Title: Detector Parallel Session
1 Detector Parallel Session
Video Conference Fri 13/6 830 Grichine EMCal
Simulation Update 0900 Bonesini TOF Update
Radicioni Rates at TOF0 0930 Gastaldi
TPG Status and Plans 1000 Sato KEK Test
Results/Plans 1030 Coffee 1050 Barber SciFi
Tracker Progress in Design, Prototype,
Plans 1110 Sedgbeer SciFi Tracker Software
Status/Plans 1130 Summers Tracker Choice
Ground Rules and Process 1200 Discussion
2Introduction .. and summary
- Progress towards upgrade of the downstream bug
- downstream PID taylored to 300 MeV/c m
(200 MeV Tkin ) - based on only existing old track
files, so never adapted to 200 MeV/c (121 MeV ) - needs some
serious rethink (by means of new track files
!!!) - 1000 muons throu G4MICE. a
MUST !!! .. volunteer needed !!!
2) Short update from TOF ( B field tests, TOF 0
max rates ) NB TOF0-TOF1 may
well be only 6 m apart (B. Palmer) 3) Major
progress on both trackers !!!!!!!!!!!!!!!!!!!!
congratulations to
both teams next CM .
end of October ..
OK
CORRAL .. 4) Rules of the shoot-out (Summers
Gregoire)
3- Progress towards upgrade of the downstream bug
first semirealistic study of end region (PID) at
lower (200 Mev/c)
limited, not G4MICE yet. Grichine
EMCal Simulation Update the belt
(m-tag)
see
slides the art of e/m separation gets
different thinner slicing? ..
fully active detector? Need a G4MICE serious
study . PLEASE VOLUNTEER! 1000 m !
a proper first goal (and boost) for our
simulation software and effectiveness in
detailed detector design including
downstream Cerenkov the suspenders
(e-tag)
may prove embarassing, otherwise
42) Short update from TOF
SciPMT tests in B field set up at INFN-Mi
(Bonesini) up to 1 Tesla
12 cm gap warm magnet
results soon
.. NB good to keep at least
TOF0 away at 200
MeV/c TOF0-TOF1 may well be only 6 m apart
TOF 0 max rates (Radicioni)
up to 5 MHZ tolerable to DAQ
lower
limit certainly from PMTs , answer needed
53) Major progress on TPG tracker !!!!!!!!!!!
congratulations to
the TPG team 0930 Gastaldi TPG Status and
Plans see Radicionis slides small GEM
chamber prototype operational in Naples with
final front electronics
being equipped with a 10 cm
field cage test learning chamber
.. may make it to LAB G
big hopes . tagged Co Mn X-ray sources
full size MICE end cap being built
GEM amplification with hexaboard
read-out with final
front end electronics
to be adapted to full HARP 1.5 m field cage
in the CERN PS East Hall
(painful resurrection)
cosmic rays first beam traccino mid
September real MICE prototype ..
own 1 m field cage ready in 2004
6- 3) Major progress on Sci-Fi tracker !!!!!!!!!!!
- congratulations
to the Sci-Fi team - 1000 Sato KEK Test Results/Plans
- lab tests reducing photon MFP
(.460 mm) x-talk - several new fibers
delivered for studies of MFP much more - 2 weeks of beam tests at
KEK later this month - 1050 Barber SciFi Tracker Progress in Design,
Prototype, Plans - prototypes of support of single
stage of 3 fiber planes - support of connectors
AND connectors (7 fold multiplexing built in !!!
) - final
carbon fibers structure in September - 1110 Sedgbeer SciFi Tracker Software
Status/Plans - SW simulation reconstruction -- most of
the functionality required is in place - Computing resources -- adequate resources
available - Manpower resources - losing Ed will be
replaced but test beam commitment - plus some extra manpower for SW
Grid - Aim to complete required SW studies by
October
7KEK Test Results / Plans
- Akira SATO
- Osaka University, Japan
8contents
- Cross talk of SCSF78
- Fiber optimization
- KEK plan
- Attenuation length
- Beam test
9Cross talk for SCSF78
From last KEK beam test results
- Experimental data can be explained assuming that
mean free path of primary photon is 460mm.
