Emergency Material Dispatching Model Based on Particle Swarm Optimization - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Emergency Material Dispatching Model Based on Particle Swarm Optimization

Description:

Title: 1 Author: for my dream Last modified by: Paul.Sun Document presentation format: (4:3) Other titles: Arial Calibri Times New Roman ... – PowerPoint PPT presentation

Number of Views:123
Avg rating:3.0/5.0
Slides: 26
Provided by: form174
Category:

less

Transcript and Presenter's Notes

Title: Emergency Material Dispatching Model Based on Particle Swarm Optimization


1
Emergency Material Dispatching Model Based on
Particle Swarm Optimization
  • ???
  • 2010.5.29

2
Outline
  • Introduction
  • Literature Review
  • Model Formulations
  • PSO-Based Solution Algorithm
  • Numerical Analysis
  • Conclusions

3
Introduction
  • The emergency material dispatching problem is a
    complicated process.
  • It involves many factors
  • objective selection
  • way of transportation
  • transportation routing selection
  • and so on.

4
Literature Review 1
author Literature review
Kemball C. and Stephenson (1984) pointed out that material logistics management is vital to raise transportation effectiveness in emergency material dispatching.
Ray J. (1987) Eldessouki W.M. (1998) research the emergency material transportation problem considering the minimum transportation costs as objective.
Merkle D., Middendorf M. and Schmeck H. (2002) state the resource-constrained scheduling problem is a problem about how to schedule the activities of scheduling between the resource requirements and the resource capacity limit
Groothedde B. et al. (2005) states collaborative intermodal hub networks are able to reduce logistics costs and maintain logistic serve level
5
Literature Review 2
author Literature review
Wei Y. (2007) study the FLP and VRP problems in emergency logistics, and the collaborative relationship between the emergency material dispatching and evacuation
Sun Y., Chi H. and Jia C.L. (2007) analyze the logical resource dispatching mechanism considering the demand of emergency sites and the happening probability of potential emergency sites, using a nonlinear mixed-integer programming model
Weiqin Tang, Zhang M. and Zhang Y. (2009) analyze the characteristics of material dispatching in large-scale emergencies, design the process model.
Song X.Y., Liu F. and Chang C.G. (2010) establish a generalized rough set based multi-object scheduling model for emergency disaster-relief commodity scheduling
6
Literature Review 3
author Literature review
Jalilvand, K. and Shabaninia (2005) use branch-and-bound method solving a scheduling problem.
Pan Y., Yu J. and Da Q.L. (2007) establish a multi-objective emergency-resource scheduling model based on the continuous consumption emergency system, and solve this model using PSO
Lin H. and Xu W.S.(2008) use ideal point method to convert a multi-objective material scheduling model to a single-objective model then use discrete PSO to resolve the model
Sheu J.B.(2007) (2010) studies emergency logistics distribution based on relief- demand, establish a dynamic relief-demand management model for emergency logistics operations under imperfect information conditions in large-scale natural disasters
7
Model Formulations
  • scene
  • Take continuous consumption of material as
    background
  • m disaster areas
  • n emergency material warehouses
  • How to dispatch the material from the n
    warehouses to make the emergency costs smallest .

8
Assumptions
Assumptions
(1)We only consider one cycle of the material dispatching during the whole rescue process
(2)On a practical side, we consider the cost element of dispatching and loss of lacking material as the objective and ignore other factors
(3)In order to simply the model, suppose the times of transporting material to from every warehouse are equal.
9
Notations 1
  • vj(t)material consume speech in Aj at time t
  • Qij maximum supply quantity of material from Wi
    to Aj
  • T the whole time of rescuing cycle
  • rj(t) requirement in Aj at time t
  • Tj transport time of material to Aj
  • Ij(t)shortage quantity of material in Aj at
    time t

10
Notations 2
  • Cij unit cost of material dispatched from Wi to
    Aj
  • ajunit loss cost of lacking material in Aj
  • Bj(Ij(t))the loss cost of material lacked
    quantity Ij(t) in Aj
  • xij quantity of material dispatched from Wi to
    Aj

11
Mathematical Model 1
  • Requirement
  • TC the total emergency cost

12
Mathematical Model 2
  • Subject to

13
PSO-Based Solution Algorithm
  • PSO is a population based on stochastic
    optimization technique developed by Kennedy and
    Eberhart in 1995. PSO is an optimized search
    method on account of swarm intelligence produced
    by cooperation and competition among swarms in
    colony.

14
Steps of PSO
  • Step 1 set the scope of the partial swarm
    preset the accuracy of solutions and the max
    iteration time
  • Step 2 generate the initial partial swarm random
    based on the constraints ,let t1
  • Step 3 calculate the fitness of each partial
    according to the objective function
  • Step 4 compare the current fitness value of the
    partial with the local optimal value and the
    globally optimal value , and update and

15
Steps of PSO
  • Step 5 according to the functions below, update
    the moving speed and position of partial i
  • Step 6 judge if the optimal solution reaches the
    accuracy error or the iteration time reaches the
    max time, if yes, stop, and output the result
    else , tt1 , turn to step 3.

