Title: Yuma Desalting Plant


1
Yuma Desalting Plant Plant Demonstration Run
Successes and Challenges
2
NPR
  • Boondoggle to Boom

3
  • Yuma Desalting Plant
  • Largest Plant of its kind in the United States
  • Constructed to desalt Wellton-Mohawk water
  • lt150ppm product water discharged to Colorado
    River
  • For inclusion in water deliveries to Mexico
  • Reduces releases from river system reservoirs

4
gt200 Olympic size pools per day
5
  • Yuma Desalting Plant
  • Largest Plant of its kind in the United States
  • Constructed to desalt Wellton-Mohawk water
  • lt150ppm product water discharged to Colorado
    River
  • For inclusion in water deliveries to Mexico
  • Reduces releases from river system reservoirs

6
60 acre site of the YDP
7
  • Plants past and present
  • Last operated in 1993
  • Stopped by flooding on the Gila River
  • No need under abundant water conditions
  • Thats changed serious drought decade to date
  • Plant is a potential tool to extend water
    supplies

8
Flooding on the Gila River
9
  • Plants past and present
  • Last operated in 1993
  • Stopped by flooding on the Gila River
  • No need under abundant water conditions
  • Thats changed serious drought decade to date
  • Plant is a potential tool to extend water
    supplies

10
Low water at Lake Mead
11
  • Demonstration operation
  • Reclamation committed to demonstrating operation
    of the plant in
  • early 2006. Five objectives
  • Re-establish that the plant can run
  • Clarify performance and cost estimates
  • Demonstrate current technology
  • Improve overall plant readiness
  • Provide measurements of water quality impacts

12
Technological improvements
13
  • Demonstration operation
  • Reclamation committed to demonstrating operation
    of
  • the plant in early 2006. Five objectives
  • Re-establish that the plant can run
  • Clarify performance and cost estimates
  • Demonstrate current technology
  • Improve overall plant readiness
  • Provide measurements of water quality impacts

14
(No Transcript)
15
Demo run ceremony
16
  • Scope and scale of the demo
  • 10 of full capacity operation
  • 90 day duration
  • Ensured a valid test at a reasonable cost
  • Demonstration run began on March 1
  • All objectives have been met

17
  • Added success
  • Government, water users and conservation
    interests can find common ground
  • Heightened interest in potential alternative uses
    of the plant

18
  • Alternative uses of the plant
  • Process a different feed water
  • Produce potable water

19
  • The challenge
  • Where does this plant fit into the water supply
    picture for the Lower Colorado River? How do we
    best use this asset?