F.E.S. MAJOR PROGRAMS FIRE PROTECTION DIV. F/Y02 INFO. - PowerPoint PPT Presentation

1 / 2
About This Presentation
Title:

F.E.S. MAJOR PROGRAMS FIRE PROTECTION DIV. F/Y02 INFO.

Description:

F.E.S. MAJOR PROGRAMS FIRE PROTECTION DIV. F/Y02 ... 6 Personnel Assigned. 2,013 Fire Hazards Reported. 1,484 Fire ... Air Cargo Branch. 19 Personnel Assigned ... – PowerPoint PPT presentation

Number of Views:61
Avg rating:3.0/5.0
Slides: 3
Provided by: lafu5
Category:

less

Transcript and Presenter's Notes

Title: F.E.S. MAJOR PROGRAMS FIRE PROTECTION DIV. F/Y02 INFO.


1
F.E.S. MAJOR PROGRAMSFIRE PROTECTION DIV. F/Y02
INFO.
  • Sructural Fire Branch
  • 59 Personnel Assigned. 10 Equipment Assigned,
    Operated and Maintained.
  • 306 ea. Emergency Responses For The Period. 15
    Fires. 0,00 Fire Loss.
  • Operating Cost Labor 3,270,161. Material
    184,624. Total Cost 3,454,785.
  • Crash/Fire Rescue Branch
  • 37 Personnel Assigned. 14 Equipment Assigned,
    Operated and Maintained.
  • 99 ea. Emergency Responses For The Period. 218
    ea. Haz. Op. Standbys.
  • Operating Cost Labor 1,984,457. Material
    272,641. Total Cost 2,257,097.
  • Fire Prevention Branch
  • 6 Personnel Assigned. 2,013 Fire Hazards
    Reported. 1,484 Fire Hazards Corrected.
  • Operating Cost Labor391,301. Material
    33,092. Total Cost 424,394.
  • 101 Total Personnel Assigned To The Fire
    Protection/Prevention Division Of The
    F.E.S.Department. Average Age 42 Years
  • Total Operating Cost Of Fire Protection/Prevention
    Division Labor 5,645,919.
  • Material 490,257. GRAND TOTAL 6,136,276
  • Initiatives Mobile Aircraft Fire Trainer Bought
    500K. More. Service level 1 No special Issues
  • Outlying Sites
  • H-2, H-3, H-4 Radar Sites Built in Fire
    Protection Systems 5 Auxiliary Firefighters.
  • NAVCOMSTA Grindavík Mutual Aid.
  • NATO Fuel Facility Whale Bay 1 ea. Foam Truck
    Auxiliary Fire Team. ( Decommissioned)

2
F.E.S. MAJOR PROGRAMSAIRFIELD OPERATIONS
DIVISION. F/Y02 INFO.
  • Snow Removal, Ice And Fod Control Branch.
  • 17 Personnel Assigned 12 Winter Over Hires. 51
    Equipment Assigned, Operated And Maintained.
  • 9,139 Snow Removal/Ice And FOD Control
    Operations.
  • Operating Cost Labor 1,457,634. Material
    585,10. Total Cost 2,042,734.
  • Air Cargo Branch.
  • 19 Personnel Assigned. 18 Equipment Assigned,
    Operated And Maintained.
  • 7,909,927 lbs. Of Cargo Airlifted.
  • Operating Cost Labor 811,423. Material
    56,979. Total Cost 868,402. (Reimbursed by AMC
    )
  • Transient Line.
  • 6 Personnel Assigned. 12 Equipment Assigned,
    Operated And Maintained.
  • 4,483 Services Performed.
  • Operating Cost Labor 312,992. Material 6,370
    Total Cost 319,362.
  • Arresting Gears.
  • 5 Personnel Assigned. 7 Equipment Assigned,
    Operated And Maintained.
  • 4 Aircraft Arrestments Performed, 646 Arresting
    Gears Rigs/Derigs.
  • Total Operating Cost Of Airfield Operations
    Division Labor 2,804,514. Material 671,008.
  • GRAND TOTAL 9,611,798. Service Level 1.
    Initiative Runway Sweeper 350K Straight Lease.
  • ISSUE 1. Replacements Needed For Snow Removal
    Equipment Total 1,050K Next 3 Fis.Yrs.More Info
    Here ISSUE 2. Replacements Identified For FOD
    Equipment Total 200K.More Info. Here
  • ISSUE 3. Bldg.832 Improve More Info. Here
Write a Comment
User Comments (0)
About PowerShow.com