16
Numerical Analysis
The information of Aj The information of Aj The information of Aj The information of Aj
A1 A2 A3
Tj 6 5 8
vj(t) 1 2 1.5
rj(0) 232 324 523
aj 1 3 1
The maximum supply quantity Qij of material from Wi to Aj The maximum supply quantity Qij of material from Wi to Aj The maximum supply quantity Qij of material from Wi to Aj The maximum supply quantity Qij of material from Wi to Aj
W1 42 53 64
W2 35 33 45
W3 96 46 23
W4 24 57 53
W5 32 20 36
17
Numerical Analysis
the unit cost Cij of the material transported from Wi to Aj the unit cost Cij of the material transported from Wi to Aj the unit cost Cij of the material transported from Wi to Aj the unit cost Cij of the material transported from Wi to Aj
W1 2 5 2
W2 3 2 4
W3 2 1 9
W4 4 6 3
W5 3 4 4
18
Numerical Analysis
  • ?0.5,c11.3,c21.1
  • Through 50 iterative operations, we obtain the
    optimal solution

xij W1 W2 W3 W4 W5
A1 42 35 30.7 13 10
A2 15 33 46 16 18
A3 7 5 15 20 20
TC 2338 2338 2338 2338 2338
19
Numerical Analysis
20
Conclusions
  • In our study, a multi-regional emergency material
    dispatching problem with multi-reserve spots on
    continuous consumption of emergency material
    resource is considered, and a nonlinear
    programming model is developed for this problem.

21
References
  • Kemball-Cook D, Stephenson R. Lesson in
    logistics from Somalia. J. Disaster. 8,
    57--66(1984)
  • Eldessouki W.M. Some development in
    transportation network analysis and design with
    application to emergency management problem.
    Partial North Carolina State University (1998)
  • Merkle D. Middendorf M. Schmeck H. Ant colony
    optimization for resource-constrained project
    scheduling. J. IEEE transactions on Evol.Comput.
    4, 333-346(2002)
  • Groothedde B., Ruijgrok C., Tavasszy L. Towards
    collaborative intermodal hub networks a case
    study in the fast moving consumer goods market.
    J. Transportation Research Part E Logistics
    Transportation Review. 6, 56--583(2005)

22
  • Wei Y., Özdamar L. A dynamic logistics
    coordination model for evacuation and support in
    disaster response activities. J. European Journal
    of Operational Research. 3, 1177-1193(2007)
  • Wei Y., Kumar A. Ant colony optimization for
    disaster relief operations. J. Transportation
    Research Part E Logistics Transportation Review.
    6, 660--672(2007)
  • Sun Y., Chi H., Jia Ch.L. Nonlinear
    Mixed-integer Programming Model for Emergency
    Resource Dispatching With Multi-path. J.
    Operations Research and Management Science. 5,
    5--8(2007)(in Chinese)
  • Tang W.Q., Zhang M., Zhang Y. Process model for
    materials dispatching in large-scale emergencies.
    J. China Safety Science Journal. 1,
    33--37(2009)(in Chinese)

23
  • Song X.Y., Liu F., Chang Ch.G. A disaster-relief
    commodity transport schedule model based on
    generalized rough sets. J. Control Engineering of
    China. 1, 120--122(2010)(in Chinese)
  • Jalilvand A., Khanmohammadi S., Shabaninia F.
    Scheduling of sequence-dependant jobs on parallel
    multiprocessor systems using a branch and bound
    based Petri net. J. Emerging technologies,
    Proceedings of the IEEE symposium. PP.
    334-339(2005)
  • Pan Y., Yu J., Da Q.L. Emergency resources
    scheduling on continuous consumption system based
    on particle swarm optimization. Journal of
    Systems Engineering. 5, 556560(2007)(in Chinese)
  • Lin H., Xu W.S. Research of emergency materials
    scheduling solved by binary PSO. J. Computer
    Knowledge and Technology. 7, 1503--1505,
    1511(2008) (in Chinese)

24
  • Sheu J.B. An emergency logistics distribution
    approach for quick response to urgent relief
    demand in disasters. J. Transportation Research
    Part E Logistics Transportation Review. 6,
    687--709(2007)
  • Sheu J.B. Dynamic relief-demand management for
    emergency logistics operations under large-scale
    disasters. J. Transportation Research Part E
    Logistics Transportation Review. 1, 1--17(2010)

25
Thank You!
http//log.seu.edu.cn 2016/4/23
Write a Comment
User Comments (0)
About PowerShow.com