Manchester 737 Accident, 1985 PowerPoint PPT Presentation

presentation player overlay
About This Presentation
Transcript and Presenter's Notes

Title: Manchester 737 Accident, 1985


1
Full-Scale Testing of Intumescent-Coated Aluminum
Skin
Manchester 737 Accident, 1985
2
Fuselage Burnthrough Protection Using Intumescent
Coating
3
Fuselage Burnthrough Protection Using Intumescent
Coating
Advantages
Complete and continuous coverage of lower
fuselage half, no discontinuities
No disruption of present thermal acoustic
insulation system design
Potential weight savings?
Disadvantages
Unproven long term performance as exterior coating
Performance during accident in which fuselage
skin is scraped or damaged?
4
Proposed Full-Scale Testing of Intumescent-Coated
Skin
5
Full-Scale Test Rig To Evaluate
Intumescent-Coated Panels
6
Full-Scale Test Rig To Evaluate
Intumescent-Coated Panels
7
Full-Scale Test Rig To Evaluate
Intumescent-Coated Panels
8
Intumescent Testing in Laboratory Environment
9
Intumescent Testing in Laboratory Environment
burnthrough test on typical insulation blanket
10
Intumescent Testing in Laboratory Environment
intumescent coated aluminum panel
intumescent coating begins expanding
11
Intumescent Testing in Laboratory Environment
burner flame choked
12
Difficulty Testing Intumescents Using Present
Burnthrough Test Rig
13
Intumescent Testing in Laboratory Environment
intumescent coated aluminum panel
intumescent coating begins expanding
roll burner back
14
Proposed Testing of Intumescent Coated Aircraft
Skin
1. Conduct full-scale proof-of-concept test at
FAATC
2. Conduct lab-scale tests using burnthrough
apparatus at FAATC
3. Adjust or revise test protocall as necessary
Write a Comment
User Comments (0)
About PowerShow.com