Nessun titolo diapositiva - PowerPoint PPT Presentation

About This Presentation
Title:

Nessun titolo diapositiva

Description:

Title: Nessun titolo diapositiva Author: Carmine Bassetti Last modified by: user Created Date: 3/2/1999 1:42:19 PM Document presentation format: On-screen Show – PowerPoint PPT presentation

Number of Views:71
Avg rating:3.0/5.0
Slides: 42
Provided by: Carmi7
Category:

less

Transcript and Presenter's Notes

Title: Nessun titolo diapositiva


1
THE ACSA AIRPORT SYSTEM
Facts Figures
Cape Town 10 October, 2001
2
The System
3
(No Transcript)
4
(No Transcript)
5
Geographical origin of total incoming
international pax (JNB,DUR, CPT)Calendar Year
2000
6
Passenger Traffic Patterns in South Africa
  • The ACSA airport system has clearly defined
    its traffic patterns within the country
  • Johannesburg has defined its status as the
    dominant hub for Sub-Saharan Africa
  • Cape Town, as a unique destination, has defined
    its role as a selected tourist attraction. This
    has generated high volumes of traffic, producing
    a considerable economic impact in the Western
    Cape Province.
  • Durban has consolidated its role as a principal
    Domestic Airport that feeds Domestic-International
    transfer traffic into Johannesburg and Cape
    Town.

7
(No Transcript)
8
Influencing Factor for African Traffic
European Influence
Local Influence
9
Passenger Traffic
10
ACSA Airport System - Passenger Traffic Growth
Year 2000/2001
11
Passenger Traffic Growth ACSA Airports - Year
2000/2001
12
Johannesburg International AirportAverage annual
growth rates
13
Cape Town International AirportAverage annual
growth rates
14
Durban International AirportAverage annual
growth rates
15
National AirportsAverage annual growth rates
16
ACSA within the African Continent
17
Major African Airports
18
Current structure of International Traffic
distribution within Africa
  • Mainly point to point
  • Europe to JNB, CPT East Africa
  • North America to CPT, West Africa
  • Far East to JNB

JNB a limited domestic and regional hub
19
Threats
20
Potential new structure of International Traffic
distribution within Africa
21
Economical Impact
22
Economical Impact of the ACSA Airport System
  • ACSAs airport system has a significant impact on
    the national economy.
  • The individual airports also have impact on local
    and regional regions they serve.
  • Conservative estimates by the Airports Council
    International (ACI) indicate that up to 5,000
    direct indirect and induced jobs are created for
    every 1 million passengers.
  • This therefore means that the ACSA airport system
    accounts for over 100,000 jobs in South Africa.
  • To appreciate the impact of job creation, revenue
    generation and taxes, a comprehensive Economic
    Impact Study of ACSAs airport system airport
    system is being conducted.

23
Traffic Trends
24
International Carriers in S.A.
25
Wide Body A/C Operations in S.A.
26
And in terms of capacity offered
27
Basic Facts
During the last Financial Year, the number of
inbound international passengers to S.A. has
reached 3,3 million. The breakdown between
Business and Leisure traffic (source SATOUR) is
60 40. In terms of number of heads, we are
looking at 1.320.000 Leisure Passengers. If we
take into consideration the number of Packaged
tourists out of the leisure traffic, the number
of passengers fall to 600.000 . The lack of mass
tourism is a direct consequence of a lack of
basic infrastructure for this type of market
segment. The annual growth of this sector of the
market is 2.2 per annum
28
Comparison with other countries
  • Spain 50 million Tourists
  • Hungary 15 million Tourists
  • Thailand 7 million Tourists
  • South Africa 0,6 million Tourists

29
Effect on Passenger Traffic
The lack of infrastructure for mass tourism has
affected our traffic growth. The airlines that
initially opened routes to S.A. with B 747
operations have seriously revised their
strategies. The initial use of B 747 aircraft was
to cater for the unexpected demand to travel to
S.A.. Today, the South African market, based on
travel demand indicators, has reached capacity
and therefore the airlines have revised the fleet
used on the S.A. route. The fleet adjustment
done by the airlines to handle the (decreased)
traffic demand for S.A. has had a serious effect
on the passenger growth on ACSA airports in the
past 2 3 years.
30
Developing the Business
31
A capital expenditure of R 2.7 billion in the
next 5 years (2001-2006) is foreseen (approved
permission) for infrastructure development for
the ACSA Airport System. The Development Program
is Traffic Demand Driven and based on the IATA
forecast. The guiding strategy is to consolidate
Johannesburgs Hub status (which will have a
positive effect on the whole ACSA airport system)
with the development of infrastructure necessary
to process the volumes of passengers in line the
forecasted traffic growth. ACSA has restructured
and totally focused on Traffic Development, by
creating a Business and Market Development
Division.
32
Capital Expenditure 5 Year Business
Plan (approved Permission)
179
33
Comparison Between Capital Expenditure (approved
Permission) - Passenger Traffic Revenues
Generated
179
34
Johannesburg International Airport
35
Medium/Long Term Development Plan
Western Precinct Max Capacity 18/20 million Pax
Future Midfield Terminal Complex 40 million Pax
36
Johannesburg International Airport - Master Plan
Update
2nd PHASE MULTI-STOREY CAR PARK 2005
MULTI-STOREY CAR PARK COMPLETED
BRAVO APRON EXTENSION TXY 2005/2006
1st PHASE MULTI-STOREY CAR PARK 2002
CHARLIE APRON 2002/2003
DOMESTIC TERMINAL 2002/2003
INT.L TERMINAL EXTENSION 2005
INTERNATIONAL NORTHERN PIER 2003
ECHO APRON 2001
INTERNATIONAL TERMINAL UP-GRADE 2001
INTERNATIONAL TERMINAL COMPLETED
HOTEL 2000
CURB EXTENSION AND SOUTH AREA ACCESS ROADS
UPGRADE 2002/2003
NORTH AREA ACCESS ROADS UPGRADE within 2002
37
Cape Town International Airport
38
  • Final layout Reference year 2014

AIRPORT PLANNING DEVELOPMENT
39
Durban International Airport
40
DURBAN AIRPORT - ACTUAL CONFIGURATION
Pax Terminal
Parking
B APRON (9 positions)
A APRON (12 n/b or 6 w/b positions)
RWY 06/24 2440 x 60 m
41
THANK-YOU
Write a Comment
User Comments (0)
About PowerShow.com