feasibility and review of housing plan for KUWAIT
100
2(No Transcript)
3KUWAIT 100
Feasibility and Review of Housing Plan
prepared for
NXUBA LOCAL MUNICIPALITY Private Bag X350,
Adelaide, 5760 Tel (046) 684-0034 Fax (046)
684-1931
by
March 2014
4(No Transcript)
5- 2.1 INTRODUCTION
- 2.1.2 Purpose of the Report
- 2.1.2 Background of this Report
- 2.1.3 Terms of Reference
- 2.1.4 Background to Settlement
- 2.2 Status of Housing Project and Waiting List
- 2.3 Land Identification and Ownership
- 2.4 Engineering
- 2.5 Environment
- 2.6 Geo-tech
- 2.7 Distribution of Social Facilities
- 2.8 Current Spatial Development Framework
- 2.9 Future Plans of Other Sector Departments
- 2.10 Approval by Council
- 2.11 Summary and Recommendations
- LIST OF FIGURES
- Figure 2.1 .1 Locality Plan
- Figure 2.1.2 Aerial Photograph
LIST OF ANNEXURES Annexure 1 Ownership Annexure
2 Title Deed Annexure 3 Surveyor General
diagram
6- GLOSSARY
- Informal Site A Site occupied by a household or
to which a household has customary rights, e.g.
Permission to occupy (PTO, no longer formally in
use) or community agreement via a meeting of
elders including headman or chief. - Formal Site A site occupied by a household or to
which a household is entitled to have a
registered right recorded at the Deeds Registry
with a title deed and surveyors diagram and/or
registered General Plan. However, in many
instances title deeds have not been issued nor
ownership registered. - In-Situ upgrade project Formalising of tenure
and installation of services and possibly also
construction of a subsidised dwelling on land on
which people are already living. Generally refers
to a project larger than one unit. - Greenfields project New project site which there
has been no formal or informal settlement,
industry, infrastructure to date. Project sites
are often outside of existing urban development. - Infill Project New project site within existing
urban development usually on under utilised or
vacant land and which often can help to promote
physical integration between spatially isolated
parts of the settlement. - Rectification projects Repair or rebuilding of
defective existing houses built through one or
other government housing program. - Erven The plural of erf meaning plots of land
each registered as an erf in a deeds registry
and forming part of a registered General Plan. - Plots The plural of plot meaning unregistered
pieces of land informally laid out. - Portion A plot of land forming part of a
proposed or approved (by LM Council) subdivision
layout but which has not yet been registered by
the Surveyor General as a general plan and for
which erf numbers have not yet been registered.
ACRONYMS ECDHS Eastern Cape Department of Human
Settlement EIA Environmental Impact
Assessment GP General Plan HSP Human Settlement
Plan LM Local Municipality MHSP Municipal Human
Settlement Plan SA South Africa SANBI South
African National Biodiversity Institute SDF Spatia
l Development Framework
7(No Transcript)
8- 2.1.4 BACKGROUND TO SETTLEMENT
- Registered Owner Nxuba Municipality
- Property Description Portion of RE/586,
Lingelethu - Title Deed Number T17365/1979
- Servitudes N/A
- Site Size 8.94 Ha
- Kuwait 100 is situated in Adelaide within Nxuba
municipality, east of the R344 and is currently
an informal settlement, see figure 2.1.2. - According to Census 2011 data, a small number of
191 people reside on the invaded, previously
vacant land earmarked as the HSP site. - Adelaide is approximately 22.8kms and 37,6km from
its nearest neighbours Bedford and Fort Beaufort
respectively. - The site is in close proximity to the water
works, as well as Adelaide Hospital south of the
site.
