Modification Proposal 0273 Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements Richard Fairholme, E.ON UK – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 9
Provided by: R755
Category:

less

Transcript and Presenter's Notes

Title: Richard Fairholme, E.ON UK


1
Modification Proposal 0273 Governance of
Feasibility Study Requests to Support Changes to
Network Exit Agreements
  • Richard Fairholme, E.ON UK

2
What does the Modification Proposal cover?
  • Feasibility / engineering studies conducted by
    Transporter to analyse impact of request by
    Shipper to changes to, or application for, a
    Network Exit Agreement (NExA) (e.g. increase to
    ramp rate / max. gas offtake rate).
  • Shippers request (and fund) such studies from
    National Grid NTS / DNs.
  • Can only move to formally agreeing (change to)
    NExA once engineering study process complete.

3
The Current Feasibility Study Headache
How much will it cost?
Delays bringing on new generation plant or
capability
How long will it take?
Delays in meeting increased IC customer gas
demand
Delays in bringing gas storage to market
How many studies will I need?
4
(No Transcript)
5
What is Proposed?
  • To support NExA applications / modification
    applications, it is proposed that
  • A standard application form to be used for
    submitting requests by Shippers.
  • A standard set of terms and conditions where
    studies required to be made available by the
    Transporter(s).
  • Fixed (or variable) costs for different
    categories of applications - varying according
    to size, type and location of project.
  • Study supporting NExA change application to be
    completed within 3 months. If required, any
    additional studies to be completed within a
    further 3 months (i.e. a maximum of 6 months in
    total).
  • Expected to apply to both National Grid NTS and
    the Gas Distribution Network Operators (above 7
    barg connections).

6
What is NOT Proposed?
  • Any amendment to existing Siteworks process for
    connections to DNs.
  • - Covers connections less than 7 barg.

7
Benefits for Shippers of this Proposed New Process
  • Less time spent negotiating with the
    Transporter.
  • Able to bring projects to the market more
    quickly.
  • Better able to plan projects able to make
    more efficient decisions.
  • Similarity to CUSC arrangements in electricity
    should make process easier to understand
    (particularly for new entrants).
  • Ensures all Shippers are treated equally.
  • Overall, less Shipper FTE requirement for
    progressing NExA applications / modification
    applications.

8
  • Any Questions / Comments?
Write a Comment
User Comments (0)
About PowerShow.com