Project%20Recovery%20in%2048%20Hours%20An%20Application%20of%20TOC - PowerPoint PPT Presentation

About This Presentation
Title:

Project%20Recovery%20in%2048%20Hours%20An%20Application%20of%20TOC

Description:

Title: PowerPoint Presentation Author: Cosklo, Ron Last modified by: Cosklo, Ron Document presentation format: On-screen Show (4:3) Other titles: Times New Roman ... – PowerPoint PPT presentation

Number of Views:103
Avg rating:3.0/5.0
Slides: 19
Provided by: Cosk150
Category:

less

Transcript and Presenter's Notes

Title: Project%20Recovery%20in%2048%20Hours%20An%20Application%20of%20TOC


1

JVG Consulting Inc. Value Based Consulting
Guaranteed ROI
Project Recovery in 48 HoursAn Application of
TOC John Gardner, CMC Managing Partner
2
Introduction
  • John Gardner, CMC
  • Managing Partner, JVG Consulting Inc.
  • Practice Leader, Deloitte
  • Interim CIO Economical Insurance
  • Assistant Director, PriceWaterhouseCoopers
  • Assistant Director, DMR Consulting Group

3
Agenda
  • Background Context
  • Premise
  • Overview
  • Diagnostic Maps
  • Feature Cases
  • Measurements
  • Breakout Session Goal Map
  • Breakout Session Problem Map
  • Breakout Session Feature Case Map
  • Breakout Session Sizing
  • Breakout Session Action Plan

4
Background Context
  • 85 of Projects are
  • Late
  • Over-budget
  • Ship with reduced functionality
  • Defect Rates are 53 with
  • 11 Severity 1
  • 14 Severity 2

5
Premise
  • Your project is in crisis
  • Management wants to save it
  • You are prepared to change

6
Overview
  • TOC is a method that integrates several
    disciplines into a holistic, unified framework
  • TOC simplifies and extends the Theory of
    Constraints with Statistical Process Control,
    Object Oriented Analysis, Function Point Analysis
    and Agile methods
  • TOC implements a set of key measurements that
    significantly improves management control

7
Overview Continued
Theory of Constraints (TOC) 30 years
Object Oriented Analysis (OOA) 30 years
Function Point Analysis (FPA) 30 years
Statistical Process Control (SPC) 80 years
Agile (Scrum/FDD) 10 years
8
Overview Continued
  • TOC applies the following steps for a Project
    Turnaround
  • Identify the Project Goal and Conditions
  • Identify the Undesired Effects (UDE)
  • Identify the Necessary Conditions (NC) for each
    UDE (3 5) x 5 Why
  • Identify the Core Problems (3 5)
  • Identify Feature Cases (5 7) x 5 Why
  • Size the Change
  • Create Action Plan
  • Execute

9
Diagnostic Maps
  • One or more types of maps may be created during a
    TOC engagement
  • Situation Map
  • Goal Map
  • Problem Map
  • Conflict Map
  • Solution Map
  • Feature Case Map

10
Feature Cases
  • An extension to traditional business use cases
    and system uses
  • Feature cases are truly object oriented
  • Feature cases document process and data
  • Feature case descriptions are rigorous
  • Feature cases can be used as a development
    specification

11
Measurements
  • Only a handful of key measurements are required
    to implement full management control on a
    project
  • ROI, T, I, OE
  • Size, Demand, Capacity, WIP, DIP and RIP
  • Delivery Rate (DR)

12
Breakout Session Goal Map
  • Review the Case Study
  • Identify the Goals
  • Identify the Necessary Conditions
  • Build the Goal Map
  • 10 minutes

13
Breakout Session Problem Map
  • Review the Case Study
  • Identify the UDEs
  • Identify the Necessary Conditions
  • Build the Problem Map
  • 10 minutes
  • Discussion about Conflict Maps

14
Breakout Session Feature Case Map
  • Review the Case Study
  • Identify the Feature Cases
  • Business
  • Technical / System
  • Build the Feature Case Map
  • 10 minutes
  • Discussion about Feature Cases

15
Breakout Session Sizing
  • Review the Case Study
  • Review the Feature Case Map
  • Perform the Feature Count
  • 10 minutes
  • Discussion about Measurements

16
Breakout Session Action Plan
  • Review the Case Study
  • Review all Maps
  • Group and sort Feature Cases by Value
  • Build Action Plan Monthly Delivery
  • 10 minutes
  • Discussion

17
A Standing Offer
  • Project Intervention
  • Establish Goal Problem Maps
  • Resolve Conflicts
  • Create Action Plan
  • Service provides guaranteed ROI

18
Contact Information
  • John Gardner, CMC
  • Managing Partner
  • JVG Consulting Inc.
  • John.Gardner_at_jvgconsulting.ca
  • 905-933-7607
Write a Comment
User Comments (0)
About PowerShow.com