LAL Site Report - PowerPoint PPT Presentation

About This Presentation
Title:

LAL Site Report

Description:

LAL / IN2P3 jouvin_at_lal.in2p3.fr ... Test Group chairman Plan to resume participation to testbed 22/10/2002 LAL Site Report - HEPix ... – PowerPoint PPT presentation

Number of Views:94
Avg rating:3.0/5.0
Slides: 8
Provided by: fna65
Category:
Tags: lal | report | site | test

less

Transcript and Presenter's Notes

Title: LAL Site Report


1
LAL Site Report
  • Michel Jouvin
  • LAL / IN2P3
  • jouvin_at_lal.in2p3.fr

2
Main Ressources Changes
  • No major change
  • More machines and GB like everywhere
  • Efforts concentrated on SAN deployment
  • Works very well
  • Fabric redundancy not yet configured
  • Still planning heterogeneous SAN in 2003
  • One more system engineer arrived Oct. 1st
  • IN2P3 national deals for some software
  • Vmware, Legato Networker

3
Main Resources

DS20
  • NFS
  • SMB
  • Appletalk
  • www
  • Mail
  • Print

FC
AS 800 5/500
Gb Ethernet
100 Mb
LSF Cluster (batch interactive)
10 Mb
4
Server Software Updates
  • Linux 7.2 (kernel 2.4.18) completed
  • Started a monitoring project based on Nagios
  • Nagios presented by INFN at last meeting
  • Robust collection mechanism/infrastructure
  • Development of user oriented view of the
    ressources (Web-based)

5
Mail Service
  • Still based on Sendmail IMAP
  • Virus/Spam filtering project just started
  • Filtering based on message headers criteria
    rather than contents, using Sendmail milter API
  • More efficient than antivirus, preserve Sendmail
    advanced features
  • Most viruses can be detected by attachment types
  • Heuristic can be applied to detect spammers
  • Restrict relaying with authenticated SMTP
  • Upgrade IMAP server to Cyrus v2
  • Interested by any experience with Cyrus v2

6
Windows Infrastructure
  • Desktops
  • Windows XP deployment on new laptops
  • Server
  • Replacement of old unattended installation
    infrastructure by W2K RIS (PXE based)
  • CERN PrinterWizzard in production
  • Works pretty well
  • Two main issues
  • Handling of drivers for some printer types
  • Ability to use PrinterWizzard at LAL and at CERN

7
Miscellanous Projects
  • IN2P3 ActiveDirectory forest
  • 1 domain per lab(10 participating)
  • Pilot started recently
  • Plan to move to production during winter
  • EDG/LCG
  • One engineer sent to CERN for LCG
  • G. Grosdidier Test Group chairman
  • Plan to resume participation to testbed
Write a Comment
User Comments (0)
About PowerShow.com