2Internship ReportAbdul Mateen Khan MBA
(Management)(MC070403976) Fall 2009
3Contents
Brief Introduction of the Organization
Organization Hierarchy Chart
Internship / Training Plan
Management Functions
Critical Analysis
SWOT Analysis
Conclusion
Recommendation
4Overview (1/10)
- History
- Service Providing Telecommunication Compony
- Known as TIER4 Pvt Ltd
- Registered in 2007
- Started with 16 employees
- Starting Project NSN Telenor Project.
- Now more then 150 employees
- Working in North, South and Centeral Region of
Pakistan - Recent is reputed subcon of HUAWEI Telecom
- Establishing Two new Offices in Multan Karachi
5Vision Overview (2/10)
- TIER4 intend to lead in Telecom Implementation,
Data Communication, Microwave and All types of
Transmission and Connectivity.
6Mission Overview (3/10)
- TIER4 committed to achieve its goals and always
concern to the optimum benefits of clients. - To develop its professional skills and
techniques and teams, its managerial strength
resources will be strengthened. - TIER4 is capable of managing, all the companies
and sub-contractors involved in the deployment
process.
7Types of Services Overview (4/10)
- Telecom Installation
- Testing Commissioning
- Power DG Installation
- Logistic Movement of material
8Business Volume Overview (5/10)
- The portfolio of mega-projects in which TIER4
has participated since its beginning are. - NSN TELENOR
- Rollout
- Site Survey TSSR
- Logistic Support
- HUAWEI
- Ufone (Rollout Expension)
- Zong (Rollout Expension Swap)
- Warid (Rollout)
- PTCL(MW Links CDMA)
- Local Site Survey LOS
9How it works Overview (6/10)
- DN Processing and Collection
- Follow up transportation
- Hardware receiving, Verification and RFI
- Team Movements
- Follow up Complete workflow chart
- SOP implementation
- Quality checklist
- Media Patching and call test
- Pre-ATP and DT support
- ATP
- Snags Verification
- Commercial Launch
10TIER4 Work Flow Overview (7/10)
11Achievement Overview (8/10)
- Outstanding Achievement Award 2007
- by Nokia-Siemens Networks
12Achievement Overview (9/10)
- Place in A grade for the 3rd quarter in Ufone
Project all region 2008.
13Competitors Overview (10/10)
Sr No Names Sr No Names
1 ELTEK Karachi Pakistan 8 IKAN Engineering Judicial Colony Raiwand Road Lahore
2. RELACOM Pakistan (Pvt) Ltd Karachi 9 Wajda International Lahore
3. Haris Co Faisal Town Lahore 10 Watanserve Rwp
4. Enter SES 11 MYSON Engineering System Islamabad
5. NETCOM Solutions (Pvt) Ltd 12 High Rise Pvt Ltd E-8 Islamabad
6. ATL 13 Technocrate Pakistan Karachi
7. Global Technology Islamabad 14 Sifco Engineering Service Multan
14Organization Hierarchy Chart
15Internship Plan/Training Plan
Departments Duration Training Date Schedule Activity
Administration (HR/Store) 4 Week 01 31 Mar 2009 Include study of HR Activities and Store . Recruiting the candidates Selecting the appropriate candidates. Training Development of the employees. Methods use for job analysis. Career Development program. Orientation program policy Performance appraisal. Hiring and Firing
Accounts (Finance/Salary/TA/DA) 2 Week 01 15 Apr 2009 File Management Preparation of invoices of Payments Receipts Preparing of Salaries
Engineering (Tech/QC) 2 Week 01 30 Apr 2009 How operations are carried out in line with safety and quality policies.
16Orientation Task Asigned
Departments Task Asigned
Administration (HR/Store) Engineers and Technical and Admin and staff files management of the attendance records, official correspondence through mails, prepare and issue the appraisal and experience letters documents separately for each network deployment projects equipments/store issuance or receiving record is managed.
Accounts (Finance/Salary/TA/DA) How transaction are electronically made. How invoices are made and claim of payment is made in line with progress made on the project. 70 of payment is made if half of any HUAWEI Corporation China any assignment of project is complete and remaining is made at the end of project. How to prepare salaries and TA/DA of the employees.
Engineering (Tech/QC) how to workflow of TIER4 occurs how quality of services are ensured. Similarly what are the safety and quality instruction regarding TIER4 activities.
17Management Functions
Planning
Organizing
Leading
Controlling
18Management Functions
- Planning
- Planning is setting standards and goals and
making strategies to achieve those goals. - Decision-making Process
- At TIER4, there is mixed of centralization and
some context of decentralization type of
decisions. - Organizations Current Strategies
- Sincerity towards responsibilities
- No Compromise on Quality
- Customer relationship
- Quick response , Willingness for Post Services
demands - Co-ordination between Management and Field
Engineers - Dedicated services, Positive attitude
19Management Functions
- Organizing
- Organizing is assembling and coordinating the
human, financial, physical, informational, and
other resources needed to achieve goals. - Main Office organize all TIER4 administrative
and technical activities. - Number of Employee 150 employees
- Organizational Design
- Departmentalization Admin Engineering,
- Span of Control Chief Executive Officer Teams
Head - Chain of Command Chief Executive Officer to Teams
Head - Centralization Decentralization Both Exists
- Formalization Formal and informal
- Work Specialization Specified job engineers and
staff - Managing Change Due to IT, Telecom and very
nature of services - along
with dedication of staff easily manages - change
20Management Functions
- Leading
- Leading is stimulating people to be high
performers. It is directing, motivating, and
communicating with employees, individually and in
groups. - Leadership Style
- Chrismatic
- Instrumental
- Participative
- Above leadership style is followed by the top
management of TIER4 (Pvt) Limited.
