Title: DAMAGE PREVENTION


1
DAMAGE PREVENTION
  • Stopping underground
  • facility damages before
  • an incident or explosion.
  • Establish Standard Operating Procedures (SOPs)
    for damage prevention.

2
Objective
  • Prevent excavators who do not have a mark-out
    request from excavating until the underground
    facilities are marked.

3
Verify the mark-out request
  • The underground facilities should be marked in
    the area where the excavating is occurring with
    the appropriate paint, flags and or stakes
    according to the law (Underground facility
    Protection Act).

4
Verify valid mark-out request
  • When excavation activity is observed
  • Large construction equipment
  • Post hole diggers
  • Hand excavation including planting trees / shrubs
  • Or any other type of excavation
  • Observe if paint or colored flags are marking the
    underground facilities in the area of excavation
  • If not, inquire with the excavator if they have a
    valid mark-out request and what their request
    number is.
  • The request number is 9-digits long with the
    first two numbers representing the year (example
    050321010)
  • If there are no marks the excavator does not
    have a mark-out request, have the excavator stop
    excavating.

5
No valid request
  • Have the excavator stop excavating immediately.
  • Notify the New Jersey Board of Public Utilities
    OneCall Enforcement group, OSHA, or your local
    utility.
  • BPU contact number 973.667.3204
  • OSHA
  • Essex, Hudson, Morris, Sussex (973) 263-1003
  • Bergen, Passaic (201) 288-1700
  • Hunterdon, Middlesex, Somerset, Union, Warren
  • (732) 750-3270
  • Atlantic, Burlington, Camden, Cape May,
    Cumberland, Gloucester, Mercer, Monmouth, Ocean,
    Salem
  • (856) 757-5181

6
Failing to have a mark-out request
  • Can result in death, injuries, and / or property
    damage. The picture below was the result of an
    excavator failing to request that underground
    facilities be marked. Three people were killed.

7
Failing to have a mark-out for the work area
  • You may find an excavator working beyond the area
    they requested to be marked. This can also result
    in death, injuries property damage.

8
You can prevent underground facility damages
  • Your action to stop illegal excavations that
    endanger public safety can prevent serious
    incidents from occurring.

9
Protect the Public
  • Establish damage prevention SOPs for police,
    building parking inspectors, fire department
  • For additional information call NJ Board of
    Public Utilities One-Call Enforcement Group.
  • For the law or a copy of the Underground Facility
    Protection Act
  • NJSA 482-73 through NJSA 482-91
  • NJAC142-1.1 through NJAC 142-6.4
  • OSHA Federal Regulation 1926.651
  • (go to (http//www.state.nj.us/bpu/wwwroot/servi
    ceeval/handbook.pdf )