1
Addl. PD, DRDA,BOLANGIR
Presentation by
  • LORD

HARISHANKAR
2
M G N R E G A
ACHIEVEMENTS
  • No. of Families Regd. 18657
  • Persons Regd. 45932
  • Job Cards Issued 18657
  • Families Completed 100 days in 09-10 1070
  • Maximum Nos. of Engaged in a Day 4636

    (on dt.12/03/2010)
  • Available Funds 3.79 Crore
  • Expenditure incurred 4.54 Crore
  • Total Projects 91
  • Man days Generated 304701
  • Labour Materials Ratio 7030

3
STRATEGY ADOPTED
  • Active Participation of PRI Members.
  • Motivation of Staff.
  • That MGNREGA is not just duty but social service.
  • Project Initiation Meeting in every village.
  • Convinced Job Seekers that MGNREGA is more
    lucrative than Migration.
  • Promise Job seekers timely payment.
  • Initiation of projects in almost every village.
  • Personal Attention to avoid late payment.
  • Coordinated with bank and post office to ensure
    timely disbursement of wages.

4
Renov. of Gochermunda Tank at BudhibahalUDIAPALI
GRAM PANCHAYATEstd. Cost Rs. 10.00 Lakh
Expenditure Rs.5.15 Lakh
CODE 2409003018/WH-SUNKHENPOND/106633
Salient Features of the Project
  • Catchment Area 1.0 Sq. Km.
  • Water Spread Area 1.5 Hect.
  • Command Area 200 Acres
  • Estimated Mandays 7000
  • The project involves construction of an earth
    embankment of 300 m. long, surplus and two nos
    outlets with canals to provide flow irrigation to
    200 acres of land in the Kharif season. In
    addition the project will improve soil moisture
    level, ground water table.

5
Renov. of Gochermunda Tank at BudhibahalUDIAPALI
GRAM PANCHAYATEstd. Cost Rs. 10.00 Lakh
Expenditure Rs.5.15 Lakh
Before Execution
CODE 2409003018/WH-SUNKHENPOND/106633
6
Renov. of Gochermunda Tank at BudhibahalUDIAPALI
GRAM PANCHAYATEstd. Cost Rs. 10.00 Lakh
Expenditure Rs.5.15 Lakh
Men at Work / During Execution
CODE 2409003018/WH-SUNKHENPOND/106633
7
Renov. of Gochermunda Tank at BudhibahalUDIAPALI
GRAM PANCHAYATEstd. Cost Rs. 10.00 Lakh
Expenditure Rs.5.15 Lakh
State Level Monitor Interacting with Jobseekers
Officials
CODE 2409003018/WH-SUNKHENPOND/106633
8
Renov. of Gochermunda Tank at BudhibahalUDIAPALI
GRAM PANCHAYATEstd. Cost Rs. 10.00 Lakh
Expenditure Rs.5.15 Lakh
CODE 2409003018/WH-SUNKHENPOND/106633
Honble Spl. Reportier to NHRC Dist. Officials.
Judging facts.
9
Renov. of Gochermunda Tank at BudhibahalUDIAPALI
GRAM PANCHAYATEstd. Cost Rs. 10.00 Lakh
Expenditure Rs.5.15 Lakh
CODE 2409003018/WH-SUNKHENPOND/106633
WORK SITE FACILITIES
10
Imp. of Lathor Talipada JamlibandhLATHOR GRAM
PANCHAYATEstd. Cost Rs. 20 Lakh Expenditure
Rs.11.22 Lakh
Brief outline of the Project
CODE 2409003009/WH-PERCOLATION/92573
  • It is envisaged to construct a 5.0 acres
    balancing reservoir to provide life saving
    irrigation to approx. 500 acres of land.
  • As per Master Plan water from an adjacent WHS
    constructed out of BRGF will be fed to the
    Reservoir which will subsequently be diverted for
    Irrigating the farm land.
  • In addition to providing irrigation, the project
    will meet Domestic needs of the tribal village,
    Phuljhar and recharge the rapidly depleting
    ground water table.
  • Above all the project will provide job to the job
    seekers of Phuljhar village for two consecutive
    years who otherwise are tempted to migrate in
    search of work to neighboring states.

11
Imp. of Lathor Talipada JamlibandhLATHOR GRAM
PANCHAYATEstd. Cost Rs. 20 Lakh Expenditure
Rs.11.22 Lakh
Men at Work / During Execution
CODE 2409003009/WH-PERCOLATION/92573
12
Imp. of Lathor Talipada JamlibandhLATHOR GRAM
PANCHAYATEstd. Cost Rs. 20 Lakh Expenditure
Rs.11.22 Lakh
Social Audit Commitment to Transparency and
Sincerity to
address grievances.
CODE 2409003009/WH-PERCOLATION/92573
13
Renov. of Ranikata WHS at HirliBAGHMUND GRAM
PANCHAYATEstd. Cost Rs. 10 Lakh Expenditure
Rs.9.21 Lakh
CODE 2409003001/WC-WHS/101553
Salient Features of the Project
  • Catchment Area 0.75 Sq. Km.
  • Water Spread Area 1 Hect.
  • Command Area 100 Acres
  • Estimated Mandays 7000
  • The project was constructed nearly 20 years back
    and was left in an incomplete state. A huge earth
    embankment was completed without providing
    surplus. Left canal constructed to conduit water
    to the command area got silted up due to lack of
    maintenance and led to washing away of
    embankment. It was essential to restore the
    project to provide life saving Kharif irrigation
    to the chronically draught affected aya-cut. The
    work involves restoration of earth embankment,
    const. of chute spillway and one no outlet with
    desilting of canals.

