Bangarang Musical Engineering - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Bangarang Musical Engineering

Description:

Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat Fox, Matt ... – PowerPoint PPT presentation

Number of Views:78
Avg rating:3.0/5.0
Slides: 14
Provided by: mti96
Category:

less

Transcript and Presenter's Notes

Title: Bangarang Musical Engineering


1
Bangarang Musical Engineering
  • University of Notre Dame
  • Department of Aerospace and Mechanical
    Engineering
  • Group Members Roberto Ayala, Ryan Bradley, Pat
    Fox, Matt Medlock, Mike Tieu
  • 11.16.2006

2
Status of Design Concept
  • Design currently visualized

3
Status of Design Concept
4
Status of Design Concept
  • Project Scheduling
  • On schedule according to class deadlines, but
    slightly behind schedule according to group
    deadlines.
  • Showstoppers
  • Program implementation and debugging

5
Last Weeks Action Items
  • Item
  • - Assemble the prototype
  • Action
  • - Wooden cover was machined by end of class
    11/07
  • - Other parts can be assembled and interfaced
    with microcontroller since circuitry is complete
  • Outcome
  • - All vital components are assembled and
    functional.
  • - Additional components e.g. drum clamps and
    name plate will be incorporated by Monday, Nov
    20th.

6
Last Weeks Action Item
7
Last Weeks Action Items
  • Item
  • - Software development
  • Action
  • - Met with Mr. Brownell on 11.14.06
  • Outcome
  • - Program was completed and successfully
    compiled on 11.14.06

8
Last Weeks Action Items
  • Item
  • - Begin prototype testing
  • Action
  • - Tested solenoid performance under different
    voltage drop values. (12 V, 10.29V, 9V)
  • - Obtained value for maximum attainable beat
    rate
  • Outcomes
  • - Variable volume generation was achieved
  • - Maximum attainable beat rate is 5 beats/sec,
    with a solenoid cycle of 0.2 sec

9
This Weeks Action Items
  • Item
  • - Begin organizing information and graphics for
    CDR
  • Action
  • - Meeting has been planned for Monday, Nov. 20th
    in order to evaluate and select material for
    presentation based on preliminary outline

10
  • CDR
  • Slide
  • 1. Design Objectives
  • a. Assignment
  • b. Concept selection approach
  • 2. Original Concept
  • a. Preliminary concept
  • b. Research of target market
  • 3. Chosen Concept
  • a. Bangerautomation Drumset
  • b. Product description and features
  • 4. Technical Issues (feasibility)
  • a. Drumstick actuation (solenoid)
  • b. Variable force/volume capability
  • c. Minimizing system response time
  • d. Interface of vital components
  • 5. Quantifiable Decision
  • a. Required force generated by solenoid
  • b. Spring selection with appropriate
    characteristics

11
This Weeks Action Items
  • Item Test and debug program
  • Action
  • - Load programming into microcontroller and test
    its compatibility with prototype hardware
  • - Starting 11.16.06

12
This Weeks Action Items
  • Item
  • - Maximize prototype performance
  • Action
  • - Meeting Friday Nov. 17th in order to address
  • a. Tune prototype settings in order to
    minimize response time and variable sound
    quality
  • b. Reduce undesired noise produced by solenoid
    rod impact

13
Questions????
Write a Comment
User Comments (0)
About PowerShow.com