- 2.1.1 PURPOSE OF THE REPORT
- The purpose of this report is to describe the key
elements to be taken into account when assessing
the feasibility of Kuwait 100 as a Human
Settlement Project and to recommend whether it
should be approved or not. - 2.1.2 BACKGROUND TO THIS REPORT
- This report is one of ten Human Settlement
Project feasibility reports for Nxuba
Municipality. It is designed so that it can be
part of a single document that includes the other
nine projects. - 2.1.3 TERMS OF REFERENCE (Part C.3 Scope of work
Tender No. SCMU11-12/13-A0240) - The project terms of reference for the
feasibility report are summarised as follows - Ascertain the feasibility of the project within
each MHSP. The study shall reveal the
developmental opportunities and constraints in
relation to - Determination of housing demand and potential
beneficiary status - Land identification and ownership
- Availability of bulk services and confirmation of
capacity - Environmental conditions
9 10Water works
11- a. Informal structures in Kuwait
- b. Vacant, unserviced land
- c. Informal structures on unsurveyed plots
12(No Transcript)
13- STATUS OF HOUSING PROJECTS AND WAITING LISTS
- A project of 100 subsidies has been proposed for
Kuwait. - The proposed projects delivery strategy and
housing instrument is project linked housing
subsidy into existing informal settlement. - The waiting lists are awaited from the Department
of Human Settlements. Therefore, the total
beneficiaries are unknown until the waiting lists
are verified. - During the site visit on 23 October 2013, it was
observed that the site is unserviced.
KUWAIT 100
Population (Nxuba SDF 2011) Not specified
Population (2011 Census) 191
No. Households (2011 Census) 64
Proposed Subsidies (EC DHS) 100
Waiting List (Nxuba LM) Awaiting
Figure 2.2.1 Statistical Background
14- LAND IDENTIFICATION AND OWNERSHIP
- The land on which Kuwait 100 will be located is
Erf 586, Lingelethu (S.G No. 3548/1978), see
figure 2.3.1. -
- Some beneficiaries reside on this erf with no
demarcated plots. - The General Plan was approved in 1978.
- The registered owner is Nxuba Municipality stated
in Title Deed T17365/1979, see Annexure 2. - This erf was identified in the SDF (2011) for a
infill housing and public open space, see section
2.8.
15 16- ENGINEERING (Kantey and Templer)
- BULK SERVICES
- Existing Services
- ....
- INTERNAL SERVICES
- Existing Services
- ....
- GEOTECHNICAL CONDITIONS
- ....
- EXISTING INTERNAL SERVICES ARE ADEQUATE AND
REQUIRE NO UPGRADING - Await KT
- TOP STRUCTURE
- ....
- TRAFFIC IMPACT ASSESSMENT
- ...
- ROADS AND ACCESSIBILITY
- ...
- THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN
SETTLEMENTS.
17- Engineering (Kantey and Templer)
Await KT
18- The project is an in-situ upgrade with existing
plots. - The Eastern Cape Biodiversity Plan (ECBCP), 2007
has developed four terrestrial Biodiversity Land
Management Classes (BLMCs) according to the
terrestrial Critical Biodiversity Areas (CBAs).
Each BLMC sets out the desired ecological state
that the area should be kept in to ensure
biodiversity persistence. - The site falls within CBA 2 as per SANBI data
(2007) and therefore is subject to BLMC 2
guidelines according to the ECBCP. - BLMC 2 permits the land to be used for
Conservation, Game Farming and Communal
Livestock. Settlements are not recommended for
these areas, however this must be ground-truthed
by a botanist, prior to undertaking the Human
Settlement Project. - Cultivated land can be found to the south of the
settlement, south of the R63 and Koonap River. - Housing development needs to ensure that it
remains 32m from the River or watercourse so as
to avoid triggering NEMA EIA Regulations, namely
Listing No. 40 as identified in the Government
Notice R. 344 (Listing Notice 1). Should the
development require a buffer less than 32m, a
basic assessment will be required for
- The expansion of
- jetties by more than 50 square metres
- slipways by more than 50 square metres or
- buildings by more than 50 square metres
- infrastructure by more than 50 square metres
within a watercourse or within 32 metres of a
watercourse, measured from the edge of a
watercourse, but excluding where such expansion
will occur behind the development setback line.
19 20- GEO-TECH (Kantey and Templer)
- In terms of the geotechnical information
available the following is extracted from a
report by Outeniqua Geotechnical Services cc,
2013 . - Some potential geotechnical constraints have been
identified for further investigation which may
have an impact on the extent of the developable
land and/or the development costs. - The recommended typical foundations for subsidy
housing are conventional strip foundations or
light rafts to cater for variations in soil
profile and minor soil movements. - On sloping terrain, some earthworks and retaining
walls may be required to create level platforms
for houses and this can have significant cost
implications. - Foundations should be placed on well compacted
natural soil, engineered fill or rock. Founding
conditions will have to be inspected by the
engineer to confirm suitable soil conditions with
adequate bearing capacity and to check for any
seepage or groundwater problems. - Preliminary and Phase 1 geotechnical site
investigations are required to obtain a more
accurate evaluation of the development potential
of each site, but the initial indications are
that the geology is unlikely to pose a
significant threat to the further development of
these areas.
