Transcript and Presenter's Notes

Title: JASON2 Status in NOAA


1
JASON2 Status in NOAA
  • Gary Petti
  • Office of Satellite Data Processing and
    Distribution

2
JASON2 Mission
  • 4-party Agreement between NOAA, NASA (JPL), CNES,
    and EUMETSAT Identifies Roles and
    Responsibilities (in an MOU)
  • NOAA
  • Command and Control of Satellite
  • Wallops Fairbanks CDA Ground Stations
  • Operational Data Processing
  • Operational Offline Data Distribution
  • Archive
  • EUMETSAT
  • Usingen Ground Station
  • Operational Data Processing
  • Operational Data Distribution
  • CNES
  • PROTEUS Satellite Bus
  • Command and Control of Satellite
  • (before handover to NOAA)
  • Poseidon-3 Altimeter
  • DORIS orbit determination system
  • Science Data Processing
  • Offline Data Distribution

3
JASON2 Sensors
  • CNES
  • Poseidon-3 (C and KU Band) Dual Frequency RADAR
    Altimeter
  • DORIS Doppler Orbitography and
    Radiopositioning Integrated by Satellite
  • T2L2 Time Transfer by Laser Links Compare
    distant clocks and aid in characterization of
    DORIS noise
  • LPT Light Particles Telescope (Japan)
    Radiation in Satellite Environment
  • Carmen-2 Environment Characterization and
    Modelization Radiation in the Satellite
    Environment
  • NASA
  • AMR Advanced Microwave Radiometer
  • LRA LASER Retroreflector Array
  • GPSP Global Positioning System Payload

4
JASON2 Status
  • Launch Scheduled for June 15 2008 from Vandenberg
  • NOAA
  • Command and Control In place
  • Operational Data Processing Under development
  • Operational Distribution Under development
  • Archive by CLASS Initial support testing begin
    Jan. 2008
  • EUMETSAT
  • Operational Data Processing Under development
  • Operational Distribution Under development
  • CNES
  • Poseidon Altimeter Completed, Mated to S/C
  • Science Data Processing System Under development
  • Payload instrument integration occurred December
    2006 June 2007
  • Satellite assembly, integration, test June 2007
    to January 2008
  • NASA (JPL)
  • AMR Completed Mated to S/C
  • Launch Services (Delta ll 7320) Scheduled

5
JASON2 Products
  • Operational Geophysical Data Record (OGDR)
  • Produced by NOAA and EUMETSAT within 3 hours of
    observation
  • Native NetCDF format as well as OGDR-BUFR format
  • Operational Distribution from DDS
  • Orbit computed onboard from DORIS to 10 cm
  • Ground contact based files (products)
  • Interim Geophysical Data Record (IGDR)
  • Produced by CNES within 1-2 days
  • Segmented by passes (half orbital revs)
  • NetCDF format
  • 2.5 cm orbit accuracy
  • Geophysical Data Record (GDR)
  • Produced by CNES within 60 days
  • Cycle (10-days) based pass segmented
  • NetCDF format
  • 1.5 cm precise orbit
  • O/I/GDR Contents
  • Sea Surface Height
  • Wind speed

6
JASON2 Schedule
  • Launch June 15, 2008 from Vandenberg
  • 1 month Orbit Acquisition instrument checkout
  • Cycle 1 begins July 16, 2008
  • 5 months NRT Verification
  • NRT Data Distribution by NOAA EUM begins Dec,
    2008
  • Do operational users want first 5 months of the
    NRT data reprocessed with final
    algorithms/software?
  • 5 more months Offline Verification
  • Offline data Distribution May 2009
  • Project begins using final algorithms at this
    time