Expected of p.e. with 0mm MFP
1.0GeV/c p 1.0GeV/c proton
300mmf 1.92 p.e. 2.77 p.e.
500mmf 2.92 p.e. 4.21 p.e.
Experimental data
1.0GeV/c p 1.0GeV/c proton p/p ratio
300mmf 0.5 p.e. 0.8 p.e. 0.68
500mmf 1.2 p.e. 1.6 p.e. 0.75
dE/dx 1.8 MeV/cm 2.6 MeV/cm 0.7
Expected of p.e. with 460mm MFP
300mmf 0.55 p.e. 0.80 p.e.
500mmf 1.20 p.e. 1.72 p.e.
10Optimization of 3HF fiber
- Alan estimated the mean-free path (MFP) for
absorption by 3HF of the primary scintillation
light from the primary dopant p-terphenyl (pT). - The absorption can be expressed as
- I/Io 10-(????cd)
- ????? the molar extinction coeff. in (moles per
liter-cm)-1 at wavelength ? - c the concentration in moles per liter
- d the distance in cm
- Attenuation length for the primary dye emission
via 3HF absorption - 50mm for 1dye3HF(1500 ) D0 tracker
- 21mm for 1dye3HF(3500)
- Very short for 3HF(5000) w/o 1dye
- At high concentrations, 3HF acts like a primary
dopant ie, its coupling the the fundamental PS
excitation is quite strong.
11KEK and Osaka Plan
- Scintillating fibers had been deriverd to Osaka
Univ. June 3rd - Standard primary(pT) 3HF(2500ppm)
- Standard primary 3HF(3500ppm)
- Standard primary 3HF(5000ppm)
- 3HF(5000ppm) only
- 0.35mmf, round, multi-clad, s-type
- We are planing to study
- Attenuation length
- Aging of bending fiber
- Light yield (beam test)
- Cross talk (beam test)
12Attenuation length
- Measurement has just started.
- Cracks in fiber reduce light yield.
- Need some quality control
13KEK beam test
- June 25th - July 2nd
- _at_ KEK p2 beam line
- Photon detector
- Hamamatsu R7899 MOD
- Extended Green Photocathode
- 1 inch diameter
- 10 stage
- Head-on Type
- Prismatic Window
- Light yield
- Cross talk
PMT (R7899)
14summary
- The most suitable fiber for MICE scifi tracker
will be selected by KEK studies. - Candidates
- Standard primary(pT) 3HF(2500ppm)
- Standard primary 3HF(3500ppm)
- Standard primary 3HF(5000ppm)
- 3HF(5000ppm) only
- Attenuation length
- Aging
- Light yield
- Cross talk
- Beam test June 25th - July 2nd _at_ KEK-PS p2
15Plans for Sci-Fi Prototyping.
- Contents-
- Mechanical Layout of Sci-Fi
- Design of the Fibre Optic Connectors
- Design Issues Still to be Addressed
- Future Plans
- This work is being undertaken by Imperial College
and Liverpool University physics Department
(Peter Cooke), Fermilab (Alan Bross), KEK (Koji
Yoshimura), Osaka (Yoshi Kuno, Akira Sato)
16Mechanical Layout of Sci-Fi
- A Reminder of the Layout of the 5 Stages
?
17Reasons to build the Sci-Fi Prototype
- The aims of the Single stage prototype will be
to- - Prove the feasibility of the design
- Solve any production problems
- Try to develop more efficient (and cheaper if
possible) construction techniques - Ensure that all stages can be made exactly the
same - Test the efficiency of the light guide
connectors - Check the spatial repeatability of the support
system - To create a working detector to allow full
system functionality
to be developed -
18The Original Model
19Mechanical Layout of Sci-Fi Prototype Single
Stage
20Mechanical Layout of Sci-Fi
21Mechanical Layout of Sci-Fi
22Mechanical Layout of Sci-Fi
23Design of the Fibre Optic Connectors
- The fibre optic connector design is governed by
the following factors - - Multiplexing Layout of Sci-Fi
- Stringing feasibility of the Connectors
- Cost, ease of manufacture and delivery
- Available space
24Design of the Fibre Optic Connectors
- The 1st Iteration
- This had 126 - 380?? holes which where so close
that it is impossible to mould not to mention
that they would need to have the fibres threaded
in the correct order.
