The Kubota Submerged Membrane Process The Future of Sewage and Effluent Treatment ? - PowerPoint PPT Presentation

About This Presentation
Title:

The Kubota Submerged Membrane Process The Future of Sewage and Effluent Treatment ?

Description:

Title: The Kubota Submerged Membrane Process The Future of Sewage and Effluent Treatment ? Author: Dr Stephen J. Churchouse Description: Cursor graphics format ... – PowerPoint PPT presentation

Number of Views:80
Avg rating:3.0/5.0
Slides: 13
Provided by: DrSt58
Category:

less

Transcript and Presenter's Notes

Title: The Kubota Submerged Membrane Process The Future of Sewage and Effluent Treatment ?


1
Porlock Sewage Treatment Plant
Site data
  • Located in Exmoor National Park, with nearby
    bathing beach
  • 3800 population equivalent (summer)
  • 1900 m3/d flow to full treatment
  • Sewage feed started 12th February 1998

2
Principle of Operation
In
Out
Screened crude sewage
Treated disinfected effluent
Waste Sludge (to further treatment)
Air in
3
Membrane Filtration
Solids
Virus
Air
Treated effluent
Bacteria
Membrane
4
Porlock Treatment Building
Permeate Pumps
4.
Aeration Tanks 1 - 4
2.
Crude Effluent inlet
Tidal Storage
Fine Screens 3 mm
Final Effluent out
Anoxic recycle Tank
Blowers
1.
3.
Washing Tank
Membrane Units
5
Porlock Aeration Tank MLSS
Feb 98 - Sept 99
6
Porlock BOD Removal
Feb 98 - Jan 00
7
Porlock NH3/4 Removal
Aug 98 - Apr 99
No ammonia consent No dissolved oxygen control
8
Porlock Faecal Coliforms
Feb 98 - Jan 00
Sampling contamination identified
Intensive sampling periods
9
Porlock Faecal Coliphage Virus
Feb 98 - Jan 00
Change of test procedure
10
Porlock Final Effluent Turbidity
Turbidity meter set up incorrectly - readings
higher than actual
Feb - June 1998
11
Porlock STW- Compliance Results