21- Geo-tech(Kantey and Templer)
The Site
22- DISTRIBUTION OF SOCIAL FACILITIES
- There is one hospital and one clinic located
south of the site which is within the 1km buffer
area. This means that these health facilities are
within walking distance of the site, see figure
2.7.1. - There are primary schools just outside the 1km
walking distance of the site in New Lingelethu. - The site is within 2km of the main town of
Adelaide where more facilities are found,
including the nearest school facilities. - When social facilities are measured against the
population threshold of the Adelaide, Lingelethu
and Bezuidenhoutville area, according to the SDF,
the facilities that were needed in 2011 were 1
primary school and 2 police stations. (Nxuba SDF
2011, pg 39) - There is not an appropriate level of social
facilities within the 1km walking distance from
the site for the number of residents in Old
Lingelethu. These should be provided between Old
Lingelethu and Adelaide CBD. - Residents must travel to the nearby Adelaide CBD
in order to access higher order health, police
and education facilities. - Developing the Kuwait 100 project will not in
itself require more facilities as the
beneficiaries are already existing residents. - However, there is a need for better located
facilities closer to Old Lingelethu and it is
suggested that the proposed primary school,
identified in the SDF, be located between Old
Lingelethu and Adelaide CBD.
23- Distribution of Social Facilities
24- CURRENT SPATIAL DEVELOPMENT FRAMEWORK
- The 2011 Nxuba SDF makes the following proposals
for Adelaide - Future residential extension is proposed to grow
to the west, east and central parts of Adelaide
(see figure 2.8.1). - The proposed site of the Kuwait 100 project is
earmarked for infill housing, business and public
open space. - The main intersection with the R65 forming part
of the site is proposed as a local business node. - The majority of the SDFs residential expansion
proposals are to the north, around the
Bezuidenhoutville area (1 641 units) and infill
housing at Lingelethu to the east over a total
area of 36.18 Ha, which at 25du/Ha contributes to
904 units. - The proposed Human Settlement Project is in line
with the SDF.
25- Current Spatial Development Framework
(Source Adelaide SDF, Nxuba Spatial Development
Framework, 2011)
26- FUTURE PLANS OF OTHER SECTOR DEPARTMENTS
- The following table indicates the future plans of
other sector departments proposed in the various
settlements as contained in the IDP 2013-2014.
- Note Projects may not be in the settlement
itself, however if they were taking place within
the same ward, they were noted. - No budget was reflected in the IDP for some
projects.
27 28- SUMMARY AND RECOMMENDATIONS
- 2.10.1 SUMMARY
- The site was inspected on 23/10/2013 and the
conclusions below ground-truthed. - The ownership of the land on which Kuwait 100 and
its environs are located is registered to Nxuba
Municipality. - A general plan, erf diagram and title deeds will
have to be prepared for the new extension. - There are adequate engineering services shown on
the SDF. - Using ECBCP guidelines in determining the BLMCs
that apply to the CBA that covers the site,
settlements are not recommended for the site. It
is recommended that the site be assessed by a
qualified Botanist to verify and ground-truth the
CBA nature of the site prior to the Human
Settlement Project implementation. - A detailed geo-technical site visit inspection
and, if necessary, survey will be required prior
to the project commencing. The rocky ground on
which the current informal settlement is located
may cause problems for the provision of services. - The project comprises of 100 housing subsidy
units onto vacant, invaded land and formal plots
on abutting residential extensions. - The beneficiary list is still to be verified.
- No new facilities are required to support the
proposed Human Settlement Project. - The Human Settlement Project is in line with the
SDF, as proposed infill housing is indicated on
the site.
- 2.10.2 RECOMMENDATIONS
- The project is feasible, pending a technical
assessment by a Botanist to verify the CBA nature
of the site.