... hold while technical issues are sorted out Currently Available DSS Data Data being served to web page via a CD jukebox jukebox and web page maintained by ... – PowerPoint PPT presentation

Number of Views:58
Avg rating:3.0/5.0
Slides: 13
Provided by: AmyR51
Learn more at: https://gsss.stsci.edu
Category:

less

Transcript and Presenter's Notes

Title: Plate Scanning, Processing, and Compression Status


1
Plate Scanning, Processing, and Compression Status
  • Amy Rosenberg

7th Annual GSC-II Meeting
2
Scanning Status
Survey Goal Current Total Done
POSS-II J 897 902 100
POSS-II F 897 910 100
POSS-II N 897 880 98
AAO-SES 606 614 100
PPARC-ER 288 288 100
AAO-SR 118 118 100
UKST-ST 112 50 45
UKST-IR 894 768 86
SERC-J/EJ 447 443 99
POSS-I E 106 106 100
POSS-I O 354 359 38
3
Scanning Machines
  • Gamma I being used to scan 2 plates per day
  • Gamma II still suffering from unknown problems

4
Currently Scanning
  • IS plates
  • 86 complete
  • XO plates
  • being scanned between shipments of IS plates
  • 38 complete

5
GSC-II Plate Processing Status
Survey Goal Current Total Done
POSS-I E 936 931 99
POSS-QV 613 2 0
POSS-II J 897 897 100
POSS-II F 897 897 100
POSS-II N 897 308 34
SERC-J/EJ 894 829 93
South-F 894 894 100
UKST-IR 894 392 44
South-SR 116 116 100
South-QV 94 94 100
POSS-I O 936 15 2
6
GSC-II Plate Processing Status
  • IS, XI, and some XO plates currently being
    processed
  • IS survey is 44 complete
  • XI survey is 34 complete
  • XO survey is 2 complete
  • going slower due to loss of Fabrizia!

7
GSC-II Plate Processing Status
  • No global recalibrations have been performed
    recently
  • A few plates have needed updating
  • All processed data now has the latest astrometry
    and photometry applied
  • IV N (IS and XI) plates have not been loaded into
    the COMPASS database
  • This processed data has been written to tape and
    will be loaded at a later date

8
DSS-II Compression Status
Survey Goal Current Total Done
POSS-II J 897 897 100
POSS-II F 897 897 100
POSS-II N 897 748 83
AAO SES 606 606 100
PPARC ER 288 288 100
AAO-SR 118 118 100
UKST-IR 894 697 78
POSS-I O 936 94 10
9
Currently Compressing
  • XI Survey
  • 83 complete
  • XO Survey
  • 10 complete
  • IS Survey
  • 78 complete

10
Status of DSS Data Migration
  • All DSS-I, DQVS, and DSS-II data to be moved to a
    raid array
  • will eventually serve a web page interface
  • All of DSS-I and DQVS migrated
  • Problems in migrating data
  • migration of DSS-II has been put on hold while
    technical issues are sorted out

11
Currently Available DSS Data
  • Data being served to web page via a CD jukebox
  • jukebox and web page maintained by Archive Branch
  • DSS-I, DQVS, and only part of DSS-II currently
    available online
  • All headers completed, but not currently
    available online

12
Future Activities
  • Complete scanning, processing, and compression of
    XI, XO, and IS surveys
  • Limited by telescope availability to complete
    observations
  • Completion of DSS data migration and header
    availability
  • Load all processed data onto COMPASS
  • Perform any recalibration tasks to all data on
    the database side
  • Operational goals may need to be scaled back due
    to staffing and resource issues