Title: CMS Project at UR


1
CMS Project at UR
  • Pawel de Barbaro
  • University of Rochester
  • DoE Review
  • July 15-16, 2002

2
Participants
  • Task D Participants (CMS-HCAL)
  • Faculty Prof. A. Bodek
  • Research Faculty Dr. P. de Barbaro, Dr. H.
    Budd, Dr. W. Sakumoto
  • Research Associate Dr. Y. Chung
  • Task B Participants (CMS-HCAL)
  • Faculty Prof. P. Slattery
  • Research Faculty Dr. G. Ginther
  • Task D Participants (CMS-TOB)
  • Faculty Prof. P. Tipton
  • Research Faculty Eva Halkiadakis, Andy Hocker
  • Graduate Students Ricardo Eusebi

3
System Overview
System Overview


4
HCAL Engineering Design
HCAL - Engineering in WH6
5
Responsibilities
  • CMS Projects at U. of Rochester
  • HCAL
  • Optical Readout System for Hadron Barrel (HB)
    Calorimeter
  • AssemblyIntegration of Readout boxes for HB, HE
    and HO
  • construction of Motion Table for H2 test beam at
    CERN
  • Tracker
  • construction of Silicon Strip Tracker (Tracker
    Outer Barrel, TOB), talk by P. Tipton

6
CMS HCAL Outline
  • Absorber
  • Optics
  • Readout Box
  • HPDs
  • Other tasks
  • Conclusions

7
Activity at CERN
  • Scintillators installed into HB- wedges at bldg
    186
  • All HB- wedges tested with radioactive source
    system, pronounced ready
  • Wedges transported to SX5 for installation into
    cradle.
  • HB wedges at 186, scintillator installated and
    tested.
  • Assembly of HB into cradle in Sep 02.

8
HB- Wedges at Bldg 186
9
HB Absorber
  • All HB- and HB wedges at CERN
  • HB- assembled at SX5, HB wedges to be assembled
    in Sept 2002.
  • HB- Wedge 16 (damaged during transport) has been
    rebuilt, tested

10
HB- Assembly at SX5
11
HB- Assembly at SX5
12
Assembled HB- Barrel in SX5
13
Lab 5 Factory
  • HB Optics factory in final phase.
  • Will be winding down in December. (Need to
    repair/replace megatiles for HB-16). Reduce
    staffing from 13 to 5.
  • Continue to build optical cables for HB and
    fiber parts for optical decoder units.
  • Factory will redirect to work on components for
    RBXs, HV, LV, electronics components.

14
Lab5 Optics factory (HB megatile production)
15
Other Optics tasks
  • Improve performance of optical cables
  • Task taken over from UIC.
  • Problem tests at CERN this summer indicated that
    cables are very hard to install and
    connect/disconnect.
  • Solution increasing slightly (1.5mils) hole
    size for alignment pins can improve
    connection/disconnection, without compromising
    RMS of light transmission

16
Optical cable layout
17
Placement of readout boxes
18
HB RBX Assembly
Full RBX with 19 ch RMs
RBX Interior -- HV distributor and backplane
19
RBX Readout Module
The readout module (RM) integrates the HPD, front
end electronics, and digital optical drivers. PRR
passed March 1-2. HB Production begun
mechanics only. HE in design.
20
Optical decoder unit (ODU)
21
ODU part facing HPD
22
Hybrid Photo Detectors (HPDs)
23
RBX production status
  • HB
  • HB RBX shell parts completed, at Lab 5 ready for
    assembly
  • HB ODUs finished, at Lab 5
  • Backplanes finished, at FNAL
  • Assembly work started at Lab 5
  • HE
  • Design almost complete
  • Second mechanical prototype in construction at
    Ole Miss
  • Subassemblies for ODUs ready. ODUs will be built
    at Notre Dame factory this summer (QuarkNet)
  • HE RBX parts scheduled to be completed in
    September 02.
  • HO
  • Design starting this month.
  • Will have a PRR at CERN during September CMS
    week.
  • Plan to complete all RBXs by March 1 , 03

24
Near Term / 2002 Test Beam
  • Will instrument HB wedges in November
  • Test beam calibration of wedges of HB in summer
    of 2002
  • Will use second generation QIEs running at
    40Mhz.
  • CCAs
  • GOL / VCSEL into HTR ?DCC Prototypes
  • Assemble HB in September 2002

25
Conclusions
  • Tasks Completed
  • HCAL Barrel absorber ready
  • Production and installation of Scintillator
    megatiles completed
  • HB- barrel assembled and tested
  • New tasks for Rochester
  • Integration and testing of readout boxes at Lab 5
    at Fermilab (CMS Rochester Techs under Rochester
    upervision).
  • Installation and Commissioning of US CMS detector
    at CERN (Pawel de Barbaro will become US CMS
    Coordinator at CERN in March 2003)

26
Front End Electronics
  • QIE chips at FNAL (first submission).
  • Chips are fully functioning. Front end noise
    being studied.
  • CCA chips at FNAL. Problem with communication to
    chip. (Bug in layout solved by laser
    microsurgery). Seems fully functional!
  • A chance that both CCA and QIE can skip a
    generation of submissions, have production parts
    by March 02.
  • GOL (Gigabit Optical Link) Serializer prototype
    chip at FNAL. Being tested at 45 Mhz, works fine.
    (Normal operation 40 Mhz).
  • VCSEL chosen, parts being ordered.
  • Fiber optic cable plant being finalized.
    (Discussion this week at CERN).

27
FE/DAQ Electronics
28
FE Readout Card
VCSEL
29
Six channel FE Proto

30
HCAL Opto-Link
31
VCSEL/GOL Testing
Prototype GOL
Custom VCSEL Packaging