OHIO River-Net - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

OHIO River-Net

Description:

Title: OHIO River-Net Author: sungjuc Last modified by: Cheryll Cranmer Created Date: 7/11/2006 4:33:33 PM Document presentation format: On-screen Show – PowerPoint PPT presentation

Number of Views:72
Avg rating:3.0/5.0
Slides: 15
Provided by: sungj150
Category:
Tags: ohio | fleet | net | river | utilization

less

Transcript and Presenter's Notes

Title: OHIO River-Net


1
OHIO River-Net
  • Objectives
  • Proposed Network
  • European RIS Example
  • Project Plan

2
Objectives
1
2
3
4
Network infrastructure specification
Potential business applications
ROI analysis
Computer simulations of the most important
applications
2
3
Understanding Players
USCG
USACE
OHIO RIS
PPC
Barge Lines
Terminal Operators
Shippers/ Receivers
4
Proposed Network
5
European RIS Features
Fairway Information Services
Waterway Charges Dues
Traffic Management
Cargo Management
Calamity Abatement Service
Port Terminal Management
6
RIS Features
  • Fairway Information Services
  • Provide information about the use and status of
    the inland waterway infrastructure
  • Support strategic navigation decision-making
    (plan and monitor a trip).
  • Target User Barge lines

7
RIS Features
  • Traffic Information and Management Services
  • Strategic/tactical traffic information
  • Waterway administration for safe navigation
  • Vessel Traffic Service (VTS)
  • Accidents prevention by means of shore based
    monitoring
  • Lock and Bridge Planning
  • Reduction of waiting time and smoothing of the
    traffic flow
  • Target User Barge Lines, USCG

8
RIS Features
  • Calamity Abatement Service
  • Register vessels at the beginning of each trip
    and update data during the voyage
  • In case of accident, immediate and expedited
    measures to rescue the vessels thanks to the data
  • Target User Barge Lines, USCG

9
RIS Features
  • Port and Terminal Management
  • ETA( Estimated Time of Arrival) information of
    approaching vessels supports the overall terminal
    utilization and smooth passage of vessels
  • Reduction for transshipment time
  • In case of insufficient terminal capacities, the
    terminal operator inform his Requested Time of
    Arrival (RTA).
  • Target User Barge Lines, Terminal Operator

10
RIS Features
  • Cargo and Fleet Management
  • Detailed information on the cargo transported
  • Information on the vessels and the fleet
  • Target User Barge Lines, USACE

11
RIS Features
  • Waterway Infrastructure Charges and Harbor Dues
  • Use of voyage data to automatically calculate
    charge and initiate invoicing procedures
  • Target User Government

12
Project Plan
Post Demo Review
Demo
ROI
Identify Business Services
Design Network Infra.
Requirement Analysis
Scope Definition
13
CMU River-Net Project Member List
Name Name (Eng) Cell Phone Email
Sunkyung Park Sunny 412 310 2305 sunkyung_at_andrew.cmu.edu
Sungju Cho Joe 412 335 9713 sungjuc_at_andrew.cmu.edu
Yunsuh Chun Yun 412 848 6918 ychun_at_andrew.cmu.edu
Hyeon Yu Shawn 412 719 6054 hyeony_at_andrew.cmu.edu
Hyunsu Jun Sue 412 841 1849 hyunsuj_at_andrew.cmu.edu
Yi-Chan Ho Yi-Chan 347 249 7658 yichanh_at_andrew.cmu.edu
14
Thank You !
  • QA
Write a Comment
User Comments (0)
About PowerShow.com