Former NAS Moffett Field
Overview of Second Five-Year ReviewOperable Unit
(OU) 1
September 13, 2007
2
WHAT IS A 5-YEAR REVIEW?
  • Evaluation of in-place remedy to verify that it
    remains protective of human health and the
    environment
  • Requirement under Comprehensive Environmental
    Response, Compensation, and Liability Act
    (CERCLA)
  • Navy policy is consistent with EPA guidance

3
WHAT IS A 5-YEAR REVIEW? (cont.)
  • 5-Year Review report includes the following
  • Protectiveness determination
  • Documentation of any deficiencies identified
    during the review
  • Recommendations for specific actions to ensure
    that a remedy will be or will continue to be
    protective
  • 5-Year Review process integrates decision
    document information and operational data of
    actions at the site
  • Evaluates implementation and performance of
    selected remedy

4
WHAT IS A 5-YEAR REVIEW? (cont.)
  • Per EPA guidance, the six components of the
    5-Year Review process are
  • Community involvement and notification
  • Document review
  • Data review and analysis
  • Site inspection
  • Interviews
  • Protectiveness determination

5
WHEN IS A 5-YEAR REVIEW REQUIRED?
  • Upon completion of remedial action, hazardous
    substances, pollutants, or contaminants remain
    above levels that allow for unlimited use and
    unrestricted exposure
  • Any Record of Decision signed on or after
    October 17, 1986 effective date of Superfund
    Amendments and Reauthorization Act (SARA)

6
5-YEAR REVIEW TRIGGER
  • Selected remedy will not allow for unlimited use
    and unrestricted exposure
  • Remedial action construction
  • Initiation of construction triggers the 5-Year
    Review clock
  • No remedial action construction (e.g., monitored
    natural
  • attenuation, institutional controls)
  • Record of Decision date is trigger
  • First 5-Year Review completed within five years
  • First OU1 5-Year Review in 2002
  • Subsequent 5-Year reviews completed no later than
    five years after previous 5-Year Review reports

7
FORMER NAS Moffett BASEMAP
8
OPERABLE UNIT 1
  • OU1 consists of Installation Restoration (IR)
    Site 1 Runway Landfill and former IR Site 2 Golf
    Course Landfill
  • Record of Decision signed in August 1997
  • In 1997, approximately 23,000 cubic yards of
    refuse from Site 2 was excavated and consolidated
    with Site 1
  • No further action at Site 2 three years of
    groundwater monitoring completed

9
OU1 REMEDY
  • Major components of OU1 remedy include
  • 12 acre, 2-foot thick, multi-layer, engineered
    cap
  • Groundwater/surface water monitoring (12 wells, 2
    piezometers, 2 trench wells)
  • Landfill gas monitoring (4 wells, 19 gas vents,
    21 perimeter locations)
  • Institutional controls fencing and cap
    disturbance restrictions
  • Inspection/maintenance of vegetative cover, cap,
    monitoring components, pump appurtenances, and
    institutional controls

10
OU1 - SITE 1 LANDFILL
11
OU1 5-YEAR REVIEW SUMMARY
  • Draft Operable Unit 1 2007 Five-Year Review
    Report
  • July 30, 2007
  • Supporting information
  • Groundwater monitoring results
  • Landfill gas monitoring results
  • Maintenance activities
  • Site inspections
  • Conclusion
  • OU1 remedy remains effective and protective of
    human health and the environment

12
  • Questions?