Title: Space Segment


1
Preliminary Satellite in flight status
2
Satellite activities
  • Satellite main activities performed since
    separation
  • First acquisition in stowed configuration
  • Deployment of the PLM and 2nd SHM in deployed
    configuration
  • NOM/NOM acquisition
  • Gyro and thrusters calibration
  • OCM in plane and out of plane
  • Switch on of redundant equipment ( GYRO3, STR2)
  • inertial and zenith ECM

3
Preliminary Functional chain status
  • Elctrical
  • Power consumption as expected including PLM
    (actual comparison to be performed on 21/12 for
    PLM heater ( worst case of eclipse))
  • Eclipse and shadowing as expected
  • Battery management OK optimisation of internal
    resistance to be evaluated and tested before end
    of the year
  • Thermal
  • PF CTA behaves as expected and temperature are
    well controlled
  • Coupling between S/A and PLM arms under analysis
  • In SHM configuration high temperature noticed on
    S/A due to probable specular reflexion on PLM
    arms
  • In NOM configuration, low impact for all the SADM
    position
  • Modelisation on going in TAS

4
Preliminary Functional chain status
  • AOCS
  • Nominal behaviour
  • Equipment status nominal including redundant
    equipment
  • Command/ control
  • Nominal
  • Use of memory read between two addresses to
    recover TM
  • R/F
  • Occultation of S-Band signal by PLM as expected

5
Satellite Ground monitoring
  • On ground monitoring
  • Update of the SMOS ground monitoring very few
    modifications
  • Yellow and red alarms threshold for PLM
    temperature, current, SL consumption
  • Update of the documentation on expected alarms
  • New SDB to be released by end of CW50
  • Monthly report
  • Number of cycling of IHTSN/IHTSR added

6
Conclusion
  • The satellite behaves as expected, no anomaly
    noticed so far