pixel data
  • much improved completeness (bright stars,
    doubles)
  • improved astrometry (empirical profile fits,
    global iterations)
  • improved proper motions bright new data AGK2
  • improved proper motions faint re-reduct. NPM,
    SPM
  • improved photometry (1 band)

9
re-processing pixel data
  • 4.5 TB compressed
  • dark, flat handling
  • double star fits
  • empirical profiles
  • identify overexposed
  • multi-level results, flags
  • keep fit crash

10
(No Transcript)
11
(No Transcript)
12
StarScan plate measuring
  • early epoch data for proper motions, bright stars
  • CCD camera, step-stare mode
  • accurate to lt 0.5 micrometer absolute
  • Zacharias et al. 2008, PASP
  • 1930 AGK2 1,900 plates
  • 1976..1995 ZA 2,300 plates
  • 1983..1990 BB 900 plates

13

StarScan plate measure machine Washington, DC
14
SPM astrograph in Argentina
15
(No Transcript)
16
KPNO 2.1 m

extragalactic reference frame link
17
(No Transcript)
18
UCAC3 public release status
  • reductions completed
  • pixel re-processing --gt x,y data, various models
  • plate adjustment, systematic errors (model,
    FDP, CTE)
  • StarScan data up to RA, Dec SPM final model
    decisions
  • levels of products, options for release
  • mean position catalog (80 million stars, all sky)
    include only if gt 2 detections PM available
  • extract and identify minor planets -gt separate
    catalog
  • identify double stars -gt flags in main catalog
  • individual epoch RA, Dec of all detections
  • pixel data images (very noisy, dark current ...)

19
U S N OR o b o t i cA s t r o m e t r i cT
e l e s c o p e
  • 4-shooter camera
  • plus
  • new 0.85m telescope

20
URAT overview
  • USNO Robotic Astrometric Telescope
  • 0.85 m aperture, focal length 3.6 m
  • 4.5 degree diameter field of view
  • large format detector (world largest CCD)
  • 2 px / FWHM at 1.0 arcsec seeing
  • 9 micrometer pixel size
  • 4 CCDs, each 95 mm on a side
  • 60 s / 240 s integration
  • 13 to 21 mag
  • goal 5 mas for 'well exposed stars'

21
URAT optical design
22
URAT cut side view

EOST, 2005
23
URAT FASA2 (EOST 2005)
24
0.9 m primary mirror delivered, Feb.08
25
status of URAT project
  • telescope
  • optical design studies completed
  • primary mirror delivered Feb. 2008
  • no funding to complete new telescope
  • detector
  • 10.5k by 10.5k CCD chip produced successfully
  • thinning of 2 science grade chips May/July 2007
  • 10k camera complete, 1st light October 2007
  • 4-shooter camera funded, delivery March 2009

26
U-mouse(if you can't get the rat,how about
a mouse?)
27
(No Transcript)
28
10k camera dewar
29
astrographwith 10k camera
30
URAT phase 1 U-mouse
  • currently no funding for new telescope
  • take 4-shooter camera, put at astrograph
  • complete re-make of astrograph 2007/08
  • move to CTIO or NOFS, begin new survey 2009
  • 28 sq. deg. per exposure!
  • 11 mas per image coord. (well exposed star)
  • multiple sky overlaps per year, 7 - 18 mag
  • clocked anti-blooming seems to work!
  • solve for positions, motions parallax

31
STA1600B 4-shooter camera head concept front
view
  • Cryostat window 350mm diameter, 300mm clear
    aperture.

32
4-shooter camera dewar assemblyG.Luppino
33
U-mouse project numbers
  • sky area per hemisphere 25,000 sq.deg
  • field size per exposure 25 sq.deg
  • number of fields 1000
  • 2 exposures / field / epoch 60, 240 sec
  • time for 1 field (exp.pair) 6 min
  • time for 1-fold sky overlap 100 hour
  • avail. observ. time / year 2,200 hour (CTIO)
  • ...dark time, good seeing 1,500 hour (CTIO)
  • numb. sky overlaps in 2 years 30 at CTIO
  • numb. sky overlaps in 2 years 15 at NOFS
  • single measure precision 11 mas(cent.atm)
  • ...for well exposed stars R 11..15 40 mas R17
  • end of operation random error 2 mas at CTIO
  • end of operation random error 3 mas at NOFS
  • systematic errors lt 10 mas --gt ???

34
  • rebuilding astrograph in 24in dome

35
astrograph new tube assembly
36
USNO instrument shop Sep 2008astrograph tube
assembly
37
fully funct. 10k chip image16outputsSTA2
008Sep 17
38
summary
  • UCAC3 all-sky to 16th mag, catalog in 2009
  • URAT -gt Umouse first light 2009
  • 111 million pixel CCD detector on sky tested in
    2007
  • use re-furbished astrograph for phase 1, 2008
  • get 4-shooter camera by March 2009
  • observe 2-3 years per site (NOFS, CTIO)
  • catalog of positions, proper motions, parallaxes
    2012 ?
Write a Comment
User Comments (0)
About PowerShow.com