Albert Young - PowerPoint PPT Presentation

About This Presentation
Title:

Albert Young

Description:

... narrow plan for effective daylighting, ... surveys Identifying energy savings ... low energy design ethos for the building and have made ... – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 20
Provided by: MaryW162
Category:

less

Transcript and Presenter's Notes

Title: Albert Young


1
Case Studies
Albert Young University of Glasgow Allan Crooks
Carbon Trust
2
Glasgow Background
  • 25,000 people, diverse buildings portfolio
  • Research led institution with an annual turnover
    of 300m
  • Annual utilities cost - 5m
  • Power prices have doubled after being fixed for 4
    yrs
  • 50 green power - CO2 reduced by 10,000Tpa
  • Energy efficiency accredited

3
Carbon Trust Service Delivery
  • Providing support through specialist advice and
    consultancy services
  • Areas of support focused on
  • Design advice for capital projects
  • 3 new buildings presented opportunities to make
    use of the Carbon Trust service
  • BRE appointed as advisors to all 3 projects
  • Energy efficiency services in other areas
  • Providing surveys on the built environment
  • Identify technical solutions to carbon saving
    opportunities

4
Energy Efficiency Services
  • Examples of the work done
  • Free Energy efficiency surveys
  • Identifying energy savings opportunities in space
    heating, lighting, controls etc
  • Analyses of aerial thermal image heat loss survey
    results
  • Survey of hot spot properties - loft insulation
    upgraded from 50mm to 150mm
  • Cooling of new IT server room
  • Free cooling - use air cooled batteries to cool
    the chilled water
  • Update of energy conservation specification
  • Incorporated into project briefing docs
  • Biomass boiler pre-feasibility
  • Ratification of energy conservation investments
  • Seeking recognition within EU-ETS for previous
    investments

5
Proposed Energy Conservation Projects
6
Rowardennan Marine Biology Research Station
  • Built on the shores of Loch Lomond
  • Phase 1 is to replace existing facilities and
    provide first class research facilities
  • Brief to exceed environmental good practice and
    create a building with low running costs and low
    Carbon emissions
  • Passive energy design strategy specified for the
    building - narrow plan for effective
    daylighting, passive ventilation, selection of
    high thermal mass materials etc
  • Adopted BREEAM environmental assessments
  • Detailed assessment of a broad range of

    environmental topics

7
Design Advice Service
  • The Carbon Trust funded a comprehensive energy
    review of the design
  • BRE was commissioned to
  • Provide advice to design team and client with
    regard to the options for sustainable energy
    sources
  • Complete a passive design strategy analyses
  • Based on the stage D report, this covered - the
    design intent, the site,design approach and
    materials.
  • Define a set of performance targets for the
    building

8
Design Advice Outcome
  • Options for sustainability
  • Micro hydro power, wind, biomass and ground
    source heat pump were reviewed recommending a
    GSHP (closed loop borehole option)
  • Hydro electricity investigations ongoing
  • Passive design strategy analyses
  • Confirmed that good environmental practice was
    being followed with regard to passive design of
    the building.
  • Assessment of environmental targets for the
    building
  • The building is set to exceed good practice by
    19 and be 45 more efficient than a comparable
    academic building

9
Technical Report Steam Systems
10
Technical Report Steam Systems
11
Technical Report Steam Systems
12
Technical Report Steam Systems
13
Technical Advice
14
Insulation savings
  • Recommendations
  • Fit insulation to pipes and valves
  • Savings 111.5MWh, 2,600 pa
  • 22 tCO2 Reduction pa

15
Infrared Thermography
16
Plate Heat Exchangers
17
Lighting Study
18
Lighting Study
  • Lighting 40 of Elec. consumption
  • Savings 5,625MWh, 180,000 pa
  • 2418 tCO2 Reduction pa
  • Recommendations
  • Lamp replacement
  • New Fittings
  • Improved control
  • Improved maintenance