1DOUBLE BARREL GREEN SYSTEM AN EQUIPMENT MEANS
TO PRODUCE WARM MIX By Malcolm Swanson,
P.E. Vice President Engineering Astec, Inc.
2SUSTAINABILITY
- Conserving our resources
- Reducing energy consumption
- Reducing Greenhouse Emissions
- Being more environmentally friendly
- And building a better, long-lasting pavement
3GLOBAL WARMING
4(No Transcript)
5WARM MIX TECHNOLOGIES
- ADDITIVES
- Aspha-Min
- WAM
- Evotherm
- Sasobit
- EQUIPMENT
- Double Barrel Green
6The ASTEC Double Barrel Green System Is An
Equipment Package That Enables The Making Of
Warm Mix By Adding Only Water to the Liquid
Asphalt.
7Outline
- Background and Benefits of Warm Mix
- Equipment Explanation
- Case Studies
- Experience to Date
8Background
- Mix temperatures 50-100F (28 44 C) cooler than
conventional mix methods - Achieved by lowering the viscosity of the AC
binder - Methods additives, additives with water, foaming
with water only, etc. - Foaming first introduced in the 1950s
- High fuel cost and pressure to reduce emissions
make Warm Mix more attractive.
9Benefits of Warm Mix
- Improves mix workability
- Reduces emissions
- Eliminates blue smoke and odor
- Less total emissions
- Improves Comfort safety of workers
- Improves Pavements
- Extends resources via more recycle
- Less fuel
- Increases Plant Capacity
10Improves Workability
11(No Transcript)
12(No Transcript)
13Reduces Emissions
14CONVENTIONAL HOT MIX
WARM MIX
15No Smoke No SmellWhy?
- Light oils are either put in asphalt or
left in asphalt during refining - These light oils boil above 285oF (140 C)
- By mixing at below 285oF (140 C), the boiling
point is never reached eliminating
smoke (vapor) and corresponding smell
16Reduces total emissionsWhy?
- Producing mix at lower temperatures requires
less fuel burning. - The increased ability to use RAP decreases
emissions associated with production of virgin
materials.
17Improved Comfort and Safety of Workers
18No Smoke At Paver No Extreme Temperatures
19Improves Pavements
20Why will we have a Longer Life Pavement?
- Less oxidation of mix
- More uniformity of compaction
- With fractionating RAPbetter control of
gradation
21Extends Resources by Recycling More
22High Percentage Recycle Mix with Standard Grade
of Asphalt
- Two deterrents to running recycle above 20
have been - High Stack Temperature
- Need for a softer virgin liquid to
ensure compaction because of the stiffer
liquid in the RAP -
23Make High Percentage Recycle Mix with Standard
Grade of Asphalt
- To achieve compaction (density)run 275oF
and foam virgin liquid - By using a standard liquid 64-22, you
produce a much softer product than with
virgin mix because - Lower temperature results in less oxidation
- Light oil remains in liquid
- Steam produced from drying the RAP creates an
inert atmosphere
24Uses Less fuel
25Uses Less Fuel
Making Mix at 50 100 F Lower Temperatures than
Traditional HMA Requires 11 to 25 Less Fuel
(Depends on Mix Type and Other Conditions.)
26Increases Plant Production Capacity
27Increases Plant Production Capacity
Lower Exhaust Gas Temperatures and Less Fuel
Burned Take Load Off of the Exhaust System.
28ASTEC Double Barrel Green System Equipment
Explanation
29DOUBLE BARREL GREEN
30The Double Barrel Green System Injects Water
Into Liquid Asphalt.
- Injected At The Rate Of 2 Of The Liquid Asphalt
By Weight - Small Faction Of The Injected Water Becomes
Trapped As Steam Bubbles In The Liquid
Asphalt - The Effect On The Mix Is To Extend The Workable
Temperature Downward to about 212 F (100 C).
31 WATER IS INJECTED INTO THE AC INSIDE THE FOAM
NOZZLE.
32Steam Bubbles Produce Foamed AC.
33?
mm
mm
FOAM EXPANDS THE LIQUID ASPHALT AND INCREASES
FILM THICKNESS
34THE SYSTEM CONSISTS OF WATER TANK AND CONTROL
SKID..
35FOAM UNIT MOUNTED ON DOUBLE BARREL .
36CONTROL SYSTEM
37Junction Box
Water Solenoid Valve
Water Manifold
Water
Hot Oil Out
Hot Oil In
AC
AC Valve (one of nine)
Nozzle Manifold
38LIQUID AC
HOT OIL
WATER
FOAMED AC
39How much water ?
40How Much Water? 2 of liquid AC by weight 2
LBS. of Water for 1 Ton of Mix
41Case StudiesDone by
- National Center for Asphalt Technology
- Created in 1986
- NAPA (National Asphalt Pavement Association)
- Auburn University (Alabama)
- Created to improve pavements
- Test Track
- 17,500 sq. ft.(1626 sq.m) laboratory
42Andrea Kvasnak, PhD
- BS from University of Florida 1999
- MS from University of Vermont 2002
- PhD from Iowa State University 2006
Contact ank0004_at_auburn.edu
www.ncat.us
43Case Study 1
- Completed April 18, 2007
- Three foam mixes (2 H2O to AC)
- 1. Base, 30 RAP
- 2. Surface Coarse, virgin aggregate
- 3. Surface Coarse, 30 RAP
- Two locations at Astec HQ
- Samples taken and tested by National Center for
Asphalt Technology (NCAT)
44Case Study 2
- Completed June 21, 2007
- 50 RAP and PG 64-22 binder
- 3400 ton job
- Location North Terrace Rd, Chattanooga,
Tennessee - Samples taken and tested by National Center for
Asphalt Technology (NCAT)
45Summary Conclusions of Cases 1 and 2
- 1.Coating and mixing of the warm mixes were
equivalent to that expected for conventional hot
mixes. - 2.Workability of the warm mix at 250 F (121 C) to
270 F (132 C) was similar to that of hot mix at
temperatures above 300 F (150 C). -
- contd
46Summary (contd)
3. There was no smoke. 4. There was evidence that
the warm mix was susceptible to stripping. This
has been a characteristic of warm mix in general.
One reason could be that the binder is not aged
during mixing. Potential solutions include using
a harder AC or an anti-strip agent.
47High profile demonstrations
- Southeastern Materials / City of Chattanooga,
3400 tons 50 RAP - Columbia Bit. (Vancouver), 100tons Virgin.
- S.T. Wooten (Sims), 400tons, 20 and 40
- S.T. Wooten (Sims), 400tons, 40
- LoJac (Nashville), 1200tons, Virgin
- Shelly Materials (Columbus), 1200tons, 25
- Boggs Materials (Rock Hill), 1200tons, 50
- Columbia Bit. (Vancouver), 1500tons, 50
- LoJac (Nashville), 500tons, 40
487-26-07 to 7-28-07 Storage Test
- Approximately 50 tons of mix made at 300 tph
with 20 RAP at 138 C. - Stored for 24 hours and checked all normal
- Few tons of mix sold to a private customer.
- No problems. Mix behaved normally.
- Stored for another 24 hours (48 total) and
emptied all normal. -