Title: Retrieval of damaged truck on Geehi River Aqueduct


1
Retrieval of damaged truck on Geehi River Aqueduct
2
Damaged truck retrieval
  • The damaged vehicle is situated on the Geehi
    river Aqueduct between Andersons Spur and Snake
    Creek ( CH 25809 ).
  • The vehicle is thirty meters from the access road
    on a 1 1 slope with larger trees (20 meters )
    and extensive ground cover.
  • The access track is narrow and has a aqueduct
    running on the top side.
  • The aqueduct is currently in service and will
    remain in service throughout the recovery.

3
Site Access
  • Retrieval contractor is under the control of SHL
    whilst mobilising, demobilising and during the
    plant setup.
  • Retrieval contractor is under the control of SHL
    when entering from Alpine Way and exiting to the
    Alpine Way.
  • Retrieval contractor will be under escort at all
    times.
  • Olsens Road load limit
  • A qualified engineer will escort the heavy
    vehicles passing the slip sites on Olsens to
    monitor the ground conditions. No heavy vehicles
    are to access these sites until authorised to do
    so.

4
Salvage Contractor
  • Wagga towing have been on a site inspection and
    have submitted a retrieval plan.
  • Wagga Towing are available at short notice and
    are ready to retrieve the vehicle when road
    conditions are suitable.
  • Wagga towing have 8 heavy recovery vehicles and
    numerous light tow vehicles.
  • Wagga towing hold contracts with Emergency
    Services, Police and Dept of Commerce for heavy
    towing from Narooma to northern NSW and inland to
    Wagga.
  • Wagga towing have previously recovered in the
    area including a 30 Ton profiler that slipped of
    the road near Tumut Ponds Dam on KNP 5.
  • Wagga Towing sub contract to ISS First Response.
    ISS are a Australia wide towing company. (
    reference received ).

5
Wagga Towing
6
PlantHeavy Recovery Vehicle Mack Titan
2007Winches 2 x 80 Ton, 2 x 15 Ton, Rotating
boom, rear spade anchors
7
Pozitrack loader, 10 Ton, spade anchor, 10 Ton
Hydraulic winch
8
Setup Plan
9
Setup
  • Heavy recovery vehicle will be positioned as
    close as possible to Aqueduct.
  • Qualified engineer to check ground conditions
    before recovery vehicle is positioned.
  • SHL will provide the personnel to provide safe
    access to allow contractor to secure winch lines
    and chains to damaged vehicle.
  • SHL to provide environmental controls, spill
    kits, fuel drums etc.
  • Winch lines 1 2 will ( red ) will be secured to
    the left and right hand side of the damaged
    vehicle chassis.
  • Winch line 3 ( Green ) will be secured to the tow
    bar on the damaged vehicle as a safety line and
    will be kept taught at all times.
  • Winch line 4 ( Blue ) will be attached between
    the damaged vehicle and the Pozitrack loader to
    stabilise the vehicle horizontally and winch the
    vehicle away from obstacles.
  • All connections to the damaged vehicle are to be
    secured to separate points, no two cables are to
    connect in the same position.
  • All connecting chains will be 12mm grade 100.

10
Methodology
  • Salvage contractor will be in control of site
    after setup is complete
  • Winch lines 1 2 ( Red ) will be used to steer
    and winch the damaged vehicle to the access track
  • Winch line 3 ( Green ) will be a safety line and
    will be kept taught.
  • Winch line 4 ( Blue ) will be used to
    horizontally stabilise the damaged vehicle whilst
    being winched and to winch the vehicle away from
    obstacles.
  • After damaged vehicle has been winched onto the
    access track, lines 1 2 are to be released and
    secured to lifting straps to allow the vehicle to
    be lifted on to a flat top truck. Line 3 is to
    remain secured until the damaged vehicle is
    secured on the flat top truck.
  • Contractor to hand control back to SHL.
  • Contractor to demobilise.

11
Environmental
  • Damaged vehicle to be checked before and during
    recovery for any fuel or oil leaks.
  • Spill kits on site and ready for use.
  • Containers on site to remove fuel from vehicle if
    necessary.
  • Vehicle to be winched so as to cause minimum
    damage to ground cover and trees.

12
Safety
  • A work method statement will be developed for the
    works.
  • The Recovery contractor will control the site
    whilst the recovery is in progress.
  • SHL personnel are to abide to the contractors
    requirements whilst the recovery is in progress.
  • A site assessment will be undertaken on the
    morning of the works. and the SWMS adjusted if
    necessary.
  • Work steps are to follow the SWMS.
  • SHL will take control of the site when vehicle is
    recovered.

13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com