14
Renov. of Ranikata WHS at HirliBAGHMUND GRAM
PANCHAYATEstd. Cost Rs. 10 Lakh Expenditure
Rs.9.21 Lakh
CODE 2409003001/WC-WHS/101553
Men at Work / During Execution
15
Renov. of Ranikata WHS at HirliBAGHMUND GRAM
PANCHAYATEstd. Cost Rs. 10 Lakh Expenditure
Rs.9.21 Lakh
CODE 2409003001/WC-WHS/101553
Men at Work / During Execution
16
Const. of Check Dam at KarlakutunaKHAPRAKHOL
GRAM PANCHAYATEstd. Cost Rs. 5 Lakh
Expenditure Rs.4.50 Lakh
CODE 2409003008/WH-MIP/66079
Salient Features of the Project
  • Catchment Area 0.5 Sq. Km.
  • Water Spread Area 0.7 Hect.
  • Command Area 40 Acres
  • Estimated Mandays 4000
  • The project involves construction of an earth
    embankment of 100 m. long, and one no. outlet to
    provide flow irrigation to 40 acres of land in
    the Kharif season. In addition the project will
    improve soil moisture level, ground water table
    meet domestic needs of Villagers of Karlakutuna.

17
Const. of Check Dam at KarlakutunaKHAPRAKHOL
GRAM PANCHAYATEstd. Cost Rs. 5 Lakh
Expenditure Rs.4.50 Lakh
CODE 2409003008/WH-MIP/66079
Instruction for Job Card Holders in the Back side
of Sign Board
Pre-Execution Sign Board
18
Const. of Check Dam at KarlakutunaKHAPRAKHOL
GRAM PANCHAYATEstd. Cost Rs. 5 Lakh
Expenditure Rs.4.50 Lakh
CODE 2409003008/WH-MIP/66079
Men at Work / During Execution
19
Const. of Hundalduel WHS at ChangriaBAGHMUND
GRAM PANCHAYATEstd. Cost Rs. 10Lakh
Expenditure Rs.8.67 Lakh
CODE 2409003001/WC-WHS/101285
Salient Features of the Project
  • Catchment Area 1.5 Sq. Km.
  • Water Spread Area 3 Hect.
  • Command Area 400 Acres
  • Estimated Mandays 8500
  • The project involves construction of an earth
    embankment of 750 m. long, surpluse and one no.
    outlet with canel to provide flow irrigation to
    400 acres of land in the Kharif season. In
    addition the project will improve soil moisture
    level, ground water table meet domestic needs
    of Villagers of Changria Rengaljuri.

20
Const. of Hundalduel WHS at ChangriaBAGHMUND
GRAM PANCHAYATEstd. Cost Rs. 10Lakh
Expenditure Rs.8.67 Lakh
CODE 2409003001/WC-WHS/101285
Men at Work / During Execution
21
Const. of Hundalduel WHS at ChangriaBAGHMUND
GRAM PANCHAYATEstd. Cost Rs. 10Lakh
Expenditure Rs.8.67 Lakh
CODE 2409003001/WC-WHS/101285
Men at Work Honble Chief Administrator, KBK,
Sri S.Kumar interacting with the job seekers at
work site.
22
  • Const. of Culvert On Chormonda- Suklimundi Road
  • TANKAPANI GRAM PANCHAYATEstd. Cost Rs. 5 Lakh
    Expenditure Rs5.00 Lakh

BRGF 2.50 Lakh, BIJU-KBK 2.50 Lakh
23
  • Const. of Culvert On Chormonda- Suklimundi Road

BRGF 2.50 Lakh, BIJU-KBK 2.50 Lakh
Salient Features of the Project
The Villagers of Chormunda were compelled to
traverse nearly 5 Km. extra to travel to nearest
market place at Lathor and Lakhna. Out of BRGF
BKBK funds a culvert with 3 vents of 4m x 3 m
size has been constructed. As the valley is
relatively flat mat foundation was adopted
instead of costly isolated footings. The project
has successfully carried the flood last year.
Construction of the culvert has significantly
reduced the travelling distance.
24
  • Const. of Culvert On Goelmunda-SarebahalRoad
  • Tankapani GP.
  • Estimated Cost 4.5 Lakh. Exp 4.5 Lakh

BRGF 2.00 Lakh, BIJU-KBK 2.50 Lakh
25
  • Const. of Culvert On Goelmunda-SarebahalRoad
  • Tankapani GP.
  • Estimated Cost 4.5 Lakh. Exp 4.5 Lakh

BRGF 2.00 Lakh, BIJU-KBK 2.50 Lakh
Salient Features of the Project
The BRGF 2.50 Lakh, BIJU-KBK 2.50 Lakh
The Primary School of the village Chormunda is on
the other side of the stream. During rainy season
the children were compelled to cross the ravine
with the help of a dangerous wooden bridge. Out
of BRGF BKBK funds a culvert with 2 vents of 4m
x 3.5 m size has been constructed. Construction
of the culvert has not only provided safe passage
for the students but also reduced length of
travel to nearest district Lakhna by nearly 5.0
Km.