Title: Status
1Status Plans of the CBM-MPD STS CONSORTIUM
- Yuri Murin for the CBM STS Consortium
- JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP
(ITEP)-GSI
2Task sharing
- Leading organization, assembling and QA including
in-beam tests
Assembling of modules and in-beam tests
Microcables, assembling of modules
Ultra light carbon fiber support and cooling,
radiation test center
Double sided microstrip sensors and their QA
FEE and sensitive material supplies
Cooling system design and prototyping
3The base ingredients for success
Cooperation within IBM
- IBMIgolkinBorshchovMerkin
Access to Radiation Test and in-beam test
Facility
Access to Russian funding
Recruiting of creative young people
4On the Road to CBM STS
52008 Tasks and their sharing
- Technical design and production of CF support and
cooling elements _at_SPbSU KRI - Igolkins talk
- Establishing DSSDs production line _at_ SINP ELMA
Merkins talk - - Development of n-irradiation site _at_KRI 20 MeV
cyclotron - Murins (Jakovlev-Lashaev) talk
- Upgrading prototypes testing bench with
collimated Ru-106 betas _at_ JINR - Organizing the in-beam testing site _at_ Protvino
- Development of microcables prototypes _at_ Kharkov
- Procenkos talk
- Development of assembling site _at_ Russia (Protvino
or/and Dubna) - Application for budgeting
- Networking _at_ JINR or ITEP
6Technical design and production of CF support and
cooling elements _at_SPbSU KRI ( S.N. Igolkin)
Details are in Sergey Igolkins talk
7Establishing DSSDs production line _at_ SINP
ELMA( M.M. Merkin)
Details are in Michael Merkins talk
8Development of n-irradiation testing site _at_KRI 20
MeV cyclotron (V.A. Jakovlev, S.I.Lashaev
(KRI)D.E.Karmanov, M.G.Korolev(SINP) supported
by KRI Cyclotron Lab )
Equipment is purchased and implementedNeutron
field studies done but need to be confirmedFirst
batch of one sided pad diods were irradiated and
analysed
9Building Prototypes testing bench with Ru-106
betas _at_ JINR ( P.V. Nomokonov)
Current Activity Preparation of infrastucture
and transition to N-xyter electronics and
DAQ Auxiliary electronics for demonstrator tests
in 2009 on the way
URGENT NEED n-XITER FEE electronics
demonstrators
10Organizing the in-beam testing site _at_ Protvino
SVD-2 setup at IHEP/ 50 GeV protons with
intensity up to 106/ spill
First run with Demonstrator-Zero-B is scheduled
for 19.11-1.12.2008 final preparations are on
the way
11Development of microcables prototypes _at_ Kharkov
( V.N. Borshchov )
Demonstrator-Zero-B talk of M.Procenko
12 Development of assembling site _at_ Russia
(Protvino or Dubna or ?)
The next Step visiting existing ALICE
assembling sites at Strassburg (done) and/or
Utrecht ( rescheduled for 2009)
To improve networking in FSU countries
participating institutes (Skype to every member
organization !)
Application for the support of the 3-d Work
Meeting of the Consortium (together with MVD ?)
in Sortavala, Karelia, June 1-4th,2009 (ready)
13 Milestones of the 2009 Work plan
Demonstrator 1A (technological) 1-B (electrical)
1-C (final) Description Three 1024 strip sensors
connected serially short Al cable with pitch
adapter
Demonstrator 2A (technological) 2-B (electrical)
2-C (final) Description One 1024 strip sensor
long Al cable with pitch adapter
Ladder Demonstrator Description full scale
mechanical dummy of the 4-th STS station
(noncentral!)
Cooling Scheme Demonstrator ?
In-Beam test time table ?
In-Beam test time table for 2009 ?
(Protvino(April) Nuclotron (?) GSI(?))
Urgent need Hybrid input pitch ?
14Thank you for your attention!