W504 Asbestos removal Case studies Case study 1 Asbestos rope removal gas production platform Removal of asbestos rope insulation from pipework on gas ... – PowerPoint PPT presentation

Number of Views:87
Avg rating:3.0/5.0
Slides: 48
Provided by: A83178
Category:
Tags: insulation | w504

less

Transcript and Presenter's Notes

Title: W504


1
W504 Asbestos removal Case studies
2
Case study 1 Asbestos rope removal gas
production platform
  • Removal of asbestos rope insulation from pipework
    on gas production platform
  • Asbestos content of rope contains approximately
    95 100 chrysotile
  • Comment on procedures adopted

3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
Case study 2 Removal of asbestos insulating
board riser panels
  • Removal of asbestos insulating board riser duct
    panels from block of flats in London
  • Asbestos content of insulating board
    approximately 20 amosite
  • Comment on procedures adopted

17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
(No Transcript)
33
(No Transcript)
34
Removal of asbestos insulating board ceiling
panels
  • Asbestos insulating board panels (contain
    approximately 20 amosite) to be removed from a
    school site
  • How would you expect the work to be undertaken?
  • Consider the following
  • Work program
  • Removal techniques
  • Controls to prevent spread of asbestos
  • Decontamination procedures
  • Clearance certification
  • Any other issues

35
(No Transcript)
36
Removal of asbestos insulation from under floor
duct
  • Asbestos sectional pipe insulation (contains
    approximately 40 chrysotile) to be removed from
    a hospital site
  • How would you expect the work to be undertaken?
  • Consider the following
  • Work program
  • Removal techniques
  • Controls to prevent spread of asbestos
  • Decontamination procedures
  • Clearance certification
  • Health and safety issues
  • Any other issues

37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
Removal of asbestos spray coating, asbestos
insulating board and asbestos cement sheeting
  • Asbestos spray coating to high level beams
    (contains approximately 90 amosite)
  • Asbestos insulating board panels as internal wall
    panels (contains approximately 20 amosite)
  • Asbestos cement external sheet (contains
    approximately 10 chrysotile)
  • All above to be removed from a large warehouse
  • How would you expect the work to be undertaken?
    Consider the following
  • Work program
  • Removal techniques
  • Controls to prevent spread of asbestos
  • Decontamination procedures
  • Clearance certification
  • Any other issues