Title: DATE DAQ
1DATE DAQ
Hideyuki Sakamoto 14th October 2008
done
- Installation of DATE package
- Write test code.
- Rebuild trigger logic
- Take data of C1-4 counters with DATE
- Check data.
- Take data of C1-4 and 8 VLSBs.
- Check data with that taken by EXCEL
- Replace code of AFE with EPICS one
- Check data.
- Shift to DAQ test in MLCR(MICE Local Control
Room). - At this step, firmware of VLSB will be updated
with final one.
done
done
done
done
done
done
done today
As soon as tracker will be installed in MICE Hall
2Desktop with all windows (4 4)
1 EPICS server
2 ConfigurationUI
3 RunControlUI
4 Chainsaw Logger
4 status display
1 DATE Logger
3 DAQRUNCONTROL
2 editDb
3Overview of DATE 5 functions for readout at
cosmic-ray test
LO equipment Arm DisArm EventArrived ReadEvent
1 VME Open device Close device
2 AFE Check if configured/ Disable trigger Disable trigger
3 V792N Setup base address Readout
4 VLSBSlave Setup base address Readout
5 VLSBMaster Setup parameters Enable trigger/ Check trigger/ Disable trigger
AsynchReadEvent is not used
4Overview of readout sequence
Delay module
VETO
clock
TTL
Coin.
V977 I/O
VLSB Trig
T560
LVDS
2
MIL1553
EventArrivedVLSBMaster
Enable trigger of AFE/VLSB
1
2
Reset VETO
6
3
Wait until trigger is arrived
ReadEventVLSBSlave
4
Wait until trigger is accepted to AFE
5
Disable trigger of AFE/VLSB
6
Readout VLSB data