DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle

Description:

Title: CENE 476W Author: ITS Last modified by: Engineering User Created Date: 11/12/2006 11:02:50 PM Document presentation format: On-screen Show Company – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 15
Provided by: ITS8345
Learn more at: https://ceias.nau.edu
Category:

less

Transcript and Presenter's Notes

Title: DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle


1
DCS SolutionsDon JacksonChen Kiat Yong Sarah
Doyle
  • Constructed Wetland Design at Sipaulovi Village

2
DCS SolutionsWho are we?
  • Don Jackson Team Leader
  • Main client contact
  • Design research
  • Chen Kiat Yong
  • Main design research
  • Permitting regulations
  • Sarah Doyle
  • Main drafter
  • Design research
  • Deliverable editing

3
Objective
  • To design a centralized wastewater treatment
    system to meet current and future demand for the
    Village of Sipaulovi.

4
External Consultants
  • George Mase
  • Main Tribal Contact
  • Community Services Administrator
  • John Mead
  • Wastewater Technical Specialist
  • Institute for Tribal Environmental Professionals
  • Suzanne Jamison
  • Liaison for DCS and Hopi Tribe
  • Paul Gremillion, P.E.
  • N.A.U Professor, Civil Environmental Department
  • Christine Laguna, P.E.
  • Grading Drainage Specialist
  • CAD advisor
  • Jason Nieto
  • Certified Plant Operator
  • Sipaulovi Lagoons
  • Erika Schoen, E.I.T.
  • Environmental Engineer
  • Indian Health Service

5
Introduction
  • Problems with current system
  • Future growth population may double
  • Projected calculations in Microsoft Excel
  • Odors from existing facility
  • No central sewer system

6
Sipaulovi Village
Proposed site
7
(No Transcript)
8
Aerial photo
9
(No Transcript)
10
(No Transcript)
11
What does the client want?
  • Centralized WWTS for current and future users
  • Prefers Constructed Wetland Design
  • Wants to reuse effluent for non-edible crops
    (gourds, livestock fodder, etc)
  • Trees
  • Would like to attract birds and other wildlife

12
Design phases
  • 30 design proposal (completed)
  • Includes research of design alternatives
  • 60 design proposal (pending)
  • Will be completed by April 6
  • After 60 design proposal is completed, client
    representative (George Mase) will be consulted to
    select final design
  • 90 design proposal (to be completed)
  • Includes engineers construction cost estimates
  • 100 design proposal
  • To be completed by April 20th
  • Capstone presentation April 27th

13
Design Elements
  • Transport (not in scope of project)
  • Flow equalization/settling tank
  • Bar screen
  • Flow meter (requires electricity)
  • Pump (requires electricity)
  • Pressure sewer Gravity sewer
  • Primary Treatment System
  • Oswald system OR lagoon
  • Lined or unlined
  • Secondary Treatment System
  • Constructed wetland (Oswald only)
  • Non-discharging OR effluent reuse

14
Questions?Comments?Suggestions?