Planning - PowerPoint PPT Presentation

About This Presentation
Title:

Planning

Description:

Title: CERN European Organization for Nuclear Research Author: sahner Last modified by: mayer Created Date: 10/30/2003 3:52:19 PM Document presentation format – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 17
Provided by: sah73
Category:

less

Transcript and Presenter's Notes

Title: Planning


1
2 PROTOTYPES FOR SPS - OUTLINE
  • Planning
  • Quality control - Manufacturing logbook
  • Photos
  • Conclusions

2
2 PROTOTYPES FOR SPS -MANUFACTURING
  • Planning production installation
  • Very detailed planning established at the start
    of
  • the manufacturing drawings
  • Including ALL operations - on a daily basis
  • TOTAL 123 days until installation 18.08.04
    800h
  • This included
  • Design, stores, workshop, brazing, metrology, lab
    for
  • thermal measurements, assembly, pressure test,
  • vacuum test, electro beam-welding, bakeout
    equipment,
  • calibration, test of moving mechanism
  • Space requirements in SPS, safety - radiation
  • installation logistics, transport
  • ON TIME within less than 5 days

3
2 PROTOTYPES FOR SPS MANUFACTURING
  • Quality control - Manufacturing logbook
  • Record non-conformities
  • Record dimensional measurements
  • Record reference measurements for final alignment
    in SPS
  • Time of operations for estimation of series
    production - will serve as an example for
    industry
  • Photos

4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
CONCLUSIONS
  • The mechanical design remains close to the LEP
    collimators
  • BUT high beam energy requires carbon and very
    efficient cooling - new jaws design
  • Extensive thermo-mechanical analyses predict that
    the requested 25 µm should be possible but not
    proven yet
  • prototype manufactured on standard machines
  • Temperature measurements confirm thermal
    calculations
  • Prototype design finished, series design started

15
CONCLUSIONS next steps
  • Manufacture of three prototypes according to
    schedule, two for the SPS one for tests
  • Installation date in sight
  • Market survey for series production launched
  • Many different versions ( TCP, TCS, TCT, TCLI,
    TCLP, TCHS, TCDI ) with different angles
  • Standardisation of different types of
    collimators will require considerable design
    effort ( one motor, two motors, plug-in, spares )
  • Special types with two beams in the same tank
    need still to be studied in detail

16
FINAL REMARKS
  • Next Milestone
    drawings for
    tender of part of the series - end of
    August
  • lot of work still ahead!
  • KEEP THE MOMENTUM GOING
  • Re-enforce the design team
  • TO MEET THE DEADLINE OF THE FINANCE COMMITTEE BY
    THE END OF THE YEAR
Write a Comment
User Comments (0)
About PowerShow.com