Agenda (Fri., June 7) - PowerPoint PPT Presentation

About This Presentation
Title:

Agenda (Fri., June 7)

Description:

8:00 AO UI Demonstration 9:00 Introductions to AO team 9:05 AOWG Chair Selection 9:15 Review Agenda (make changes?) 9:20 Review Planned & Potential AO Projects – PowerPoint PPT presentation

Number of Views:91
Avg rating:3.0/5.0
Slides: 19
Provided by: DougS174
Category:

less

Transcript and Presenter's Notes

Title: Agenda (Fri., June 7)


1
Agenda (Fri., June 7)
  • 800 AO UI Demonstration
  • 900 Introductions to AO team
  • 905 AOWG Chair Selection
  • 915 Review Agenda (make changes?)
  • 920 Review Planned Potential AO Projects
  • 1030 Break
  • 1045 Continue Project Review
  • 1130 Discuss Other Project Ideas
  • 1200 Lunch (in lounge)
  • 1300 Decide on Discussion Topics begin
    Discussions
  • 1500 Break
  • 1515 Executive Session
  • 1615 Addition Discussions with AO Team
  • 1700 End

2
Keck AO Team
AO P. Wizinowich
AO for Interfer. C. Neyman
Software P. Stomski
LGS AO Dev. A. Contos
Science Ops D. Le Mignant
Tech Support T. Saloga M. Wagner
S. Hartman D. Summers
Laser J. Chin New hire
3
Keck AO Future Directions
  • P. Wizinowich D. Le Mignant
  • for Keck AO Team
  • AOWG June 7, 2002

4
Future Directions
Performance
Science Efficiency
Strehl Ratio
Sky Coverage
Emissivity Thruput
Science Capabilities
Operations
Characterization Modeling
5
Future Directions
  • Strehl
  • Sky Coverage
  • Emissivity Throughput
  • Operations
  • Science Capabilities
  • Performance Characterization Modeling
  • Other Ideas?

6
NGS Error Budget
Set A / Set B _at_ 30 / Set C _at_ 60
Strehl Ratio 0.48 / .33 / .03 _at_ H
Strehl Ratio 0.91 _at_ H
Strehl Ratio 0.53 / .36 / .03 _at_ H
Total RMS (nm) 140 / 213 / 460
AO Tilt (nrad) 23 / 36 / 77
AO System 140 / 213 / 460
Telescope 152
Science Inst. 35
Field Dep. 0 / 0 / 0
Windshake ?
Measurement 114 / 128 / 224
Segment 82
Centroid Anis. 15 / 30 / 69
Fitting 63 / 123 / 285
ACS Noise 58
Sci Inst. Align. 15
Assumptions NGS 2000 cnts Everything on-axis
Bandwidth 36 / 113 / 282
Phasing 50
Measurement 7 / 12 / 29
Calibration 30
Vibrations 100
Isokinetic Ang 0
Requirement SR 0.79 / .64 / .08 _at_ H For an
infinitely bright star
Internal 20
Stacking 20
Bandwidth 0 / 1 / 1
7
A. Strehl Improvement
  1. Interferometer vibration reduction (FY02/03)
  2. Telescope optical performance improvements
    (FY03/05)
  3. K2 wavefront sensor image quality improvement
    (FY02/3)
  4. Interferometer K1 real-time processor upgrade to
    Mercury PowerPC (FY03)
  5. K2 IR atmospheric dispersion corrector
  6. K2 visible atmospheric dispersion corrector
  7. Multiple wavefront sensor platescales
  8. Gain optimization in PRC
  9. Better reconstructors in PRC
  10. NIRC2 alignment monitoring tool (if necessary)
  11. K2 LGS on-axis laser projection telescope
  12. K2 real-time processor upgrade to Mercury PowerPC
  13. Increase fast tip/tilt mirror stroke

