Whats Happening on the ILC Controls Front at FNAL
Margaret Votava Fermilab January 9th, 2006
2
ILCs and FNALs Top Priority
  • Getting a credible cost for construction approval
  • Cavity RD
  • Controls and LLRF systems are required for this
    RD
  • Some LLRF RD is necessary for getting cavity
    test areas working.
  • RD for the Controls system itself is vital, but
    it can wait.
  • How much controls RD is needed/desired to make
    the test areas work?

3
Funding Issues
  • Despite priorities, ILC has not allocated nearly
    enough funds for controls support of the cavity
    testing areas, let alone controls RD.
  • Controls is not unique. True for other
    infrastructure support as well RF, LLRF,
    instrumentation, etc.
  • This is recognized by FNAL and is being ignored
    at the moment. (at least for FTE)
  • FNAL SCRF proposal going for DOE funding in
    February
  • Approval is critical for NML.
  • Schedules are a mess and completely unreliable,
    but will improve

4
Where are the Controls Efforts Now
  • Global Effort
  • WBS exercises and writing RDR, RD project plans,
    etc
  • ANL, FNAL, a little SLAC and sometimes DESY and
    KEK (but mostly for LLRF)
  • Necessary, but dull
  • Test Area Effort
  • Vertical Test Stand(s) at IB1
  • Horizontal Test Stand at MDB
  • Super conduction RF test area at NML
  • Cryomodule testing here
  • Will have beam
  • SLAC and ANL want to be involved at a 0.5 FTE
    level

5
Global Controls Effort
  • Costing and RDR writing for GDE 1.5 FTE. Enough
    to go to the weekly meetings.
  • Jim, Sharon, Brian, Margaret, Vince, Ron, Steve
    Wolbers, Bakul
  • Have an RD project plan, but very limited
    funding to work on any of it through FY08.
  • High availability both hardware and software.
  • Charlies work in ATCA falls in here.
  • Phase reference distribution
  • Controls system architecture, including gap
    analysis
  • Delays probably ok, but there are many things
    that we could be integrating in at NML from the
    get go.
  • Maybe we still can with NML delays ?.

6
Test Area Effort
  • We are looking for 11.5 FTEs just for base
    support of test areas (ie, no RD)
  • 3.5 for common infrastructure support
    EPICS/DOOCS base support, configuration
    management, system admin, CRL support, etc
  • 0.5 Development for new instrumentation
  • 2.5 Data Management
  • 3.0 Software development for SCRF
  • 2.0 Hardware development for SCRF
  • 2.0 Cavity Data Management
  • 0.5 HTS support / 0.25 VTS support
  • Combination of all divisions. Primarily (data
    management not listed)
  • CD Margaret, Ron, Luciano
  • AD Mike, Dennis, Sharon, Peter P, Michele
  • PPD Vladimir, Geoff
  • Short of needed effort

7
NML
  • SCRF facility for ILC and Accelerator RD
  • Quite large - on the scale of TTF
  • https//docdb.fnal.gov/ILC-private/DocDB/ShowDocum
    ent?docid363
  • Ultimately 3 cyromodules, but building needs to
    be extended to fit third.
  • Much of photoinjector will move. New RF gun?
  • Building is empty now
  • Cryo being installed Epics based
  • Network switch added
  • Controls requirements document being drafted
  • https//docdb.fnal.gov/ILC-private/DocDB/ShowDocum
    ent?docid325
  • difficult to get input from stakeholders
  • We are on ground floor here exciting time to be
    involved
  • This is a laboratory effort (cross divisional)
    and hopefully even multilab.
  • Establishes the collaboration for ILC

8
NML View (Except Beamline Areas)
9
Controls System Knowns
  • Integrated DOOCS/Epics
  • Many components have interfaces in one or the
    other, but not both
  • SCRF is advertised as an international facility
    for people to test. Need to support the DESY
    collaboration.
  • Labview and MATLAB will have end users as well
  • ATCA Test Platform for BPMs
  • Instrumentation expecting controls to provide the
    infrastructure

10
Short term deliverables (2007)
  • First Cryomodule delivered summer
  • Coupler conditioning
  • Warm testing
  • Archiving, alarming, control, interfaced to data
    management
  • Photocathode prep system delivered in fall
  • Developed at INFN Milano
  • Labview based
  • Interface to archiving, alarming.

11
Development Work to Support Facility
  • DOOCS/EPICS interface
  • Soft IOC exists at DESY built against very old
    versions of both
  • IOC support for new devices
  • Interlock/modulator upgrade
  • Retire SPARC boards (almost done?)
  • Control interface for cathode prep system
  • Sequencer support for NML processes
  • Alarming/archiving design
  • Operator Interfaces!!!!
  • Clock and timing (need a workshop on this)
  • Diagnostics

12
RD Plans
  • Facilitate Remote Control
  • Evaluate/integrate role based access (RBA)
  • Conflict Avoidance
  • Remote resets
  • Development environment
  • Java application support?
  • Eclipse environment?
  • Scalability
  • Configuration databases (eg, IRMIS)
  • High Availability
  • ATCA
  • Diagnostic Interface Layer (DIL)
  • Middleware