25Design of the Fibre Optic Connectors
- The 2nd Iteration
- This has a diagonal stagger to
- maximise the distance between
- the holes (it was still not enough)
- AND STILL
- 126 separate 350? fibres
- Need to be threaded per connector!!!
26Design of the Fibre Optic Connectors
- The 3rd Iteration
- This has a diagonal stagger to maximise the
distance between - the holes but more important is that it
multiplexes at the stage. - This means that the fibres will be threaded in
bundles of 7 from the Fibre plane and all
subsequent units will have 18 1mmØ fibres.
27Layout of the connectors in the space available
- Detail of Connector Plate
28Design of the Single Stage
- The aim, as already stated, is to have all the
stages the same. This means that there is only
one development programme. - Further advantages are-
- that the amount of spares can be minimum
- All stages are interchangeable should it be
necessary to fit a less efficient stage in a less
critical position - Production will be easier
29Issues Needing to be Addressed
- Detailed design of tooling for the manufacture
and assembly of the stages - How to lay down the fibres to a known accuracy
- Light transmission of the connectors
- Multiplexing (is this the correct approach)
- Fixing and sealing into position
30Future (short term) Plans
- To define and build the prototype stage whilst
addressing the manufacturing problems - To design and develop the tooling for the
carbon-fibre structures - To further develop the fibre-optic connector
- To develop assembly and installation procedures
- ???
-
31Schedule
32SciFi Tracker SW Status Plans
Julia Sedgbeer for Ed McKigney Imperial College
London
- General SW status
- Simulation Reconstruction
- Performance Studies Plans
- Test Beam
- Resources
- Summary
- . Plans concentrate on now till October 2003
33SciFi
Engineering representation 5 stations
a) Ribbon doublet structure
b) u-v-t fibre plan
34Questions from Review Panel
- Fibre tracker
- It seems essential to perform a full simulation
of a tracker with five planes, including nominal
inefficiency and assessment of the redundancy by
simulation of the loss of readout dead fibres.
The impact of noise and misalignment should also
be assessed. What is the status of this
simulation? - Because of the cost saving by multiplexing, it is
important to repeat the simulation in a
realistically multiplexed arrangement. - Will the main alignment be derived from straight
through muons? - Some documented information on the performance of
the fibre tracker in the MUSCAT experiment would
be useful.
35General SW Status
feature status nominalSciFi simulation ideal SciFi simulation
5 stations ?
Electronic noise ? 0 (gt 2 p.e.) 0
Dead Channels implemented 0.25 0
Multiplexing ? 7 ? 1 none
Misalignment displacements ? rotations ? 0 0
36General SW Status
- Electronic Noise
- Experience of VLPCs at DØ no noise above 2
p.e. - Cross talk
- Experience at DØ no cross talk verified by HW
tests - Dead channels
- Experience at DØ 77,000 channels
- 200 compromised fibre channels 0.25
- 190 compromised VLPC channels 0.25
- Alignment
- Experience at DØ 835 µm fibres
- Precision of fibre mounting 35-40 µm
37DØ fibre tracker - VLPC performance
-
- (A.Bross)
- VLPC (Visible Light Photon Counter) Cryogenic
APD _at_ 9K - VLPC HISTE VI
- High QE 80
- Low noise lt5X104 Hz (_at_1.0 pe)
- High Rate capability
- gt40 MHz
- High production yield
- 70
38General SW Status
- Reconstruction
- space point algorithm require hits in 3 views
of 1 station - (triplet)
- track finder requires 4/5 or 5/5 triplet points
- track fit includes energy loss
- tracking efficiency purity already v. good
- (Ed Mckigney, Oct 2002, Berkeley)
- Grid
- Job submission to Grid exists (IC - EDG) being
automated - (web interface K.Georgiou)
- RF background simulation
- So far used uniform distribution parallel to axis
vary rates - Improved model being implemented (Yagmur Torun)
39Performance studies plans
?
