Rapid Technology Application Program - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Rapid Technology Application Program

Description:

Title: Slide 1 Author: Department of Homeland Security Last modified by: DHS Created Date: 2/10/2005 4:59:32 PM Document presentation format: On-screen Show – PowerPoint PPT presentation

Number of Views:92
Avg rating:3.0/5.0
Slides: 18
Provided by: Departme210
Category:

less

Transcript and Presenter's Notes

Title: Rapid Technology Application Program


1
Rapid Technology Application Program
Mr. Maurice SwintonRTAP Program
Managermaurice.swinton_at_dhs.gov Engaging the
Private Sector Homeland SecurityRD Directions
and PrioritiesAugust 23, 2005
2
Overview - RTAP
  • Purpose
  • Satisfy near-term technology needs of DHS
    customers State and Local responders
  • Objective
  • Deliver customers highest priority prototypes in
    6-18 months after development contract award

3
Overview - RTAP
  • Method
  • Annually, help customers generate highest
    priority technical requirements for prototypes
  • HSARPA solicits the private sector and they
    develop the prototypes
  • Work with users to field test as desired
  • Funding
  • 35M in FY05, and as appropriated each year
    thereafter

4
User Commitment Crucial
  • Why start a near-term project without a
    commitment to field?
  • Users define requirements and priorities
  • Requirements generation panels formed of users
    nominated by their Under Secretary
  • Users work with ST through field test phase
  • Production procurement and deployment is the
    responsibility of the users

5
Annual RTAP Cycle
6
RTAP Requirements Generation Panels
  • Chemical CM
  • Bio CM
  • Explosives CM
  • Cyber Security
  • Threat Awareness (formerly TVTA)
  • Infrastructure Protection
  • Border Transportation Security
  • Emergency Preparedness Response
  • USCG
  • Federal Law Enforcement
  • Proposed Panel (State / Local)

7
RTAP Requirements Generation Panels
  • Voting Membership
  • Members designated by Under Secretary or
    Component Head
  • Supporting Members
  • ST Portfolio Manager
  • HSARPA Program Manager
  • Support contractors
  • Facilitator

8
Voting Members Roles
  • Collect and present rapid prototyping needs of
    their directorate
  • Develop detailed Statements of Requirements
  • Prioritize their requirements

9
ST Supporting Members Role
  • For each potential RTAP development effort, help
    the Voting Members
  • Determine technical feasibility
  • Estimate development cost
  • Estimate development time
  • Ensure SOR is clear to the technical community

10
Selected Statements of Requirements
  • Chem CM RGP
  • One-Person-Portable Chemical Detector CBP
  • Tactical Escape Mask FAMS
  • Bio CM RGP
  • 1 Rapid Suspected Bio-agent Screening FAMS
  • 2 Aircraft "Spot" Decontamination FAMS
  • 3 Biosurveillance Detection Algorithms PSD
  • 4 Rapid Field Identification of High Priority
    CBP Plant Pathogens (RFIP)

11
Selected Statements of Requirements
Explosives CM RGP 1 Maritime Safety and
Security Team USCG Explosive Trace Detection
2 Non-invasive Portable Object Examination
System ICE/FAMS 3 Advanced Capability X-ray
System for Bomb Squad IAIP Cyber RPG
1 BOTNET NCSD 2 Control System Cyber
Assessment Tool IAIP 3 Exercise Scenario
Modeling Tool NCSD
12
Selected Statements of Requirements
  • TA RGP
  • 1 Significant Encounters Visual Environment
    (SIEVE) CBP
  • 2 Modeling the Complex Urban Environment (MCUE)
    IAIP
  • CIP RGP
  • Transportation Route Risk Analysis and
    IAIP Resource Allocation Tool

13
Selected Statements of Requirements
BTS RGP 1 Improved Heartbeat Detector System
Prototype CBP 2 Extreme Wide FOV IR/Night
Vision Capability USCG 3 FAMS Tactical
Information Sharing System (TISS) ICE/FAMS
Image Analysis Capability EPR RPG
1 Advanced 3-D Locator System
FEMA 2 Geospatial Modeling of Homeland Security
Capabilities SLGCP 3 Resource Awareness Data
Portal SLGCP 4 Advanced Urban Search and Rescue
(USR) FEMA Breaching Approach
14
Selected Statements of Requirements
  • USCG RGP
  • Blue Force Tracking Tool and Evaluation of
    Multi-AgencyMaritime Blue Force Tracking (BFT)
    System (BFT2) Commandant USCG
  • Sector Command Center (SSC) Simulator Testbed
    Commandant USCG
  • Federal Law Enforcement RGP
  • Portable Entry Point Screening Portalfor
    Explosive Detection
  • Escape Hood

15
Next Steps for FY05
?
  • RTAP solicitation publish, evaluate, select,
    award contract and start development
  • Work with users to define and conduct field tests

16
RTAP Contacts /Websites
  • Maurice Swinton
  • RTAP Program Manager
  • Maurice.Swinton_at_dhs.gov
  • (202) 254-6342
  • Aaron Lang
  • RTAP Support Specialist
  • Aaron.Lang_at_associates.dhs.gov
  • (202) 254-6317
  • www.hsarpabaa.com ----- location of HSARPA
    solicitation portal
  • www.fedbizopps.gov -------RTAP synopsis and BAA

17
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com