Title: CMS Project at UR
1CMS Project at UR
- Pawel de Barbaro
- University of Rochester
- DoE Review
- July 15-16, 2002
2Participants
- Task D Participants (CMS-HCAL)
- Faculty Prof. A. Bodek
- Research Faculty Dr. P. de Barbaro, Dr. H.
Budd, Dr. W. Sakumoto - Research Associate Dr. Y. Chung
- Task B Participants (CMS-HCAL)
- Faculty Prof. P. Slattery
- Research Faculty Dr. G. Ginther
- Task D Participants (CMS-TOB)
- Faculty Prof. P. Tipton
- Research Faculty Eva Halkiadakis, Andy Hocker
- Graduate Students Ricardo Eusebi
3System Overview
System Overview
4 HCAL Engineering Design
HCAL - Engineering in WH6
5Responsibilities
- CMS Projects at U. of Rochester
- HCAL
- Optical Readout System for Hadron Barrel (HB)
Calorimeter - AssemblyIntegration of Readout boxes for HB, HE
and HO - construction of Motion Table for H2 test beam at
CERN - Tracker
- construction of Silicon Strip Tracker (Tracker
Outer Barrel, TOB), talk by P. Tipton
6CMS HCAL Outline
- Absorber
- Optics
- Readout Box
- HPDs
- Other tasks
- Conclusions
7Activity at CERN
- Scintillators installed into HB- wedges at bldg
186 - All HB- wedges tested with radioactive source
system, pronounced ready - Wedges transported to SX5 for installation into
cradle. - HB wedges at 186, scintillator installated and
tested. - Assembly of HB into cradle in Sep 02.
8HB- Wedges at Bldg 186
9HB Absorber
- All HB- and HB wedges at CERN
- HB- assembled at SX5, HB wedges to be assembled
in Sept 2002. - HB- Wedge 16 (damaged during transport) has been
rebuilt, tested
10HB- Assembly at SX5
11HB- Assembly at SX5
12Assembled HB- Barrel in SX5
13Lab 5 Factory
- HB Optics factory in final phase.
- Will be winding down in December. (Need to
repair/replace megatiles for HB-16). Reduce
staffing from 13 to 5. - Continue to build optical cables for HB and
fiber parts for optical decoder units. - Factory will redirect to work on components for
RBXs, HV, LV, electronics components.
14Lab5 Optics factory (HB megatile production)
15Other Optics tasks
- Improve performance of optical cables
- Task taken over from UIC.
- Problem tests at CERN this summer indicated that
cables are very hard to install and
connect/disconnect. - Solution increasing slightly (1.5mils) hole
size for alignment pins can improve
connection/disconnection, without compromising
RMS of light transmission
16Optical cable layout
17Placement of readout boxes
18HB RBX Assembly
Full RBX with 19 ch RMs
RBX Interior -- HV distributor and backplane
19RBX Readout Module
The readout module (RM) integrates the HPD, front
end electronics, and digital optical drivers. PRR
passed March 1-2. HB Production begun
mechanics only. HE in design.
20Optical decoder unit (ODU)
21ODU part facing HPD
22Hybrid Photo Detectors (HPDs)
23RBX production status
- HB
- HB RBX shell parts completed, at Lab 5 ready for
assembly - HB ODUs finished, at Lab 5
- Backplanes finished, at FNAL
- Assembly work started at Lab 5
- HE
- Design almost complete
- Second mechanical prototype in construction at
Ole Miss - Subassemblies for ODUs ready. ODUs will be built
at Notre Dame factory this summer (QuarkNet) - HE RBX parts scheduled to be completed in
September 02. - HO
- Design starting this month.
- Will have a PRR at CERN during September CMS
week. - Plan to complete all RBXs by March 1 , 03
24Near Term / 2002 Test Beam
- Will instrument HB wedges in November
- Test beam calibration of wedges of HB in summer
of 2002 - Will use second generation QIEs running at
40Mhz. - CCAs
- GOL / VCSEL into HTR ?DCC Prototypes
- Assemble HB in September 2002
25Conclusions
- Tasks Completed
- HCAL Barrel absorber ready
- Production and installation of Scintillator
megatiles completed - HB- barrel assembled and tested
- New tasks for Rochester
- Integration and testing of readout boxes at Lab 5
at Fermilab (CMS Rochester Techs under Rochester
upervision). - Installation and Commissioning of US CMS detector
at CERN (Pawel de Barbaro will become US CMS
Coordinator at CERN in March 2003) -
26Front End Electronics
- QIE chips at FNAL (first submission).
- Chips are fully functioning. Front end noise
being studied. - CCA chips at FNAL. Problem with communication to
chip. (Bug in layout solved by laser
microsurgery). Seems fully functional! - A chance that both CCA and QIE can skip a
generation of submissions, have production parts
by March 02. - GOL (Gigabit Optical Link) Serializer prototype
chip at FNAL. Being tested at 45 Mhz, works fine.
(Normal operation 40 Mhz). - VCSEL chosen, parts being ordered.
- Fiber optic cable plant being finalized.
(Discussion this week at CERN).
27FE/DAQ Electronics
28FE Readout Card
VCSEL
29Six channel FE Proto
30HCAL Opto-Link
31VCSEL/GOL Testing
Prototype GOL
Custom VCSEL Packaging