Information To Assess Right Way Forward - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

Information To Assess Right Way Forward

Description:

Title: Repair Methods Author: Frank Papworth Last modified by: Frank Papworth Created Date: 9/19/1998 8:25:12 AM Document presentation format: On-screen Show – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 7
Provided by: FrankP203
Category:

less

Transcript and Presenter's Notes

Title: Information To Assess Right Way Forward


1
Information To Assess Right Way Forward
  • Cause of damage
  • Would you have surgery without seeing a physician
    to see what is wrong?
  • Extent of damage
  • Job blow out
  • Expands to become structural
  • Structural significance of damage
  • If it will not become unsafe or cause loss leave
    it
  • Likely future damage if left two extremes
  • If it wont fail in design life leave it
  • A stich in time
  • Prognosis if repaired
  • Some repairs cause more problems than they solve
  • Life Cycle Cost Cheap and repetitive vs once
    off and long life

2
Client Interview
  • Ask questions
  • What does he want in terms of
  • Overall Life
  • Aesthetics
  • Operational interference
  • Safety
  • Budget (lowest cost now or long term)
  • Risk
  • Consequence of failure (Likelihood comes from
    survey)
  • History
  • Design, construction, operation and maintenance
  • Inform
  • Company policy on
  • Approach to assessment and repair
  • Liability involved
  • Risk minimalisation
  • Confirm in writing

3
Damage Assessment
Repair Patch Injection CP Coating Environmental Co
ntrol
Damage Spalling Cracking Active Corrosion Future
Activation Future Damage
Survey Method Visual Visual Potential,
Drummy Cl-, Carb, Cover Resistivity Polarisation
4
Planning - the most cost effective survey tool
  • Split structure into environments
  • Prepare proformas based on
  • structural assessment
  • detailing general arrangement
  • expected damage
  • environmental exposure
  • usage
  • Prepare inspection testing plan
  • Adopt defect classification code

5
Spray Zone
Intermediate Zone
Splash Zone
Variable Pressure Hollow Leg
High Pressure Hollow Leg
6
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com