Quality Control Tests of DJCs
  • Continuity and shorts test
  • Resistance testing
  • High voltage standoff testing.
  • LaTech Testing Crew
  • Moreshwar Dhole
  • Qun Yu
  • Matthew Bellot
  • Henry Hollins

3
Since our last report
  • Updated and improved our database to reflect
    changes suggested last time and to include
    results of recent testing
  • Received 168 50cm-test cables from Century
  • Commenced affixing backings to cables as per
    procedure from Jim Fast
  • In parallel, 80 of these have been tested

4
  • On the following slide are sample data from
    SHEET 1 of the DJC database (http//caps.phys.late
    ch.edu/greenw/run2b/run2b_page.html)

5
(No Transcript)
6
  • Also on the DJC database spreadsheet is SHEET 2
    which has resistance measurements, mean
    resistances and standard deviations. Part of this
    sheet is on the next slide..

7
(No Transcript)
8
Some Observations
  • We have tested 125 Century cables.
  • Of these, 10 cables have some type of defect-
    shorts between lines, discontinuity, or high
    resistance. Shorts are the most common of these.

9
  • END OF REPORT

10
  • EXTRA SLIDES

11
Digital Jumper Cable Readout Setup
12
3) High Voltage Standoff Test
  • The purpose of this test is to check whether
    there is any short or current leakage (Arcing)
    between HV (High Voltage) Cu trace and other
    adjacent Cu traces.
  • For this testing here at LaTech we developed our
    own High Voltage Testing Jig and it is working
    fine.
  • This High Voltage Testing Jig allows us to test
    10 cables at a time for overnight.

13
Test procedure
  • Continuity two multimeter probes are connected
    to both ends of the line in a given cable, if the
    line is good, there will be beep from
    multimeter.
  • Short circuit tests each line is tested against
    its nearest neighbor.

14