21Management Functions
- Controlling
- Controlling involves monitoring progress and
implementing necessary changes. - Controlling Operation
- TIER4 is also controlling its operations by
adopting different control methods, which assess
how efficiently and effectively an organization's
transformation processes create goods and
services. These methods are - SOPs
- Quality test of installation and commissioning of
sites - Quality audit and evaluation criteria of
different vendors - Controlling Performance
- Performance Appraisal System
- At TIER4, the performance appraisal system,
which is followed by the management, is based
upon results, which the employees are given on
daily basis.
22SWOT Analysis (1/4)
- Strengths
- Highly qualified young work force
- .Completion of Projects in Required time.
- .Competitive Prices for Installation services.
- Quality control services Professional Expertise
Proper Engineering services - Reliable cooperation with Vendors.
- Parallel Telecom Installation operations.
- Installation through properly trained staff.
- Competitive TI rates No additional rates for
Quality services and Services through out
Pakistan. - TI installation service coverage in all sort of
environment and climate - Congenial atmosphere for working.
- Chrismatic Instrumental leadership of CEO which
leads staff to create dedication, interest trust
among working force.making them as a single unit
with cooperation and appropriate conduct.
23SWOT Analysis (2/4)
- Weaknesses
- TIER4 has space constraints as for as the land at
which it is situated. - High amount of expenditure due to the reason that
TIER4 has to pay the high rent of the office
building/store and hostels for work force. - Improper allocation of financial funds by the
management. - Highly centralized decision-making as key
decision revolves about CEO. - Organization form is sole proprietorship.
- High turnover of faculty and staff.
- Comparatively newcomer and Smaller in addressing
market
24SWOT Analysis (3/4)
- Opportunities
- TIER4 is located in industrial area industrial
linkage can be established for R D purpose. - New Engineering departments and industrial
management department are being opened because of
industry demand such as opening of new offices
and Multan and Karachi cities.. - TIER4 can provide consultation to local industry.
- Employees can get internship/training in local
industry. - TIER4 can enhance its manpower as it is easily
available due to high education rate in Islamabad.
25SWOT Analysis (4/4)
- Threats
- New institutes are opening in the locality, which
may become threat for TIER4 in future. - TIER4 is emerging organization, an entrant to
industry where already working big organization
may tackle its market with adopting better
strategies.
26Critical Analysis
- Key role in planning revolves around the CEO
- Ownership be separate from business entity
- Amalgamated HR Store, Account and Finance
separation is required. - Planning in order to have own building,
transportation and labor.. - Alternative of CEO for handling organizing
matters - Management of medical and health coverage matter
- Performance evaluation criteria also need to
improve
27Conclusion
- Core strength of TIER4 is its all workforce
working like a single unit - Involvement of CEO interest and dedication
- Willingness of every individual to go to far
flung areas for erecting of towers and
preparation of sites - TIER4 always prefers individual task outcomes,
and evaluates the performance of its employees to
identify the training and development needs,
performance rewards and employees correction - Fast pace working system and self discipline
team.
28Recommendations (1/4)
- Chief Executive Officer must prepare an official
for doing activities like him. - There must be a separate building for distinction
between different levels of individuals - Proper Management functions need to practice such
as accounting system and finance system should be
separated.. - To look store matter proper person with
experience of handling store should be appointed - TIER4 is form of sole proprietorship. It should
make endeavor to partnership organization,.
Partnership should be made with the indl who
possess telecom knowledge. In TIER4 partnership
has some form but other partner is only familiar
with administration not with telecom sites
installation and commissioning.
29Recommendations (2/4)
- It must have spacious building as TIER4 is only
having its infrastructure in two or three rooms
on rent. - It has not own its own transportation. To
facilitate the procedure it must have its own
transportation and work force to derive them. - Similarly it has to hire labor from SAM Tours. So
it should have its own labor along with
transportation facility to run its business
activities in all over Pakistan. - .Recruitment process may be strengthened.
- There is a strong need for training at each
level.
30Recommendations (3/4)
- There should be involvement of manager operation
or Dy manager operation in meeting with other
vendors gaining work for TIER4 so that
alternative might be there for CEO - The evaluation process should be strengthened by
adopting training measure to officer responsible
for evolution of employees. - Although TIER4 is focusing on employee
development, however there is a need for employee
training especially with respect to the Engineer
as some of them are new to the field and don not
know the effective way to deliver their services.
31Recommendations (4/4)
- Opportunities for growth of the employees should
be created and those striving to avail such
opportunities may be entertained rather than
denying and loosing potential individuals. - An internal search for recruiting the employees
may be highly beneficial for the institution.
Such type of activity gives a spirit and
increases morale of the employees.
32Thank You !