XYZ Port Facility Maritime Security Drill - PowerPoint PPT Presentation

About This Presentation
Title:

XYZ Port Facility Maritime Security Drill

Description:

XYZ Port Facility Maritime Security Drill Briefing for Players date Emergency Response Contingencies Evacuation Drill D423 Scope Review of the previous drill Date ... – PowerPoint PPT presentation

Number of Views:172
Avg rating:3.0/5.0
Slides: 20
Provided by: oas72
Learn more at: http://www.oas.org
Category:

less

Transcript and Presenter's Notes

Title: XYZ Port Facility Maritime Security Drill


1
XYZ Port FacilityMaritime Security Drill
  • Briefing for Players

date
2
  • Emergency Response
  • Contingencies

Evacuation
Drill D423
3
  • Scope
  • Review of the previous drill
  • Date, time, location
  • Aim
  • Objectives
  • Desired outcomes
  • Controllers
  • Players
  • Scenario
  • Port Facility security instructions
  • Communications
  • Safety
  • Debrief
  • Update on the ISPS Code/local regulations
  • Developments in maritime security

4
  • Review of Previous Port Facility Drill no. X/XX
  • Date conducted
  • Objectives
  • Lessons Learnt

5
Drill number X/XX Date Start
Time Location Estimated End Time
6
Aim To enhance the proficiency of security staff
in evacuating the port facility when ordered.

7
  • Objectives
  • Port facility staff will be required to conduct
    evacuation according to the procedure and
    requirement in the PFSP.

8
  • Desired outcomes
  • Staff will be able to
  • Prepare the port facility for evacuation.
  • Carry out evacuation properly and expeditiously.

9
  • Control Team
  • Chief Controller Safety Manager, Mr. AAA

10
  • Players
  • PFSO
  • Port facility security staff
  • Port facility operations staff
  • Building occupants

11
Scenario A bomb threat has been declared in the
and the building has been ordered to be
evacuated.
12
  • Port Facility Security Instructions

13
  • Communications
  • Telephone
  • Walkie-Talkie
  • Player Ch YY

14
Code words
Drill Start The drill is to commence
Drill Suspend The drill is temporarily suspended
Drill Go The drill is to resume from where it was suspended
Drill Stop The drill is to be terminated (prematurely)
Drill End The drill is completed
Drill, Drill, Drill The message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity
15
  • Safety
  • Physical safety of personnel is paramount
  • Please walk calmly and quickly to the nearest
    exit and proceed to designated assembly point
  • Do not use the lifts
  • No pushing
  • Take care when walking down stairs.

16
  • Debrief
  • Location
  • Secretary
  • Attendance

17
  • Updates on the ISPS Code and
  • local Regulations

18
  • Developments in Maritime Security

19
Any questions ?
Write a Comment
User Comments (0)
About PowerShow.com