Done (Ed Mckigney) Important
Lower priorty
study ideal SciFi nominal SciFi (MUX dead chn) except study params
RF bkg ?
MUX ?
Dead Channels
Misalignment
RF dead chn.
40RF bkg studies - pt resolution
Distributions from the Berkeley meeting
41MUX studies - pt resolution
MUX 7 ? 1 reduces pt resolution by 2
42Performance studies plans
- Reconstruction plans low priority
- Space points
- allow points made from hits in 2 out of 3 views
in a station (doublets) - Track finder
- allow limited number of double points per track
- Grid plans priority? need input from collab.
- Extend grid access to MICE collaboration
43Test Beam
- Plan ..
- Single station prototype
- Cosmic ray test FNAL September 2003
- Determine
- Light yield at VLPC sufficient to allow noise
rejection? - Cross talk small?
- (Also demonstrate multiplexing and precision of
fabrication) - . compare results with simulation
44Resources
- Computing
- Some access to Grid farms in IC/HEP and LeSC
- Adequate for studies to be done this summer
- Manpower
- Ed Mckigney replacement
- shortlist
- - expect appointment in July
- - test beam commitment
- SW A.Tapper (IC), A.Khan (Edinburgh), J.Sedgbeer
(IC), - P.Kyberd (Brunel), grad student from Oct.
(IC). - Grid K.Georgiou (IC), D.Colling(IC)
45Summary
- SW simulation reconstruction
- most of the functionality required is in place
- Computing resources
- adequate resources available
- Manpower resources
- losing Ed will be replaced
- but test beam commitment
- plus some extra manpower for SW Grid
- Aim to complete required SW studies by October
46- 3) Major progress on Sci-Fi tracker !!!!!!!!!!!
- congratulations
to the Sci-Fi team - 1000 Sato KEK Test Results/Plans
- lab tests reducing photon MFP
(.460 mm) x-talk - several new fibers
delivered for studies of MFP much more - 2 weeks of beam tests at
KEK later this month - 1050 Barber SciFi Tracker Progress in Design,
Prototype, Plans - prototypes of support of single
stage of 3 fiber planes - support of connectors
AND connectors (7 fold multiplexing built in !!!
) - final
carbon fibers structure in September - 1110 Sedgbeer SciFi Tracker Software
Status/Plans - SW simulation reconstruction -- most of
the functionality required is in place - Computing resources -- adequate resources
available - Manpower resources - losing Ed will be
replaced but test beam commitment - plus some extra manpower for SW
Grid - Aim to complete required SW studies by
October
471130 Summers Tracker Choice Ground Rules and
Process draft set of rules defined by Don
Ghislain common technical criteria
cost and schedule
criteria Sci Fi specific criteria
TPG specific criteria To be discussed
agreed by both parties in
forthcoming phoneconference(s)
well before end of October CM
Forthcoming videoconference(s) will monitor
progress of both very closely
and frequently
48Introduction .. and summary
- Progress towards upgrade of the downstream bug
- downstream PID taylored to 300 MeV/c m
(200 MeV Tkin ) - based on only existing old track
files, so never adapted to 200 MeV/c (121 MeV ) - needs some
serious rethink (by means of new track files
!!!) - 1000 muons throu G4MICE. a
MUST !!! .. volunteer needed !!!
2) Short update from TOF ( B field tests, TOF 0
max rates ) NB TOF0-TOF1 may
well be only 6 m apart (B. Palmer) 3) Major
progress on both trackers !!!!!!!!!!!!!!!!!!!!
congratulations to
both teams next CM .
end of October ..
OK
CORRAL .. 4) Rules of the shoot-out (Summers