8
NGS Error Budget
Strehl Ratio 0.48 / .33 / .03 _at_ H
Strehl Ratio 0.91 _at_ H
Strehl Ratio 0.53 / .36 / .03 _at_ H
Total RMS (nm) 140 / 213 / 460
AO Tilt (nrad) 23 / 36 / 77
AO System 140 / 213 / 460
Telescope 152
Science Inst. 35
Field Dep. 0 / 0 / 0
Windshake ?
2
5
13
9
Measurement 114 / 128 / 224
Segment 82
Centroid Anis. 15 / 30 / 69
3
6
Fitting 63 / 123 / 285
ACS Noise 58
Sci Inst. Align. 15
10
4
8
Bandwidth 36 / 113 / 282
Phasing 50
Measurement 7 / 12 / 29
7
12
Calibration 30
Vibrations 100
Isokinetic Ang 0
1
11 LGS measure- ment error
Internal 20
Stacking 20
Bandwidth 0 / 1 / 1
9
B. Sky Coverage
  1. K2 LGS upgrades to AO system (FY02)
  2. K2 LGS laser completion (FY02/3)
  3. K2 LGS integration (FY03)
  4. Geometric based subaperture mapping in PRC (FY03)
  5. Larger subapertures
  6. Lower noise wavefront sensor CCDs
  7. Denominator free centroiding
  8. Larger guide star field for wavefront sensing
  9. K1 LGS laser installation
  10. K1 LGS upgrades to AO system

10
LGS Upgrades
  • Tip/tilt sensor
  • Low bandwidth wavefront sensor
  • Sodium rejection
  • Wavefront sensor pupil relay tracking
  • Acquisition camera range
  • 3rd field steering mirror
  • Uplink tip/tilt to laser
  • See KAON 216 for details schedule

11
Laser System Completion
  • Diagnostics Calibrations
  • Polarization diagnostic cameras (filters
    shutters) Power in the Bucket Pointing
    Centering interfaces (pressures, power)
  • Operations
  • Startup shutdown guis verify alarm handlers
    maintenance schedules flexure impact stability
  • Optical Alignment
  • Laser table procedures
  • Safety
  • Aircraft mosaic radar wide field camera
    systems
  • Laser traffic control system testing

12
C. Emissivity Throughput
  1. Enclosure modifications to support cleanliness
    lower temperatures (FY02/3)
  2. Interferometer image rotator mirror coatings
    (FY02/3)
  3. Interferometer cold body in reflection off IR
    transmissive dichroic
  4. Improve image rotator alignment
  5. Measure current throughput improve coatings

13
D. Operations
  1. Interferometer wavefront controller upgrade on
    K1 K2 (FY02)
  2. Interferometer user interface reliability fix
    (FY02)
  3. Interferometer automation (FY02/3)
  4. AO response to rotator slews (FY02/3)
  5. Observing Assistant Support Astronomer training
    (FY02/3)
  6. New AO operations software (FY03/4)
  7. UPS for AO VME crates (FY02)
  8. K2 LGS aircraft safety systems for laser
    (FY02/3)
  9. K2 LGS space command interface (if needed)

14
E. Science Capability
  1. NIRC2 spectroscopy commissioning (FY02)
  2. NIRC2 coronagraphy commissioning (FY02/3)
  3. NIRC2 calibration lamps (FY03)
  4. NIRC2 quicklook data reduction pipeline
  5. K2 field steering mirror upgrade (for NIRC2
    spectroscopy) (FY02)
  6. K2 LGS AO engineering science verification
    (FY03)
  7. K2 LGS queue scheduling
  8. OSIRIS design support (FY02/4)
  9. OSIRIS fold mirror (FY04)
  10. OSIRIS commissioning support (FY04/5)
  11. OSIRIS SHARC on K1
  12. Interferometer ZnSe IR transmissive dichroics
    for 10 um imager (FY05)
  13. Interferometer field selector mirrors for imager
    (FY05)

15
E. Science Capability
  • OHANA fiber input test (FY03)
  • OHANA fiber injection module implementation on
    K12
  • Improved performance on extragalactic targets
  • Acquisition camera upgrade to a visible science
    camera
  • Electronic logging of science observations
    (FY02?)
  • IR wavefront sensor
  • Differential tracking for field steering mirrors
  • Next generation Keck AO CoDR
  • Next generation Keck AO PDR, CDR, fab, IT
    commissioning
  • PSF reconstruction

16
F. Performance Characterization Modeling
  1. Atmospheric characterization tool (FY02)
  2. CfAO postdoc performance modeling
    characterization effort (FY03/4)
  3. Additional AO characterization modeling efforts

17
Other Ideas
  • CfAO ExAO proposal
  • Development Environment
  • Postdocs, students, sabbaticals,
  • ???

18
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com